Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.6 LAccepted-AOC | ₹6.6 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹6.9 L+₹25,975.95 (3.91%)Rejected-AOC | ₹6.9 L+₹25,975.95 (3.91%) | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | YOOSUF KUNJU M L2 | ABDUL SHUKKOR A L1 |
|---|---|---|---|---|---|
| 1.00pond | |||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 81.78 | cum | 339.4 ₹27,756.13 | 326.63 ₹26,711.8 Lowest |
| 1.00 | OD433685/2025-2026:DR masonry-Dry Rubble with hard stone in foundation and plinth up to plinth level as per direction of Engineer-in-charges | 97.44 | cum | 5,238.79 ₹5,10,467.7 | 5,041.68 ₹4,91,261.3 Lowest |
| 1.00 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 8.7 | sqm | 719.78 ₹6,262.09 | 692.7 ₹6,026.49 Lowest |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 4.22 | cum | 9,896.15 ₹41,761.75 | 9,523.8 ₹40,190.44 Lowest |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 426.17 | kilogram | 106.08 ₹45,208.11 | 102.09 ₹43,507.7 Lowest |
| 1.01 | OD433701/2025-2026:Random rubble masonry with hard stone in foundation and plinth up to plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand) without levelling course as per direction of Engineers in charge | 6.53 | cum | 7,164.46 ₹46,748.1 | 6,894.89 ₹44,989.16 Lowest |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.09 | cum | 8,714.14 ₹9,480.98 | 8,386.26 ₹9,124.25 Lowest |
| 1.01 | OD439360/2025-2026:Supplying and fixing Metal Name Board of size 1200x600x0.8mm using MS Sheet
and 35x35x5mm Angle section with 50mm diameter,2mm thick and 1.5 m long GI
Pipe for post erected in concerete of CC 1:2:4 having size 30X30X50cm as per
directions of Departmental officers in charge | 1 | no | 2,717.04 ₹2,717.04 | 2,614.81 ₹2,614.81 Lowest |
Tender Value
₹7.3 L
EMD Value
₹18,294
Closing Date
19 Feb 2026, 6:00 pmClosed
AE
The Assistant Engineer, LIDEW Section,KRISHNAPURAM Grama Panchayat
Annual Plan-Krishnapuram GP 2025-2026-RENOVATION OF UNAKKAYYATH POND SECOND STAGE-S0097/26
2026_LSGD_834749_1
T4/AE/LIDEW/KPM/25-26-097
Open Tender
Civil Works - Others
Item Wise
180 days
KRISHNAPURAM GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,615
Yes
₹18,294
Yes
18 Jun 2026
10 Feb 2026
21 Feb 2026
10 Feb 2026
19 Feb 2026
10 Feb 2026
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
OD433685/2025-2026:DR masonry-Dry Rubble with hard stone in foundation and plinth up to plinth level as per direction of Engineer-in-charges
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
OD433701/2025-2026:Random rubble masonry with hard stone in foundation and plinth up to plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand) without levelling course as per direction of Engineers in charge
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
OD439360/2025-2026:Supplying and fixing Metal Name Board of size 1200x600x0.8mm using MS Sheet and 35x35x5mm Angle section with 50mm diameter,2mm thick and 1.5 m long GI Pipe for post erected in concerete of CC 1:2:4 having size 30X30X50cm as per directions of Departmental officers in charge
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1404402.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
AFF.pdf
Tender Documents • 0.24 MB
FOT.pdf
Tender Documents • 0.25 MB
PRAG.pdf
Tender Documents • 0.26 MB
BOQ_1404402.xls
BOQ • 0.30 MB
sbd.pdf
Tender Documents • 1.91 MB
EPAYFORM.pdf
Tender Documents • 0.23 MB
IGPACT.pdf
Tender Documents • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .