Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹84.8 LAccepted-AOC FLAT NO 203 KADIRIS APURUPA URBAN 2 ND FLOOR LAXMI NAGAR BOTANICAL GARDEN ROAD KONDAPUR HYDERABAD 500084 RANGAREDDI TELANGANA 500084 | HYDERABAD | TELANGANA | 500084 | ₹84.8 L | L1 | Accepted-AOC Being L1 |
| 2 | L2₹90 L+₹5.2 L (6.08%)Rejected-AOC | ₹90 L+₹5.2 L (6.08%) | L2 | Rejected-AOC Being L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not eligible as per NIT |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not eligible as per NIT |
| 5 | Rejected-Technical FLAT NO 3 3RD FLOOR EDEN MOORE 15 A 1 MANIK BANDYOPADHYAY SARANI MANIK BANDYOPADHYAY SARANI KOLKATA WEST BENGAL 700040 | KOLKATA | WEST BENGAL | 700040 | - | - | Rejected-Technical Not eligible as per NIT |
Tender Value
₹99.7 L
Closing Date
28 Jun 2021, 6:00 pmClosed
AGM EE EMD VIII
NEW OPERATIONAL BUILDING AAI NSCBI AIRPORT KOLKATA
Annual Comprehensive Maintenance Operation and monitoring of 2 MWp Roof Top type Solar Power Plant at NSCBI Airport Kolkata
2021_AAI_77422_1
AAC/EMD-VIII/2MWp Solar AMC/2021-22
Open Tender
Electrical Works
Item Rate
1095 days
NSCBI AIRPORT KOLKATA
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,120
Yes
Exempted
9 Mar 2022
29 May 2021
30 Jun 2021
30 May 2021
28 Jun 2021
30 May 2021
30 May 2021 - 18 Jun 2021
Amount
Annual maintenance and monitoring of 2 MWp roof top type solar photovoltaic power plant installations comprising of installed solar PV modules, structural support systems, power conditioning units, lightning and earthing, protection systems, solar system cables, LT Evacuation / injection points/terminals, auxiliary & control supply system, DC & AC distribution boards along with available switchgears & control gears, invertor rooms along with AC & DC power cables, other alied communication and control cables, including solar plant radiation & environment monitoring system excluding SCADA system and including cleaning of modules as per scope of works & technical specification enclosed and as directed by the Engineer-in-charge. (a) 1st Year
Annual maintenance and monitoring of 2 MWp roof top type solar photovoltaic power plant installations comprising of installed solar PV modules, structural support systems, power conditioning units, lightning and earthing, protection systems, solar system cables, LT Evacuation / injection points/terminals, auxiliary & control supply system, DC & AC distribution boards along with available switchgears & control gears, invertor rooms along with AC & DC power cables, other alied communication and control cables, including solar plant radiation & environment monitoring system excluding SCADA system and including cleaning of modules as per scope of works & technical specification enclosed and as directed by the Engineer-in-charge. (b) 2nd Year
Annual maintenance and monitoring of 2 MWp roof top type solar photovoltaic power plant installations comprising of installed solar PV modules, structural support systems, power conditioning units, lightning and earthing, protection systems, solar system cables, LT Evacuation / injection points/terminals, auxiliary & control supply system, DC & AC distribution boards along with available switchgears & control gears, invertor rooms along with AC & DC power cables, other alied communication and control cables, including solar plant radiation & environment monitoring system excluding SCADA system and including cleaning of modules as per scope of works & technical specification enclosed and as directed by the Engineer-in-charge. (c ) 3rd Year
Annual comprehensive maintenance of following Inverters as per OEM standard and as directed by the Engineer-in-Charge. (i) 62.5 KWp - 33 nos. (ii) 33 KWp - 01 no. (a) 1st Year
Annual comprehensive maintenance of following Inverters as per OEM standard and as directed by the Engineer-in-Charge. (i) 62.5 KWp - 33 nos. (ii) 33 KWp - 01 no. (b) 2nd Year
Annual comprehensive maintenance of following Inverters as per OEM standard and as directed by the Engineer-in-Charge. (i) 62.5 KWp - 33 nos. (ii) 33 KWp - 01 no. (c ) 3rd Year
Annual Comprehensive maintenance of the complete SCADA System (Hard Ware & Soft Ware) including necessary network connectivity related to the above installations to deliver all the status of 2 MWp PV Solar System at the control room as per item no. 01 on daily basis and as directed by the Engineer-in-Charge. (a) 1st Year.
Annual Comprehensive maintenance of the complete SCADA System (Hard Ware & Soft Ware) including necessary network connectivity related to the above installations to deliver all the status of 2 MWp PV Solar System at the control room as per item no. 01 on daily basis and as directed by the Engineer-in-Charge. (b) 2nd Year
Annual Comprehensive maintenance of the complete SCADA System (Hard Ware & Soft Ware) including necessary network connectivity related to the above installations to deliver all the status of 2 MWp PV Solar System at the control room as per item no. 01 on daily basis and as directed by the Engineer-in-Charge. (c ) 3rd Year
VIKRAM SOLAR LIMITED
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .