Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 02 ANNEXE 2ND FLOOR RAMACHANDRAPURAM HYDERABAD 500032 INDIA | HYDERABAD | HYDERABAD | TELANGANA | 500032 | Admitted-Finance |
| 2 | Admitted-Finance 0 NARA MEERUT ROAD MUZAFFARNAGAR UTTAR PRADESH 251001 | MUZAFFARNAGAR | UTTAR PRADESH | 251001 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
29 Mar 2021, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
As per NIT
As per NIT
BOILERS_3X150 TPH WITH DEAERATOR SYSTEM INCLUDING UTILITY CONTROL ROOM FOR LUPECH J18 PROJECT AT IOCL GUJARAT REFINERY
2021_REFHQ_130716_1
077154C/T/LuPech(J18)/PACKAGE1
Open Tender
Lump Sum TurnKey
Lump-sum
510 days
Vadodara
As per NIT
5 documents required · 5 mandatory
Exempted
Online
31 May 2021
23 Jan 2021
30 Mar 2021
23 Jan 2021
29 Mar 2021
22 Feb 2021
23 Jan 2021 - 8 Feb 2021
9 Feb 2021
180 days
Amount
Project Management, Consistency Checks, Process Design and Engineering, Detailed Design and Engineering including HAZOP/HAZID/SIL Study & Other Safety Studies as mentioned in Bidding Documents, enabling jobs, Topography Survey, Soil Investigation mentioned in the bid and co-ordination for the same with Owner/PMC, Complete Procurement (including chemicals, catalysts, first fill of chemicals and lubricants, consumables, special tools and tackles, Pre-Commissioning Spares, Commissioning Spares, Start-up spares & Mandatory spares), Fabrication, Manufacturing, Quality Assurance, Inspection & Expediting, Third Party Inspection, Supplies, Transportation, Insurance, Handling & Storage of all Equipment, Materials, items and other Construction Materials at yard/site, Fabrication, Assembly, Construction, Erection, Installation of all plant machinery including Civil, Structural, Mechanical, Piping, Electrical and Instrumentation including tie-ins, Testing, Insulation and refractory works, Painting, Fireproofing, First fill of chemicals and lubricants, Obtaining all Statutory Approvals (except for Environment Clearance), Pre-commissioning & Mechanical Completion of Plant, Preparation of plant specific Operating & Maintenance manuals, Start-up, Commissioning and Performance Guarantee Test Runs (PGTR), Training of Owner’s O&M personnel at site, consumables (Chemicals & Lubricants) for 6 (six) months operation, Contract closure activities of OIL & GAS FIRED BOILERS (3 X 150 TPH) WITH DEAERATOR SYSTEM including Utility Control Room for Petrochemical and Lube Integration Project “LuPech” (J-18) Project at IOCL Gujarat Refinery, Final invoice/billing and handing over of the facilities with Final and “As Built” drawing/documentation, supply of spares with necessary support and services during defect liability period and supply of Chemicals, Catalysts (if any) Tool & Tackles, Consumables, Lubricants etc. for initial charge and replenishment of any loss of these during Commissioning up to handing over after successful PGTR of the facilities.
Lumpsum Price for completion of scope of work as per the Bidding Document
Description of Work / Item(s)
Amount
Lumpsum Price for Supply portion for completion of Scope of Work as per Bidding Document
SUPPLY PORTION FOR COMPLETION OF SCOPE OF WORK AS PER BIDDING DOCUMENT
Description of Work / Item(s)
Amount
ENGINEERING PRICE (PROCESS DESIGN, DETAILED DESIGN & ENGINEERING AS PER REQUIREMENTS DETAILED OUT IN VARIOUS SECTIONS OF BIDDING DOCUMENT
ENGINEERING PRICE (RESIDUAL PROCESS DESIGN AND DETAIL ENGINEERING
LUMPSUM PRICE FOR CONSTRUCTION PORTION AS PER REQUIREMENTS DETAILED OUT IN VARIOUS SECTIONS OF THE BIDDING DOCUMENT
CONSTRUCTION PORTION AS PER THE REQUIREMENTS DEFINED IN BIDDING DOCUMENT
TOTAL OF ENGINEERING AND CONSTRUCTION PRICE [1 + 2]
TOTAL OF ENGINEERING AND CONSTRUCTION PRICE [1 + 2]
Description of Work / Item(s)
Amount
GST ON SUPPLY OF GOODS (PART BREAKUP OF SP-1 )
GST ON SUPPLY OF SERVICES (PART BREAKUP OF SP-2 )
Description of Work / Item(s)
Amount
AMOUNT OF INDIAN COMPONENT
Description of Work / Item(s)
Amount
Annual charges for Post Warranty maintenance for AC UPS as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for VFDs as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for SOFT STARTERS as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for DCS as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for PLC as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for CCTV system as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for Paging system as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for Analyser systems including AMADAS as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for CEMS Data Acquisition / Logging System as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for Machine Monitoring System as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Fifth year after expiry of defect liability
Description of Work / Item(s)
Amount
GUARANTEED UTILITIES FOR BOILER PACKAGE AS PER BIDDING DOCUMENT- CASE-01
GUARANTEED POWER CONSUMPTION
FUEL GAS (RLNG) CONSUMPTION
GUARANTEED UTILITIES FOR BOILER PACKAGE AS PER BIDDING DOCUMENT - CASE-02
GUARANTEED POWER CONSUMPTION
FUEL GAS (RLNG) CONSUMPTION
FUEL OIL CONSUMPTION
GUARANTEED UTILITIES FOR BOILER PACKAGE AS PER BIDDING DOCUMENT - CASE-03
GUARANTEED POWER CONSUMPTION
FUEL OIL CONSUMPTION
Isgec Heavy Engineering Ltd
Isgec Heavy Engineering Ltd
Isgec Heavy Engineering Ltd
THERMAX BABCOCK WILCOX ENERGY SOLUTIONS PRIVATE LIMITE
Isgec Heavy Engineering Ltd
THERMAX BABCOCK WILCOX ENERGY SOLUTIONS PRIVATE LIMITE
THERMAX BABCOCK WILCOX ENERGY SOLUTIONS PRIVATE LIMITE
THERMAX BABCOCK WILCOX ENERGY SOLUTIONS PRIVATE LIMITE
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .