| 1 | L1₹57.4 LAccepted-AOC GOVT CONTRACTOR VILLAGE PO RAJA KA TALAB TEHSIL FATEHPUR DISTT KANGRA HP | KANGRA | HIMACHAL PRADESH | 176001 | ₹57.4 L Quoted ₹58.0 L | L1 | Accepted-AOC accept |
| 2 | L2₹66.5 L+₹8.5 L (14.7%)Rejected-Finance | ₹66.5 L+₹8.5 L (14.7%) | L2 | Rejected-Finance reject |
| 3 | L3₹67.6 L+₹9.5 L (16.4%)Rejected-Finance VILL PO GHANALWIN TEHSIL GHUMARWIN DISTT BILASPUR H P | BILASPUR | HIMACHAL PRADESH | 174001 | ₹67.6 L+₹9.5 L (16.4%) | L3 | Rejected-Finance reject |
| 4 | Not Admitted-Fee/PreQual/Technical VILLAGE PO AND TEHSIL DEHRA DISTT KANGRA HP | KANGRA | HIMACHAL PRADESH | 175013 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical HIMACHAL PRADESH HP | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Samjeev Malhotra L2 | Vishal Chauhan L3 | KULDEEP DOGRA L1 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundations,trenches etc.in earth work in all kind & upto all height stacking in excavate soil not more than 3mt clear from the edge of the excavation & then returning the stacked soil in 15cm layers,when required into plinths sides of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed by the Engineer-in-Charge with in all leads & lifts. | 103.18 | cum | 805 ₹83,059.9 | 810 ₹83,575.8 | 792 ₹81,718.56 Lowest |
| 2.00 | Providing and laying cement concrete 1:3:6(One cement :Three sand : Six graded stone aggregate 40mm nominal size and curing complete excluding the cost of form work in foundation and plinth within all leads and lifts. | 6.24 | cum | 7,800 ₹48,672 | 7,825 ₹48,828 | 7,640 ₹47,673.6 Lowest |
| 3.00Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm, so as to give a fair finish including centring, shuttering, strutting and propping etc. with wooden battons and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4.00mtrs. and removal of the same for in-situ-reinforced and plain concrete work in:- | ||||||
| 4.00 | Foundation, Footing bases of Columns and the like & Mass concrete.within all leads and lifts complete in all respect as per direction of Engineer in charge. | 2.4 | sqm | 450 ₹1,080 | 460 ₹1,104 | 440 ₹1,056 Lowest |
| 5.00 | Vertical surfaces such as walls ( Any Thickness ) partitions and the like including attached Plasters buttress Plinth and string courses and the like .within all leads and lifts | 416.46 | sqm | 450 ₹1,87,407 | 460 ₹1,91,571.6 | 430 ₹1,79,077.8 Lowest |
| 6.00 | Flat surfaces such as soffits of suspended floors, roofs, landing and the like floor etc. upto 200mm in thickness within all leads and lifts. | 50.67 | sqm | 620 ₹31,415.4 | 640 ₹32,428.8 | 615 ₹31,162.05 Lowest |
| 7.00 | Edges of slabs and breaks in floors and walls runder 20cm wide complete in all respect. | 12.83 | sqm | 170 ₹2,181.1 Lowest | 175 ₹2,245.25 | 170 ₹2,181.1 Lowest |
| 8.00Providing and laying cement concrete 1:1.5:3 (1 cement: 1.5 sand : 3 graded stone aggregate 20mm nominal size) and curing complete excluding the cost of form work and reinforcment for RCC work in :-In foundation and plinth within all leads and lifts complete in allrespect. | ||||||
| 9.00 | In Foundation, fotting bases of columns and the like and mass concrete within all leads and lifts. | 2.03 | cum | 8,800 ₹17,864 Lowest | 8,820 ₹17,904.6 | 8,940 ₹18,148.2 |
| 10.00 | Infoundation plinth within all leads and lifts asper direction of Engineer in charge. | 12.73 | cum | 8,800 ₹1,12,024 | 8,820 ₹1,12,278.6 | 8,640 ₹1,09,987.2 Lowest |
Tender Value
₹57.7 L
EMD Value
₹1.2 L
Closing Date
31 Jan 2026, 11:00 amClosed
EE
Jal Shakti Division Jawalamukhi
Retrofitting on existing STP for septage Management in Tehsil Jawalamukhi Distt. Kangra
2026_HPIPH_126412_1
JAM-KNG02-742
Open Tender
Civil Works
Item Rate
180 days
Jawalamukhi
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,000
EE Jawalamukhi
₹1.2 L
18 Feb 2026
22 Jan 2026
31 Jan 2026
22 Jan 2026
31 Jan 2026
22 Jan 2026
Excavation in foundations,trenches etc.in earth work in all kind & upto all height stacking in excavate soil not more than 3mt clear from the edge of the excavation & then returning the stacked soil in 15cm layers,when required into plinths sides of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed by the Engineer-in-Charge with in all leads & lifts.
Providing and laying cement concrete 1:3:6(One cement :Three sand : Six graded stone aggregate 40mm nominal size and curing complete excluding the cost of form work in foundation and plinth within all leads and lifts.
Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm, so as to give a fair finish including centring, shuttering, strutting and propping etc. with wooden battons and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4.00mtrs. and removal of the same for in-situ-reinforced and plain concrete work in:-
Foundation, Footing bases of Columns and the like & Mass concrete.within all leads and lifts complete in all respect as per direction of Engineer in charge.
Vertical surfaces such as walls ( Any Thickness ) partitions and the like including attached Plasters buttress Plinth and string courses and the like .within all leads and lifts
Flat surfaces such as soffits of suspended floors, roofs, landing and the like floor etc. upto 200mm in thickness within all leads and lifts.
Edges of slabs and breaks in floors and walls runder 20cm wide complete in all respect.
Providing and laying cement concrete 1:1.5:3 (1 cement: 1.5 sand : 3 graded stone aggregate 20mm nominal size) and curing complete excluding the cost of form work and reinforcment for RCC work in :-In foundation and plinth within all leads and lifts complete in allrespect.
In Foundation, fotting bases of columns and the like and mass concrete within all leads and lifts.
Infoundation plinth within all leads and lifts asper direction of Engineer in charge.
Wall ( any thickness but not less than 0.10 mtrs thickness ) attached pillaster, buttresss plinth & string courses etc. from top of foundation level upto floor two level within all leads and lifts.
Providing tor steel reinforcement for RCC work including bending, binding and placing in position complete upto floor two level within all leads and lifts.
Providing in RCC. Work smooth finishing of the exposed surface with cement mortar 1:3(1cement:3sand) complete in all respect.
Steel work welded in built up sections, trusses and framed work, including cutting , hosting , fixing in position and applying a priming coat of relead paint (In gratings framed gurad bars, ladders, raillings, brackets and similar works.)
White washing with lime on un-decorated walls surfaces( two coats) to give an even shade, including thoroughly brooming the surface to remove all dirt, dust mortar, dust and other foreign matter within all leads and lifts.
Providing and laying cement concrete work 1:2:4 (One cement : Two sand : Four graded stone aggregate 20mm nominal size and curing complete excluding cost of form work and reinforcement for reinforced concrete work in:-
Suspended floor, roofs landing and shelves and their supports balconies beams girders bressumers and cantilevers upto floor two level within all leads and lifts.
Providing Laying jointing and testing of DI pipe spigot and socketed pipe with CML(SBR tyton push on join.complete in all respects as per IS:8329-2900 class K7 dia mensions weight and test pressuers in all respect and as per patest ammendments or adition. within all leads and lifts complete in all respect.
Providing and jointing tyton (Push on joints) to Ductile iron pipe and fitting including testing of the joints, cost of rubber gasket (EDPM quality) conforming to IS 3382 latest edition/ ammendments complete in all respect withinallleadsandliftsandasperlatest ammendments or edition.
150mm dia
Providing and fixing all socket DI Tee/ Crossasper IS:8329 or letest additional amendments including carriage of material within all leads lifts complete in all respect
150mm dia
Providing and fixing Cast Iron Sluice valve (IS148846:2000).
Sluice Valves and NRVs, Bends,100mm,150 mm, 200mm, Kirloskar, IVC, KSB, Upadhya (Calcutta) Fouress
Sludgede watering system (screw press)with all necessary arrangements with 9kl/hr capacity
Control panel, L& T components, cable, R/R/Havells within all leads and lifts complete in all respect.
Cable, RR/ Havells within all leads and lifts
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.52 MB
Form6.pdf
Tender Documents • 0.42 MB
Form8.pdf
Tender Documents • 0.82 MB
Termsandconditions.pdf
Tender Documents • 0.39 MB
BOQ_186363.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .