| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.8 LAdmitted-Fee/PreQual/Technical/Finance | ₹26.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹33.1 L+₹6.3 L (23.6%)Admitted-Fee/PreQual/Technical/Finance | ₹33.1 L+₹6.3 L (23.6%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹33.4 L+₹6.6 L (24.7%)Admitted-Fee/PreQual/Technical/Finance VILLAGE KUMRADI MANGLOUR ROORKEE HARIDWAR 247656 | HARIDWAR | UTTARAKHAND | 247656 | ₹33.4 L+₹6.6 L (24.7%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹37.1 L+₹10.3 L (38.3%)Admitted-Fee/PreQual/Technical/Finance | ₹37.1 L+₹10.3 L (38.3%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹37.8 L+₹11.0 L (41.2%)Admitted-Fee/PreQual/Technical/Finance | ₹37.8 L+₹11.0 L (41.2%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | S S CONSTRUCTION COMPANY L3 | DIGAMBAR SINGH L4 | M /S NATHI LAL UNIYAL L5 | chandra mohan L1 | PRAHLAD SINGH RAWAT L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling roofing including ridges, hips, valleys and gutters etc.,and stacking the material within 50 metres lead of: G.S. Sheet | 222.4 | sqm | 170.61 ₹37,943.66 | 189.28 ₹42,095.87 | 193.14 ₹42,954.34 | 90 ₹20,016 Lowest | 175 ₹38,920 |
| 2.00 | Dismentaling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 389.66 | sqm | 56.52 ₹22,023.81 | 62.71 ₹24,435.83 | 63.99 ₹24,934.6 | 27 ₹10,520.93 Lowest | 55 ₹21,431.52 |
| 3.00 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 28.56 | cum | 2,517.92 ₹71,911.8 | 2,793.25 ₹79,775.22 | 2,850.26 ₹81,403.43 | 1,200 ₹34,272 Lowest | 2,640 ₹75,398.4 |
| 4.00 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. | 15.28 | cum | 2,131 ₹32,561.68 | 2,364.03 ₹36,122.38 | 2,412.28 ₹36,859.64 | 1,100 ₹16,808 Lowest | 2,300 ₹35,144 |
| 5.00 | Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete | 289.86 | sqm | 20.43 ₹5,921.76 | 22.67 ₹6,571.04 | 23.13 ₹6,704.37 | 15 ₹4,347.84 Lowest | 20 ₹5,797.12 |
| 6.00 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm | 8.4 | sqm | 75.91 ₹637.64 | 84.22 ₹707.45 | 85.94 ₹721.9 | 45 ₹378 Lowest | 80 ₹672 |
| 7.00 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead : Of area 3 sq. metres and below | 14 | no | 379.81 ₹5,317.34 | 421.35 ₹5,898.9 | 429.95 ₹6,019.3 | 200 ₹2,800 Lowest | 420 ₹5,880 |
| 8.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. | 13.32 | cum | 183.59 ₹2,445.42 | 203.67 ₹2,712.88 | 207.83 ₹2,768.3 | 150 ₹1,998 Lowest | 200 ₹2,664 |
| 9.00 | Providing and laying in cement concrte 1:4:8(1cement :4fine sand:8graded brick aggregated 40mm .nominal size.) and curing complete including cost of form work in foundation and floors. | 11.05 | cum | 7,046.14 ₹77,859.85 | 7,816.64 ₹86,373.87 | 7,976.16 ₹88,136.57 | 5,500 ₹60,775 Lowest | 7,900 ₹87,295 |
| 10.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 3.4 | cum | 9,356.66 ₹31,812.64 | 10,379.82 ₹35,291.39 | 10,591.65 ₹36,011.61 | 8,350 ₹28,390 Lowest | 10,000 ₹34,000 |
Tender Value
₹44.6 L
EMD Value
₹90,000
Closing Date
8 Jun 2026, 3:00 pmClosed
Office of EE Project Division Dehradun
Office of EE Project Division Dehradun
REPAIRING WORK OF GODAM AT GOVERNMENT GRAIN STORE AT NANDANAGAR BLOCK NANDANAGAR GHAT DISTT-CHAMOLI
2026_IRDCE_95725_1
04/EE/2026-27
Open Tender
Civil Works
Item Rate
180 days
NANDANAGAR BLOCK NANDANAGAR GHAT DISTT-CHAMOLI
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
Office of Executive Engineer Project Division DDun
₹90,000
Office of EE Project Division Dehradun
12 Jun 2026
22 May 2026
8 Jun 2026
22 May 2026
8 Jun 2026
22 May 2026
26 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling roofing including ridges, hips, valleys and gutters etc.,and stacking the material within 50 metres lead of: G.S. Sheet | 222.4 | sqm | - | - |
| 2 | Dismentaling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 389.66 | sqm | - | - |
| 3 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 28.56 | cum | - | - |
| 4 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. | 15.28 | cum | - | - |
| 5 | Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete | 289.86 | sqm | - | - |
| 6 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm | 8.4 | sqm | - | - |
| 7 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead : Of area 3 sq. metres and below | 14 | no | - | - |
| 8 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. | 13.32 | cum | - | - |
| 9 | Providing and laying in cement concrte 1:4:8(1cement :4fine sand:8graded brick aggregated 40mm .nominal size.) and curing complete including cost of form work in foundation and floors. | 11.05 | cum | - | - |
| 10 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 3.4 | cum | - | - |
stage.html
html • 0.03 MB
finance_113204.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.19 MB
BOQ_113204.xls
BOQ • 0.44 MB
SbdFoodsupplygodown.pdf
Tender Documents • 2.71 MB
TenderSBDrelated.pdf
PDF • 4.69 MB
corrigendummNandanagar.pdf
PDF • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .