| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹89.7 LAccepted-AOC | ₹89.7 L | L-1 | Accepted-AOC 1st lowest |
| 2 | L-2₹90.0 L+₹30,998.65 (0.35%)Rejected-AOC | ₹90.0 L+₹30,998.65 (0.35%) | L-2 | Rejected-AOC 2nd lowest |
| 3 | L-2₹90.0 L+₹30,998.65 (0.35%)Rejected-AOC | ₹90.0 L+₹30,998.65 (0.35%) | L-2 | Rejected-AOC 2nd lowest |
| 4 | L-2₹90.0 L+₹30,998.65 (0.35%)Rejected-AOC | ₹90.0 L+₹30,998.65 (0.35%) | L-2 | Rejected-AOC 2nd lowest |
Tender Value
₹100.0 L
EMD Value
₹99,996
Closing Date
25 Mar 2026, 5:00 pmClosed
SUPERINTENDING ENGINEER (R AND B) DIVISION BARGARH
O/O THE SUPERINTENDING ENGINEER (R AND B) DIVISION BARGARH, AT-NEAR GOVT BUS STAND INFRONT OF WOMENS COLLEGE BARGARH
BUILDING WORK (CIVIL, EI AND PH)
2026_EICCL_127348_1
IFB-SE PWD-26 OF 2025-26
Open Tender
Civil Works - Buildings
Percentage
180 days
ATTABIRA
PLEASE REFER THE TENDER DOCUMENTS
2 documents required · 2 mandatory
₹10,000
₹99,996
Yes
5 Jun 2026
17 Mar 2026
26 Mar 2026
17 Mar 2026
25 Mar 2026
17 Mar 2026
17 Mar 2026 - 25 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL WORKS
Earth work in excavation of foundation trenches in hard soil including dressing of sides and levelling the bed up to the required depth and depositing the excavated materials away from the work site within 50m initial lead & 1.5m initial lift. complete as directed by the E.I.C.(As Per AR Page No.-1, Item No.-1)
All kind of soils. | 394.22 | Cum | 276.9 | ₹1,09,159.52 |
| 2 | Supplying of filling sand in foundation and plinth including watering,ramming, consolidating and dressing, labours, tools, taxes etc., all complete as per the specification and direction of E.I.C. | 350.41 | Cum | 876.3 | ₹3,07,064.28 |
| 3 | Cement concrete of proportion (1:3:6) in foundation and floors using 4cm (1 ½”) size clean hard black crusher broken granite stone metal of approved quality and from approved quarry including hoisting, lowering and laying concrete in layers not exceeding 15 cm. (6”) thick to the required level ramming, watering, curing etc. complete including cost, conveyance, royalties and taxes of all materials with all labour, cess and T&P required for the work etc. complete in all respect
Foundation. . | 37.8 | Cum | 6,468 | ₹2,44,490.4 |
| 4 | Providing and lying plain cement concrete of proportion (1:4:8) in foundation and floors using Portland slag cement (PSC) with 40 mm. Size black hard crusher broken granite stone metal and screened and washed sharp sand for mortar of approved quality from approved quarry, washed and cleaned including hoisting, lowering, laying concrete, ramming, watering and curing etc. complete to required levels laid in layers not exceeding 15 cm thick in each layer including cost, conveyance, loading, unloading, royalties and taxes all materials and cost all labours, sundries, T & P required for the work including shoring, shuttering and dewatering if required including hire & running charges of water pump complete as per the instruction of the Engineer-in-Charge. . | 9.38 | Cum | 6,066.8 | ₹56,906.58 |
| 5 | Providing and laying plain cement concrete of proportion 1:2:4 (1 cement : 2 sand : 4 stone agregate 12 mm nominal size) in foundation as levelling course in floor and plinth etc. including tempering, curring, shuttering etc. complete all depth and height as per drawing and Techinal specification and as per direction of the Engineer-in- Charge. | 24.42 | Cum | 8,135.2 | ₹1,98,661.58 |
| 6 | RCC work M-20 grade as per approved designs and drawings having a minimum compressive strength (in work test) 25 N. / Square mm. in 15 cm. cubes at 28 days after mixing and test conducted in accordance with I.S. 456 and I.S. 516 using 12 mm. to 20 mm. size black hard crusher broken granite stone chips and screened and washed sharp sand for mortar of approved quality from approved quarry, washed and cleaned (20 mm. size chips not to exceed 25 % ) to be mixed in concrete mixture with approved grade cement including hoisting, lowering, laying and compacting concrete by using vibrators, watering and curing for 28 days, centring and shuttering and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all labours, sundries, T&P, required for the work etc. complete in all respect but excluding cost and conveyance of M.S. rods or Tor steel and binding wires and labour charges for straightening, cutting, bending etc. of M.S. rods or Tor steel tying the grills and placing in proper position as per direction of the Engineer in charge.
A) Foundation | 43.77 | Cum | 7,011 | ₹3,06,871.47 |
| 6.01 | B) Plinth beam | 22.01 | Cum | 7,882.9 | ₹1,73,502.63 |
| 6.02 | C ) Roof Beam and Column in Superstructure | 38.28 | Cum | 16,284.8 | ₹6,23,382.14 |
| 6.03 | D) Lintel | 2.84 | Cum | 14,690.1 | ₹41,719.88 |
| 6.04 | E) Chajja | 29.97 | Sqm | 1,271.6 | ₹38,109.85 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.80 MB
BOQ_585459.xls
BOQ • 0.39 MB
DTCNIBAttabira.pdf
Tender Documents • 3.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .