SR to E-1 type revenue quarter Ta. Valsad Dist. Valsad (Shed work and other misc. Works)
280868
43 Of 2025-26
Open
Civil - All
Works
Valsad
8 documents required · 8 mandatory
₹900
Yes
Executive Engineer, Valsad (R&B)Division, Valsad
₹17,000
Yes
26 Feb 2026
26 Feb 2026
26 Feb 2026
6 Mar 2026
26 Feb 2026
Name of work :-
SR to E-1 type revenue quarter Ta.Valsad Dist.Valsad ( Shed work and other misce.works)
Bill of Quantities
(A) Percentage Rate Tender (Up to INR 50 Cr. )
Memorandum showing items of work to be carried out
Ite Quantity Unit Estimated Total Amount
Ite Quantity Unit Estimated Total Amount
No. Item of work In figure estimated
Rs. Ps. quantities
1 Steel work, welded in built up sections framed work including cutting, 7292.00 Kg 90.48
hoisting, fixing in position and applying a priming coat of read lead paint
& two coat oil paint. (A)In beams and joists, channels angles Tees, flats,
with connecting plates or angle cleats as in main and cross beams. Hip
and jack rafters, purlins conneted to common rafters and the like.
2 Providing and fixing of Ridge flashing for roof panel shall be made out of 190.00 Sqm 858.67
0.5 mm thick pre coated GI sheet . The Precoated sheet shall be of
minimum 240 mpa steel grade confirming to IS 14246:1995 and shall
have zinc coating of minimum 120 gsm as per IS:277:1992 , 5-7 microns
epoxy primer on both side of the sheet and polyester top coat 15-18
micron. The PPGI Sheet shall have plastic protective guard film of
minimum 25 microns to avoid scratches during transportation. The ridge
shall be fixed to the steel members by pop rivet or self drilling/self
stitching fastners @ maximum 450 mm c/c along length of
capping/flashing etc complete.
3 Finishing wall with weather proof exterior emulsion paint on wall surface 2742.00 Sqm 114.53
(two coats) to give an required shape even shade after thoroughly
brushing the surface to remove all dirt, and remains of loose powdered
materials.etc complete
4 P & L 24" x 24" vitrified 8 mm thick tile flooring over 20 mm (average) 57.00 Sqm 1397.83
base of cement mortar 1:6 ( 1 cement: 6 coarse sand) on new surface or
fixing on existing flooring by adhesive material including dismentaling of
existing flooring and jointed with color cement slurry including finised
with flush pointing & cleaning the surface etc. complete for antiskit
5 Removing dry or oil bound distemper by a washing and scraping and sand 2168.00 Sqm 11.30
papering the wall surface smooth including necessary repairs to scratches
6 Applying two coats of putty & two coats of primer of approved brand and 517.00 Sqm 40.59
manufacture on new wall surface to give an even shade including
thoroughly brushing the surface free from mortar dropping and other
foreign matter and sand papered smooth.
7 Wall painting (two coats) with plastic emulsion paint of approved brand 517.00 Sqm 80.35
and manufacture on undecorated wall surface to give an even shade
including throughly brushing the surface free from mortar droppings and
other foreign matter and sand papered smooth.
8 Providing & laying Synroof Hi Build 1mm thick ecetrometric, premium 190.00 Sqm 579.74
quality acrylic coating as a water proofing membrane finished which
consists a coat of bitumat primer & 80 CSM membrane on terrace with
ultra violet resistance working upto any height with 5 years guarantee
against any leakage etc. complete per detail specification & as directed by
Engineer-in-charge.
9 Wall painting (two coats) with plastic emulsion paint of approved brand 548.00 Sqm 85.76
and manufacture on undecorated ceiling surface to give an even shade
including throughly brushing the surface free from mortar droppings and
other foreign matter and sand papered smooth.
10 6 KG ABC FIRE EXTINGUISHERS REFILLING OF 10.00 Nos 1262.50
VALVE,NOZAL,POWDER/GAS/WATER, STICKER,SAFTY HOOK TIE CABLE
AND COMPLETE ACCESSORIES WITH SUPPLY AND INSTALLATION
11 Providing laying and jointing in true line and level 40mm dia. U.P.V.C. Pipe 30.00 Rmt. 148.12
( SCH- 40) for cold water including fittings as approved by Engineer In
Charge. Pipe shall be fixed on the wall with the help of clamp at every two
metre C/C or shall be concealed as directed including necessary fittings
etc. including testing of pipe
and joints and fixing the same with adhesive solvent, including cost of all
12 Removing, Repairing and Refixing Old existing wooden door shutter 14.00 Nos 1324.11
including repairing the shutter/frame using Randha machine and
replacing old fixture and fastening with new SS 304 grade fixtures like
Hinges, 1 Stoppers, 1 Aldrop , 2 Handle & 1 lock etc. and as directed by
engineer inRepairing
13 Removing, charge etcand
Refixing existing Alluminium window frame with 15.00 Nos 875.67
glass of all size shutter/frame, replacing all old Mosquite Net fixtures with
new locks, screws etc. including repairing the shutter/frame with Rates
includes all labour charges for removing, repairing & refixing the window,
all materials, transport cost, taxes etc.and as directed by engineer in
charge etc complete.
14 Removing, Repairing and Refixing existing Alluminium fix ventilation 18.00 Nos 348.45
frame with glass of all size shutter/frame, replacing all old fixtures with
new locks, screws etc. including repairing the shutter/frame with Rates
includes all labour charges for removing, repairing & refixing the
Ventilation, all materials, transport cost, taxes etc.and as directed by
engineer in charge etc complete.
15 Provoding and fixing flush door shutters, solid core construction with 31.00 Sqm 1797.77
frame of first class hardwood with cross board and face veneer or
plywood face panels, including anodised alluminium butt hinges with
necessary screws. (B) Non-decorative type and block board core anodised
alluminium butt hinges in flush door shutters (2) 35 mm thick.
16 20mm thick sand faced cement plaster on walls upto height 10 metres 165 Nos 300.66
above ground level consisting of 12mm thick backing coat of C.M. 1:3 (1-
cement : 3-sand) and 8mm thick finishing coat of C.M. 1:1 (1-cement : 1-
sand) etc. complete.
Rupees Sixteen Lakh Twenty One Thousand Thirty Only.
I/We am /are willing to carry out the work at…………% above/below percent (should be written in figures and words) at the estimated
rates mentioned above amount of my/your tender works out as under.
*Estimated Amount *Estimated Amount
put to Tender Rs. 1621030.00 put to Tender Rs.
Deduction …………….. % below………………… Add ………… % above Rs. …………….
1 The Contractor shall be exhibit board as per government circular No.BDG/3277/1657 N dated 26/01/1997 S (M.GUJ) with detailed
specification and details of work and amount Involved at site without any payment as directed by Engineer-In-Charge.
2 All work shall be carried out as per public work department hand book and other specifications of Division or as directed.
3 All columns in the Schedule should be filled in ink & the total of the entries in the last column should be struck by Contractor under
4 Rates quoted include clearance of site (Prior commencement of work and its close) in all respects and hold good for work under all
condition, site, moisture/ weather etc.
5 The Boards stating the detailed specification & detailes of Work shal be provided by the contractor as per Government Resolution
T.No.1890-240- Dtd.18/11/1990 and directed by contractor at his own cost immediately on recommanding the work order.
6 Testing of Material Shall be done as per the statement attached with specification,The material IS Tested in GERI by Executive
Engineer Surat and Bill for the testing charges shall be paid by Executive Engineer,1% of the Amount put to Tender.
7 1% of the Construction Cost Shall be deducted from the bill Amount of the contract as per the Buildig and other Construction works
walfare cess at 1996(Labour and Employment Department Letter No CWA-2004-1831-M(3)Dated 9/12/2005 notification Of Labour
& Employment department dt.03/01/2005 & Labou & Employment Department Letter no GWA/2004-841M(B) Dt 14/12/2005 &
8 In Case of RCC items Where there is a change in Grade of Mix or Change as per Actual Mix design the cost of difference of Cement
Difference shall be deducted from the rate of original item at the rate of star rate mentioned in the tender.
9 Contractor are advised to visit site before loading tender rate.
10 Necessary wiring point and drainage point are installed at Site however any modification in electrical installation and drainage &
water supply connection and minor correction to perform experienced in Lab shall be done by contractor at his risk and cost.
11 The Rates are inclusive of all the taxes (Excluding GST),Transport Charges,Octroi duty and storage Charges up to date.
12 The materials Covered for wiring should be got approved from the Engineer Incharge of the work.
13 GST and Income tax TDS will be deducted at a source while making payments of bills.
14 GST will be paid extra as per Govt. amendment.
15 The Materials on the work shall have to be used and carried out as specified in technical note.
I/We hereby Declare that I/we have Visited the site and fully Exquisite myself/ourselves with the local situation regarding
materials,Labour and other factors pertaininfg to work before submitting tender.
I/We hereby Declare that I/we have carefully Studied the condition of Contracts,Detailed Specification and other tender Document
of this work and agree to execute the same accordingly.
Deputy Executive Engineer
Valsad (R&B) Sub-Division
Signature of Bidder
Executive Engineer
Valsad (R&B) Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
8 Building Booklet civil.pdf
BOQ.pdf
GR LIST.pdf
GR.pdf
NIIT.pdf
SBD.pdf
SPECIFICATIONS.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .