Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.4 LAdmitted-Fee/PreQual/Technical/Finance | -35.10% | ₹4.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹4.8 L+₹41,262.88 (9.41%)Admitted-Fee/PreQual/Technical/Finance | -28.99% | ₹4.8 L+₹41,262.88 (9.41%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹5.7 L+₹1.4 L (31.0%)Admitted-Fee/PreQual/Technical/Finance | -14.99% | ₹5.7 L+₹1.4 L (31.0%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹6.8 L
EMD Value
₹6,800
Closing Date
19 Sept 2026, 5:30 pmClosed
SE Mechanical Division, Rourkela
SE Mechanical Division, Rourkela - 769004
Supply, Fabrication, erection, testing and commissioning of 04 Nos. Scouring Sluice gate of size (1200mmx1500mm) of Talbahali Check Dam of Lahunipara block under Minor Irrigation Division, Sundargarh for the year 2025-26.
2026_CEMWR_140473_1
SE/RMD/04/2026-27
Open Tender
Mechanical Works
Percentage
30 days
Budhabhuin
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,000
₹6,800
Yes
21 Sept 2026
10 Sept 2026
21 Sept 2026
10 Sept 2026
19 Sept 2026
10 Sept 2026
10 Sept 2026 - 18 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Embedded Parts:
Supply and fabrication of embedded parts consisting of wall liners- 3000x150x8 mm 2 Nos, wall liners-3000x100x8 mm 4 nos sill beam- Half cut ISMB200 of 1300 mm - 1no, Side seal SS seat - 3000 x 60 x 6 - 2 nos, Sill beam SS seat- 1200x60 x 6 - 1 no, 1st stage embedmnents, dia 16 studs,nuts,bolts, washer- 10kgs with all accessories including machinery, fixtures, labour, cutting, alligning, welding, cleaning, finishing, including consumables, all complete as per direction of Engineer- in-charge.The cost is inclusive of contractor profit @7.5% and labour cess @1%. | 4 | Set | 29,375.66 | ₹1,17,502.64 |
| 2 | Gate leaf:
Supply and Fabrication of vertical lift sliding Gate leaf consisting of skin plate- 1200x1500x8mm 1no, End vertical girders-1500x65x10mm- 2 nos, Horizontal girders- ISA 65x65x6 1160mm 3 nos, Diaphrgm-1450x50x8 -3nos, side seal mounting- MS flat 1500x40x8 mm 2 nos, Side seal clamp plate- MS flat 1500x35x8 mm 2 nos, Pad base - plate 80x30x25mm- 4 nos, Bronze pad-80x30x12mm- 4 nos, Btm seal-10mm thick-1200 mm long- 1 no, Btm. seal clamp plate- MS flat 1200x50x8 mm- 1 no, Side seal 25mm dia- 1500mm long-2 nos,lifting bracket 600x115x12 -2nos, lifting pin -130 Dia 30 -1no, C/s Screw, bolt/nut etc-10 kg with all accessories including machinery, fixtures, consumables, labour, cutting, drilling & boring, alligning, welding, cleaning, finishing all complete as per direction of Engineer-in- charge.The cost is inclusive of contractor profit @7.5% and labour cess @1%. | 4 | Set | 30,029.88 | ₹1,20,119.52 |
| 3 | Hoist details:
Supply and Fabrication of Steel hoist bridge for single stem Nut type screw gear box hoist consisting of base plate- 400x200x8mm- 4nos, CI gear box base plate- 400x300x16mm -1no, supporting beams- ISMB 150- 1800 mm long- 2 nos, anchor bar- Dia 20mm -350mm long- 16 nos,chequered plate- 1500x400x6mm - 1 no, with all accessories including machinery, fixtures, consumables, labour, cutting, alligning, welding, cleaning, finishing all complete as per direction of Engineer-in- charge.The cost is inclusive of contractor profit @7.5% and labour cess @1%. | - | Set | 13,253.35 | - |
| 4 | Erection, positioning, alligning, fixing, trial and commissioning:
Erection, positioning, alligning, fixing, trial and commissioning including unloading and shifting upto location of all components of 1st stage and 2nd stage Embedded parts (consisting of sill beam, wall liners, track plates etc), Vertical Gate leaf (complete assembly with fixing of bronze pad, rubber seals), Steel hoist bridge assembly (consisting of hoist platform, Screw rod, lifting gear box, supporting beams, base plates, anchor bolts etc) with all accessories including machinery, fixtures, labour, cutting, alligning, welding, cleaning, finishing total 2109.60 kg gate including consumables all complete as per direction of Engineer in charge. The cost is inclusive of contractor profit @7.5% and labour cess @1%. | - | kg | 52.07 | - |
| 5 | Boughtout Items:
Supply of following bought out materials per gate
LTB-1 Bronze pad of size 80 x 30 x 12mm - 4 nos., Bottom Seal ( plate-75x10mm ) - 1200 mm - 1 no, Side Seal ( dia 25-70x10mm )- 1500 mm-2 nos, 1st stage embedments, Dia 16 Studs, bolts, nuts, washers etc. 20Kg, Nut type screw Gear box assembly suitably square threaded for 63 mm Dia screw rod - 1 no, anchor bars 16 nos, liting pin - 1no, Screw rod 63mm Dia suitable square threaded to M62x9 including cost of material, straightening and machining. -2 Meter Long - 1 No, 63mm Dia Round-1.7 Meter long - 1no, Lubricant like grease & mobil - 2 kg,Gate Lifting Handle 1 no. as per direction of Engineer in charge. The cost is inclusive of contractor profit @7.5% and labour cess @1%. | 4 | Set | 46,103.01 | ₹1,84,412.04 |
| 6 | Painting :
Painting of 2nd stage embeded parts(exposed portion), all steel surface of gate including cleaning, degreasing, handling, cost of paint, applying of one coat primer of 40 micron thick & three coats of final paint of 100 micron each, all inclusive of labour, materials & consumables as per direction of Engineer-in- charge. Painting cost of Embeded part (With one coat Zinc primer & 3 coats of Coal tar epoxy paint), Gate Leaf (With one coat Zinc primer & 3 coats of Coal tar epoxy paint), Hoisting Platform (With one coat Zinc primer & 3 coats of Aluminium paint) as per direction of Engineer in charge.The cost is inclusive of contractor profit @7.5% and labour cess @1%. | - | set | 4,005.24 | - |
| 7 | Extra Items:
Labour charges for vent cleaning-Helper 2 Nos for one day, Construction of coffer dam by sand bag 50nos. @ Rs30/- and dismantling after completion of work including cost of labour and sand bag , pump with 10HP Diesel engine for dewatering of entrapped water- 8 Hrs, Watch and Ward, watchman-2nos for 3days 2nd stage Concreting Cutting-0.89cum, 2nd stage Concrete - 0.62cum as per direction of Engineer- in-charge..The cost is inclusive of contractor profit @7.5% and labour cess @1%. | 4 | set | 17,343.23 | ₹69,372.92 |
| 8 | Transportation:
Transportation charges (Truck & Tractor) Steel material from SAIL stockyard to workshop and finished gate from workshop to work site(75km) with all bought out and erection material including cost of loading & unloading 1 trip as per direction of Engineer in charge. The cost is inclusive of contractor profit @7.5% and labour cess @1%. | 1 | set | 5,045.25 | ₹5,045.25 |
stage.html
html • 0.02 MB
finance_608615.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.00 MB
BidDocumentTALBAHALI.pdf
Tender Documents • 1.55 MB
BOQ_608615.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .