| Sl No | Description | Qty | Unit | VIKRAMAN NAIR S L3 | Abdul Rasheed K K L1 | Sivadasan K L2 |
|---|---|---|---|---|---|---|
| 1.00Replacement of Agitators and Rakers in PA/PC Plants, FACT-CD. | ||||||
| 1.01 | Maintenance and Replacement of Attack Tank Agitators:
Make necessary site arrangements for the work. After getting the process clearance decouple and dismantle the motor and gearbox from the base. Decouple the agitator. Gearbox and motor shall be safely positioned. Motor and gearbox if required shall be transported to respective workshops and the repaired gearbox / motor shall be transported back to position. Lift the agitator and its detached section from the attack tank and transport it to the earmarked area for repair. Transport spare agitator from repair bay, lift and position it on attack tank compartment. Erect the gearbox on the foundation and couple it with the agitator. Erect back the motor, align the pulleys and couple back the motor and gearbox. All foundation and coupling bolts shall be properly tightened. After trials, any scrap/damaged components shall be transported to the earmarked area as per site instructions. Any minor repairs on the foundation/base and agitator blades shall be in this scope of work. | 15 | NO | 2,77,500 ₹2,77,500 | 2,22,000 ₹2,22,000 Lowest | 2,32,500 ₹2,32,500 |
| 1.02 | Maintenance and Replacement of Digestion Vessel Agitators:
Make necessary site arrangements for the work. After getting the process clearance decouple and dismantle the motor and gearbox from the base. Decouple the agitator. The gearbox and motor shall be safely positioned. The motor and gearbox if required shall be transported to respective workshops and the repaired gearbox/motor shall be transported back to position. Dismantle the blades of the agitator from the digestion vessel. Lift the agitator and its detached sections/blades from digestion and transport them to the earmarked area for repair. Transport spare agitator from repair bay, lift and position it on digestion vessel. Transport the agitator blades to the inside of the digestion vessel and fix them on the newly erected agitator shaft. Erect the gearbox on the foundation and couple it with the agitator. Erect back the motor, align the pulleys and couple back the motor and gearbox. All foundation and coupling bolts shall be properly tightened (Tach welding of coupling bolts and nuts of the blades comes under the scope of the contractor). After trials, any scrap/damaged components shall be transported to the earmarked area as per site instructions. Any minor repairs on the foundation/base shall be in this scope of work. | 5 | NO | 60,000 ₹60,000 Lowest | 60,000 ₹60,000 Lowest | 1,00,000 ₹1,00,000 |
| 1.03 | Maintenance and Replacement of Strong/Weak Settler Raker Assemblies in PA Plant and Clariflocculators in PC Plants.
Make necessary arrangements for the work. After getting process clearance, inspect the rakers for repair/replacement. The raker shall be decoupled as per site instructions. The Raker assembly with blades shall be repaired/replaced using suitable materials/spares. The repaired/replaced raker assembly shall be realigned with the settler system and coupled back. The raker blade components shall be modified if required to ensure proper alignment. Take trails. Any scrap material shall be transported to the earmarked area as per site instructions. | 3 | NO | 36,000 ₹36,000 | 15,000 ₹15,000 Lowest | 25,500 ₹25,500 |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
7 May 2026, 3:00 pmClosed
NITHIN C S
SM (P and P)-CD
Replacement of Agitators and Rakers in PA/PC Plants
2026_FACT_906125_1
4098/2026-2027/E33398
Limited
Miscellaneous Works
Item Rate
365 days
AMBALAMEDU
This tender is issued on limited tender basis from the registered bidders of FACT (CD)
4 documents required · 4 mandatory
₹0
₹5,000
Yes
11 May 2026
22 Apr 2026
8 May 2026
22 Apr 2026
7 May 2026
22 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Replacement of Agitators and Rakers in PA/PC Plants, FACT-CD. | - | - | - | - |
| - | Maintenance and Replacement of Attack Tank Agitators:
Make necessary site arrangements for the work. After getting the process clearance decouple and dismantle the motor and gearbox from the base. Decouple the agitator. Gearbox and motor shall be safely positioned. Motor and gearbox if required shall be transported to respective workshops and the repaired gearbox / motor shall be transported back to position. Lift the agitator and its detached section from the attack tank and transport it to the earmarked area for repair. Transport spare agitator from repair bay, lift and position it on attack tank compartment. Erect the gearbox on the foundation and couple it with the agitator. Erect back the motor, align the pulleys and couple back the motor and gearbox. All foundation and coupling bolts shall be properly tightened. After trials, any scrap/damaged components shall be transported to the earmarked area as per site instructions. Any minor repairs on the foundation/base and agitator blades shall be in this scope of work. | - | NO | - | - |
| - | Maintenance and Replacement of Digestion Vessel Agitators:
Make necessary site arrangements for the work. After getting the process clearance decouple and dismantle the motor and gearbox from the base. Decouple the agitator. The gearbox and motor shall be safely positioned. The motor and gearbox if required shall be transported to respective workshops and the repaired gearbox/motor shall be transported back to position. Dismantle the blades of the agitator from the digestion vessel. Lift the agitator and its detached sections/blades from digestion and transport them to the earmarked area for repair. Transport spare agitator from repair bay, lift and position it on digestion vessel. Transport the agitator blades to the inside of the digestion vessel and fix them on the newly erected agitator shaft. Erect the gearbox on the foundation and couple it with the agitator. Erect back the motor, align the pulleys and couple back the motor and gearbox. All foundation and coupling bolts shall be properly tightened (Tach welding of coupling bolts and nuts of the blades comes under the scope of the contractor). After trials, any scrap/damaged components shall be transported to the earmarked area as per site instructions. Any minor repairs on the foundation/base shall be in this scope of work. | - | NO | - | - |
| - | Maintenance and Replacement of Strong/Weak Settler Raker Assemblies in PA Plant and Clariflocculators in PC Plants.
Make necessary arrangements for the work. After getting process clearance, inspect the rakers for repair/replacement. The raker shall be decoupled as per site instructions. The Raker assembly with blades shall be repaired/replaced using suitable materials/spares. The repaired/replaced raker assembly shall be realigned with the settler system and coupled back. The raker blade components shall be modified if required to ensure proper alignment. Take trails. Any scrap material shall be transported to the earmarked area as per site instructions. | - | NO | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
BOQ_952436.xls
BOQ • 0.23 MB
Compliance.pdf
Tender Documents • 0.09 MB
Tenderdocuments.pdf
Tender Documents • 1.29 MB
SpecialConditions.pdf
Tender Documents • 0.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].