Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance NULL | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance CHERKALA CHENGALA KASARGOD KERALA 671541 | KASARAGOD | KERALA | 671541 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance KASARAGOD | KASARAGOD | KASARAGOD | KERALA | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹5.1 L
EMD Value
₹12,706
Closing Date
8 Oct 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
MANJULA NK
Office of the Assistant Engineer, LID and EW Section, Kumbla Grama Panchayat
ANNUAL PLAN KUMBALA GP 2025-26 PR NO 80/26 INDUGIRI KELAGINA UJAR ROAD CONCRETE-IN WARD 5-General Civil Work
2025_LSGD_802687_6
05/2025-26/TN/AE/LIDEW/KMBL
Open Tender
Civil Works - Roads
Item Rate
180 days
Kumbla Grama Panchayat
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,125
Yes
₹12,706
Yes
10 Oct 2025
26 Sept 2025
10 Oct 2025
26 Sept 2025
8 Oct 2025
26 Sept 2025
Amount
CONCRETE ROAD
3.15.2:Compacting Original Ground<br> (ii) Compacting original ground supporting subgrade<br> Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2.
4.11.2:Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal. Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. <br>(ii) Using Gravel mix soil.
75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)
3.3:Construction of Embankment with Material Obtained from Roadway Cutting <br> Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5
OD200183/2025-2026:Providing and fixing 18 mm thick gang saw cut, mirror, polished, premoulded and prepolished granite less than 0.5 sqm area, at road sides, walls etc. locations of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 ( 1cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch tips, including rubbing, moulding and polishing to edge to give high gloss finish etc. complete at all levels
OD190906/2025-2026:Engraving letters in hard stone.
ABDULLA B (BID ID -2378802)
BM ABDHULLA (BID ID -2379682)
ahammed C H B (BID ID -2379698)
Bidder Name
BM ABDHULLA
ahammed C H B
ABDULLA B
HRM Enterprises
stage.html
html • 0.02 MB
finance_1334251.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .