Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹28.5 L
EMD Value
₹24,143
Closing Date
27 Nov 2026, 6:00 pm4d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Gujarat Ecological Education and Research (GEER) Foundation
CONSTRUCTION OF ENTRANCE GATE AT GEER FOUNDATION, DIST. GANDHINAGAR
362684
2026-27
Open
Miscellaneous Works
Works
Gandhinagar
4 documents required · 4 mandatory
₹900
Director, GEER Foundation, payable at Gandhinagar
₹24,143
27 Nov 2026
4 Nov 2026
30 Nov 2026
4 Nov 2026
17 Nov 2026
4 Nov 2026
120 days
Item no. QUANTITY but may UNIT Amount
be more or less
In figures In words
Rupees One Hundred Twenty
Excavation for foundation upto 1.5 m depth including sorting out and stacking of useful materials and Three and One Thousand Two
disposing off the excavated stuff upto 50 Meter lead.(A) Loose or soft soil Hundred Ninety One Paise
Rupees One Hundred Thirty Six
Excavation for foundation for depth from 1.5 m to 3.0 m including sorting out and stacking of useful
and Two Thousand Nine
2 61.00 materials and disposing off the excavated stuff upto 50 Meter lead.(A) 136.30 Cmt
Hundred Ninety Five Paise
Loose or soft soil
Providing and laying cement concrete 1:4:8 (1- Cement : 4- coarse sand : 8- hand broken stone Rupees Two Thousand Seven
3 11.00 aggregates 40 mmnominal size) and curing complete excluding cost of formwork in (A) Foundation and 2759.34 Hundred Fifty Nine and Thirty Cmt
Plinth Four Paise Only
Providing formwork with sheathing steel sheets so including centering shuttering strutting and
propping etc. Height of propping and centering below supporting floor to ceiling not exceeding 4 M. and
Rupees Two Hundred Eighty
4 74.00 removal 280.90 Smt
and Ninety Paise Only
of the same for in situ reinforced concrete and plain concrete work in. (A) Foundations Footings Bases
of Columns etc. and Mass concrete.
Providing formwork with sheathing steel sheets so as to give a fair finish including centering shuttering
strutting and propping etc. height of propping and centering below supporting floor to ceiling not Rupees Five Hundred Forty Six
exceeding 9 M. and removal of the same for in situ reinforced concrete and plain and Forty Eight Paise Only
concrete work in. (G) Columns PillarsPosts and struts. (2)Circular or curved in Plan
Providing formwork with sheathing steel sheets so as to give a fair finish including centering shuttering
Rupees One Thousand Two
strutting and propping etc. height of propping and centering below supporting floor to ceiling not
6 37.00 1261.33 Hundred Sixty One and Thirty smt
exceeding 4 M. and removal of the same for in situ reinforced concrete and plain
Three Paise Only
concrete work in. (G) Columns PillarsPosts and struts. (2)Circular or curved in Plan
Rupees Two Thousand Six
Uncoursed Rubble Masonry with hard stone of approved quality in foundations and plinth in Cement Hundred Twenty Nine and
Mortar 1:5 (1-cement : 5-coarse sand including levelling up etc. complete Thousand One Hundred Ninety
Nine Paise Only
Rupees One Hundred Thirty Six
Filling available excavated earth (excluding rock) in trenches. plinth, ides of foundations etc. in layers
8 100.00 136.92 and Nine Thousand One Cmt
not exceeding 20 cm. in depth consolidating ach disposited layer by ramming and watering.
Hundred Fifty Six Paise Only
Rupees Eight Thousand One
Dhangadhra stone mesonry block in course in superstructure with stone of approved quality in Cement
9 25.00 8130.50 Hundred Thirty and Fifty Paise Cmt
Mortar 1:5 (1-Cement :5- course sand) including packing the joints etc. complete.
Rupees Two Hundred Seventy
10 26.00 277.14 Seven and One Hundred Forty Cmt
watering, ramming and consolidating etc. complete.
Four Paise Only
Providing and laying in position Ready Mixed M- 250 grade concrete for reinforced cement conctere
work , using cement content as per approved Design Mix manufactured in fully automatic batching
plant and transported to site of work in transit mixer for a lead up to 10 kms having continuous agitated
mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including Rupees Five Thousand
pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering shuttering Hundred Thirty Five and Nine
finishing and reinforcement including cost of admixtures in recommended proportions as per IS: 9103 Thousand Seven Hundred
to accelerate/ retard setting of concrete, improve workability without impairing strength and durability Eleven Paise Only
as per direction of the Engineer - in - charge. Without Fly Ash (Min cement level as per latest IS 456 shall
be maintained) (Cement level 450 kg )
(A) Footing ,tie beam,column,slab etc
Rupees Ninety Four and Nine
Providing TMT Bar FE 550D reinforcement for R.C.C. work including bending, binding and placing in
12 9896.00 94.99 Thousand Nine Hundred Five KG
position complete (a) up to Ground Floor
Paise Only
Providing & fixing Steel work welded in built up sections, hollow section framed work including cutting
Rupees Eight Thousand Eight
hoisting fixing in position and with one coat primer & two coat oil paint as per detail drawings etc.
13 30.70 8837.50 Hundred Thirty Seven and Fifty QTL
complete. in columns beams and joists channels M.S. flat Angles Pipes tees flats with connecting plates
Paise Only
or angle cleatsetc.,etc complete all as directed by Engineer-in-Charge.
Providing, supplying and installing
The outer visible surface shall be clad with 1.0–1.5 mm thick Bronze Finish PVD coated Stainless Steel
sheets, fixed with concealed stainless steel fasteners and/or approved adhesive, including necessary
folding, edge finishing and providing matching bronze finish SS trims at joints and edges. Rupees Four Thousand Seven
14 36.00 The work shall include providing and fixing necessary joints, connections, brackets, anchor fasteners, 4704.58 Hundred Four and Fifty Eight smt
base plates and all required fixing hardware. The structure shall be properly aligned and securely fixed Paise Only
to MS/RC columns or structural supports ensuring stability and proper installation as per drawings.
The rate shall include all materials, cladding, hardware, transportation, labour, scaffolding, lifting,
installation and finishing complete as per approved design and direction of the Engineer-in-Charge.
SCHEDULE-B
Estimated Estimated Rate with 1% Labour cess in Rs.
Description of Item (Excluding GST)
Item no. QUANTITY but may UNIT Amount
be more or less
Perforated Metal Sheet Fabrication:
Providing, fabricating, supplying and installing perforated metal sheet panels made from
MS/GI/Aluminium sheets of required thickness (1.2–2 mm) with perforation pattern as per approved
design and drawings. The sheets shall be properly cut, bent, fabricated and fixed over MS framework
made of square/rectangular hollow sections including necessary stiffeners, brackets and supports. All Rupees Two Thousand Five
15 5.00 MS members shall be treated with anti-rust zinc primer and two coats of enamel/PU paint of approved 2555.30 Hundred Fifty Five and Thirty smt
shade. The perforated sheets shall be fixed using SS screws, rivets or concealed fasteners with proper Paise Only
alignment and finishing. The rate shall include all materials, fabrication, cutting, perforation, welding,
framing, hardware, transportation, labour, scaffolding, installation and finishing complete as per
approved drawings and instructions of the Architect/Engineer-in-Charge. Measurement shall be made in
Square Meter (Sq.m) of finished panel area.
Providing 20 mm thick double coat mala cement plaster on concrete work for plastering comprising of Rupees Two Hundred Eighty
base coat of 12 mm thick cement plaster in cement mortar (1 Cement : 4 coarse sand) in rough finishing Six and One Thousand
and 8 mm thick top coat of cement mortar 1:2 (1 Cement : 2 Coarse sand) finished with trovel including Hundred Twenty Seven Paise
scaffolding curing etc. complete. Only
Exterior Travertino Texture Finish (1.5 mm Thick) : Providing and applying 1.5 mm thick Travertino
texture finish (matt/glossy) on exterior plastered surfaces using approved make and shade as per
Architect’s approved sample and specification. The work shall include surface preparation, cleaning the
surface free from dust, chalk, loose particles and debris, followed by application of exterior grade primer
(50–60 microns DFT) of approved colour using brush or roller. After proper drying of primer, Travertino
texture material shall be applied using HVLP spray gun to achieve the required pattern and finish as
approved by the Architect. Water may be added as recommended by the manufacturer for proper spray
application. The texture layer thickness shall be approximately 1.5 mm. After complete drying of the
texture layer, a clear protective top coat (Matt or Gloss finish) of 30–40 microns DFT shall be applied
using brush or roller as per manufacturer’s recommendation. The drying time between coats shall be Rupees Eight Hundred Seventy
8–24 hours depending on weather conditions or as per manufacturer’s specification. The rate shall One and Sixty Three Paise Only
include surface preparation, mock-up sample panel for approval, all materials, labour, tools,
loading/unloading, transportation, application at all heights, scaffolding, protection and finishing
complete as per approved drawings, specifications and instructions of the Architect/Engineer-in-Charge.
Approved Makes: Texture & Primer: Asian Paints Royale Play Travertino Berger WeatherCoat
Stoneshield Dulux Weathershield Texture Nerolac Impressions Clear Topcoat: Asian Paints Apex Clear
Dulux PU Clear Measurement: Measured in Square Meter (Sq.m) of finished surface area.
Signage: Providing, fabricating, supplying and installing signage boards of approved design, size and
location as per drawings and instructions of the Architect/Engineer-in-Charge. The signage shall be
made using MS/Aluminium/ACP base panel with vinyl graphics, UV printed film, or laser-cut
acrylic/stainless steel raised letters as per approved design and sample. The work shall include
Rupees Six Thousand Hundred
necessary cutting, fabrication, finishing, printing/lettering, spacers, mounting brackets, anchor fasteners
18 6.00 6098.38 Ninety Eight and Thirty Eight smt
and all required hardware for proper fixing. The signage shall be properly aligned and securely fixed to
Paise Only
walls, ceilings or structural members as directed. The rate shall include mock-up sample for approval, all
materials, fabrication, printing, transportation, labour, scaffolding, installation and finishing complete as
per approved drawings and instructions of the Architect/Engineer-in-Charge. Measurement shall be
made in Square Meters (Sq.m) of completed signage.
TOTAL AMOUNT
TOTAL AMOUNT
I/We/am/are willing to carry out the work at….................................................% above/ below
percent (shouid be written in figure and words )of the estimated rates mentioned above. Amount of my/our tender Works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Deduct………% Above
Net Rs…...................... Net Rs…......................
In words….............................. In words..............................
The Contractor shall exhibit a board with detailed specification and details of work as directed by the
Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt. G.R.: PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in
R.C.C. items where there is a change as per actual mix design the cost of difference of cement
consumption have been deducted from the rate of original item at the rate of input rate mentioned in
all the tender. Page
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
03_2009-12-31_10 Testing in GERI.pdf
05_2013-05-10_Bid Validity Period.pdf
06_2013-11-20_Regarding Acceptance of SD.pdf
07_2014-08-08_Royalty Payment.pdf
10_2017-02-15_TMT Lap Length Mesurement GR.pdf
12_2017-02-18_Single Tender to be Reinvited GR.pdf
13_2017-05-11_Cement Consumption.pdf
14_2017-07-11_Excess Quantity GR 10.pdf
15_2017-08-29_Tax according to GST Bill GR.pdf
16_2017-09-11_GST instead of VAT GR.pdf
18_Contractor Registration Paripatra.pdf
01_GATE SBD Book_2026_Final 7.09.2026 R-01.pdf
02_PRE QUALIFICATION - Entrance Gate 7.09.2026 R-01.pdf
04_JB_Civil _General Specifications_2.pdf
05_GATE_Addictional civil specification.pdf
06_Schedule for testing of material.pdf
07_Test for Teakwood and plywood.pdf
08_ENTRANCE GATE_Make List.pdf
09-geer-NOTIFICATION - Standards for cement consumption.pdf
10-HSE-Safety Aggrement.pdf
11_ARC GATE ELEVATION_DETAILS(Autosaved).pdf
11_ARC GATE ELEVATION_DETAILS.pdf
12_STR S01_R0_GATE FOUNDATION DETAILS_020426.pdf
ENTRANCE GATE BOQ 03.09.2026 01.pdf
12_STR S01_R0_GATE FOUNDATION DETAILS_020426.pdf
CORRIGENDUM
ENTRANCE GATE BOQ 03.09.2026 01.pdf
CORRIGENDUM
11_ARC GATE ELEVATION_DETAILS(Autosaved).pdf
CORRIGENDUM
11_ARC GATE ELEVATION_DETAILS.pdf
CORRIGENDUM
05_GATE_Addictional civil specification.pdf
CORRIGENDUM
06_Schedule for testing of material.pdf
CORRIGENDUM
02_PRE QUALIFICATION - Entrance Gate 7.09.2026 R-01.pdf
CORRIGENDUM
04_JB_Civil _General Specifications_2.pdf
CORRIGENDUM
09-geer-NOTIFICATION - Standards for cement consumption.pdf
CORRIGENDUM
10-HSE-Safety Aggrement.pdf
CORRIGENDUM
07_Test for Teakwood and plywood.pdf
CORRIGENDUM
08_ENTRANCE GATE_Make List.pdf
CORRIGENDUM
14_2017-07-11_Excess Quantity GR 10.pdf
CORRIGENDUM
15_2017-08-29_Tax according to GST Bill GR.pdf
CORRIGENDUM
12_2017-02-18_Single Tender to be Reinvited GR.pdf
CORRIGENDUM
13_2017-05-11_Cement Consumption.pdf
CORRIGENDUM
01_GATE SBD Book_2026_Final 7.09.2026 R-01.pdf
CORRIGENDUM
16_2017-09-11_GST instead of VAT GR.pdf
CORRIGENDUM
18_Contractor Registration Paripatra.pdf
CORRIGENDUM
03_2009-12-31_10 Testing in GERI.pdf
CORRIGENDUM
07_2014-08-08_Royalty Payment.pdf
CORRIGENDUM
10_2017-02-15_TMT Lap Length Mesurement GR.pdf
CORRIGENDUM
05_2013-05-10_Bid Validity Period.pdf
CORRIGENDUM
06_2013-11-20_Regarding Acceptance of SD.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .