| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹27,300Accepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹30,300+₹3,000 (11.0%)Rejected-AOC | 2 | Rejected-AOC L2 | |
| 3 | 3₹34,400+₹7,100 (26.0%)Rejected-AOC | 3 | Rejected-AOC L3 | |
| 4 | 4₹39,000+₹11,700 (42.9%)Rejected-AOC | 4 | Rejected-AOC L4 |
Tender Value
₹31,500
Closing Date
16 Aug 2021, 6:55 pmClosed
The Executive Engineer, Mechanical Division (MED),
The Executive Engineer, Mechanical Division Deewanbagh(MED), Baramulla
Rewinding / Repairs to 03 phase induction motor of capacity 7.5HP of fryer blower motor of dryer mixer unit, 2HP motor pump assembly of pollution control unit and 2 HP motor of bin feeder No. 03 of Hot Mix plant at Veerwan Baramulla.
2021_PWDJK_133099_1
MDB/TS/e-tender/2021-22/72
Open Tender
Repair and Maintenance Works
Item Rate
7 days
BARAMULLA
Please refer Tender documents.
6 documents required · 6 mandatory
₹200
The Executive Engineer, Mechanical Division (MED),
Exempted
25 Nov 2021
4 Aug 2021
17 Aug 2021
4 Aug 2021
16 Aug 2021
4 Aug 2021
Amount
Repairs to 3 phase motor of capacity 7.5h.p 36 slot by way of removal of motor from foundation base and shifting of motor to private workshop including carriage to and fro to the plant. The job further includes disassembling of 7.5h.p motor by way of isolating the stator and rotor assembly along with end bearings and seal and then extracting the burnt copper windings from stator assembly and also removal of PVC insulation paper and cotton sleeves. The job also includes Providing and fitting of copper windings of suitable size and gauge as per requirement and also providing and fitting of PVC insulation paper and other allied items and then varnishing of rewound stator windings and then drying up by using conventional heating method and then reassembling of stator and rotor and other allied items and testing on full load for satisfactory performance. The cost on account of old material is deducted @80 of total item
Repairs to 2h.p Pump motor assembly by way of disconnecting the same at site veerwan carriage to and fro and then replacing the damaged impeller along with bearing on the pump side and refitting the pump motor assembly after necessary repairs at veerwan and testing the equipment for satisfactory performance.
Repairs to 3 phase motor of capacity2h.p 24 slot by way of removal of motor from foundation base and shifting of motor to private workshop including carriage to and fro to the plant. The job further includes disassembling of 2h.p motor by way of isolating the stator and rotor assembly along with end bearings and seal and then extracting the burnt copper windings from stator assembly and also removal of PVC insulation paper and cotton sleeves. The job also includes Providing and fitting of copper windings of suitable size and gauge as per requirement and also providing and fitting of PVC insulation paper and other allied items and then varnishing of rewound stator windings and then drying up by using conventional heating method and then reassembling of stator and rotor and other allied items and testing on full load for satisfactory performance. The cost on account of old material is deducted @80 of total item
Asif Engineering Works
M/s SAJID ENGINEERING WORKS
M/S NEW BUHROO ELECTRICAL AND MECH ENGG WORKS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .