| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹65.9 LAccepted-AOC | ₹65.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹87.4 L+₹21.5 L (32.7%)Rejected-Finance 1192 A BLOCK 3RD CROSS 5TH MAIN SAHAKARNGAR BANGALORE JV WITH M S J ENGINEERS T S NO 32 APPLE RIDGE APARMENTS SRI RAM NAGAR ALGAPURAM SALEM 636016 | SALEM | TAMIL NADU | 636016 | ₹87.4 L+₹21.5 L (32.7%) | L2 | Rejected-Finance High Quoted |
| 3 | L3₹91.2 L+₹25.4 L (38.6%)Rejected-Finance | ₹91.2 L+₹25.4 L (38.6%) | L3 | Rejected-Finance High Quoted |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not Complied with Prequalification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Original tender cover not received with in the stipulated time.Hence, Not Admitted |
Tender Value
₹72 L
EMD Value
₹46,000
Closing Date
10 Oct 2022, 2:00 pmClosed
Superintending Engineer
office of the Superintending Engineer Highways C and M Tirunelveli AR Line Road
Detailed Project Report for the work of Providing connectivity between 47 coastal villages connecting Government Roads in Kanniyakumari District
2022_HWAY_235708_3
TN No 1 2022 23 HDO Dated 26 05 2022
Open Tender
Consultancy
Item Rate
180 days
Nagercoil
EMD Consultant relevant experience work program points qulification of experience
8 documents required · 8 mandatory
₹0
₹46,000
Tirunelveli
5 Feb 2023
24 Sept 2022
11 Oct 2022
24 Sept 2022
10 Oct 2022
26 Sept 2022
30 Sept 2022
Amount
Reconnaissance Survey & Inception report
Topographical Survey including fixing GPS pins
Conducting survey for L.S. & C.S
Fixing Horizontal Alignment and Vertical Alignment as per IRC standard
Conducting 7 days traffic volume study at 2 locations
Conducting Origin- Destination study at 4 locations
Clearing the light jungle to a width of 11m (Length 22 km x 11 x 0.60)
Soil sample collection and conducting Atterberg limits and CBR for Road work
Preparation of land plan schedule and its report, and CRZ proposal and its report
Preparation of Detailed Estimate and Abstract Estimate including Power Point presentation
Report on Environment & Social impacts Assessment, Report writing and submission of report like inspections report Traffic report etc., complete.
Calculation of SubTotal, GST and Total carried out by system automatically
Sub Total Amount for above all items
GST 18% for the above SubTotal Amount
TRANSHEIGHT CONSULTANTS PRIVATE LIMITED
LH CONSTRUCTIONS AND CONSULTANCY
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .