| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹50.7 LAdmitted-Finance H 10 KARNI NAGAR NEW NAGAUR ROAD NEAR MANDORE POLICE STATION 8TH MILL MANDORE JODHPUR 342304 | JODHPUR | JODHPUR | RAJASTHAN | 342304 | ₹50.7 L | L1 | Admitted-Finance |
| 2 | L2₹53.6 LAdmitted-Finance | ₹53.6 L | L2 | Admitted-Finance |
| 3 | L3₹55.3 LAdmitted-Finance | ₹55.3 L | L3 | Admitted-Finance |
| 4 | L4₹55.9 LAdmitted-Finance INDORA TEHSIL INDORA DISTT KANGRA HIMACHAL PRADESH | KANGRA | HIMACHAL PRADESH | 175013 | ₹55.9 L | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Shri Electrical Enterprises L1 | M/s R K Enterprises L3 | SN TECHNO CONSTRUCTIONS L2 | Chamunda construction company L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Material & Labour for seven stage and sterilization of inside the RCC overhead tank reservior of capacity 5,000 gallons upto height 25 mtr through bactriiological treatment by using suitable chemicals approved by Govt auth lab and ULTRA VIOLET RAY, through specialized agency. Seven stage are as under plants :- (a) First stage is to drain out the water by using exit valve or high capacity dewatering system (b) Second stage is cleaning all the algue formation inside the tank by using laboratory tested branded chemical of the company and scrubbing the walls of the tank (c) Third stage is fresh water cleaning by high speed jet pump (d) Fourth stage and first bacteria screening is disinfection by using branded halogen compound (e) Fifth stage is cleaning the floor of water tank by industrial vacuume cleaner (f) Sixth stage is the second bacteria screening and sterilizing method by using ultra violet ray within the tank and kill all suspended bacteria (g) Seven stage of cleaning and third bacteria screening us to sterilize the floor of the tank. Notes :- (i) Company will submit government laboratory test certificate of terbac-g5/inchor-5/nv-10, terbac-g65/inoxii-60/nb-69, before cleaning, fix the sticker mentioning the date of cleaning & name of site and also provide certificate confirming the completion of sterilization of water tanks mentioning the name of station and date of cleaning. All the cleaning & sterilization staffs should be under accidental insurance coverage. (ii) Outlet pipe of overhead tank should be plugged before cleaning the overhead tank to avoid entering scales and the quoted rate is deemed to include for the provision. (iii) Sterilization team will be comprised of at least 30% members who are minimum 03 months certificate holder in water tank sterilization. (iv) Contractor will be responsible for rectification of complaints occureed during cleaning the tank i.e. No water in tank/over flow due to broken of float valve/blockage to be included rate. (v) The above work will be either carried out in above seven stage or as directed and specified by Enge-in-charge. | 5 | Each job | 19,500 ₹97,500 | 35,000 ₹1.8 L | 15,000 ₹75,000 | 27,315 ₹1.4 L |
| 2.00 | Material & Labour for seven stage and sterilization of inside the RCC overhead tank reservior of capacity 50,000 Gallons at 15 to 20m staging through bactriiological treatment by using suitable chemicals approved by Govt auth lab and ULTRA VIOLET RAY, through specialized agency. Seven stage are as under plants :- (a) First stage is to drain out the water by using exit valve or high capacity dewatering system (b) Second stage is cleaning all the algue formation inside the tank by using laboratory tested branded chemical of the company and scrubbing the walls of the tank (c) Third stage is fresh water cleaning by high speed jet pump (d) Fourth stage and first bacteria screening is disinfection by using branded halogen compound (e) Fifth stage is cleaning the floor of water tank by industrial vacuume cleaner (f) Sixth stage is the second bacteria screening and sterilizing method by using ultra violet ray within the tank and kill all suspended bacteria (g) Seven stage of cleaning and third bacteria screening us to sterilize the floor of the tank. Notes :- (i) Company will submit government laboratory test certificate of terbac-g5/inchor-5/nv-10, terbac-g65/inoxii-60/nb-69, before cleaning, fix the sticker mentioning the date of cleaning & name of site and also provide certificate confirming the completion of sterilization of water tanks mentioning the name of station and date of cleaning. All the cleaning & sterilization staffs should be under accidental insurance coverage. (ii) Outlet pipe of overhead tank should be plugged before cleaning the overhead tank to avoid entering scales and the quoted rate is deemed to include for the provision. (iii) Sterilization team will be comprised of at least 30% members who are minimum 03 months certificate holder in water tank sterilization. (iv) Contractor will be responsible for rectification of complaints occureed during cleaning the tank i.e. No water in tank/over flow due to broken of float valve/blockage to be included rate. (v) The above work will be either carried out in above seven stage or as directed and specified by Enge-in-charge. | 6 | Each job | 67,500 ₹4.0 L | 75,000 ₹4.5 L | 70,000 ₹4.2 L | 61,300 ₹3.7 L |
| 3.00 | Material & Labour for seven stage and sterilization of inside the RCC overhead tank reservior of capacity1,00,000 Gallons at 15 to 20m staging through bactriiological treatment by using suitable chemicals approved by Govt auth lab and ULTRA VIOLET RAY, through specialized agency. Seven stage are as under plants :- (a) First stage is to drain out the water by using exit valve or high capacity dewatering system (b) Second stage is cleaning all the algue formation inside the tank by using laboratory tested branded chemical of the company and scrubbing the walls of the tank (c) Third stage is fresh water cleaning by high speed jet pump (d) Fourth stage and first bacteria screening is disinfection by using branded halogen compound (e) Fifth stage is cleaning the floor of water tank by industrial vacuume cleaner (f) Sixth stage is the second bacteria screening and sterilizing method by using ultra violet ray within the tank and kill all suspended bacteria (g) Seven stage of cleaning and third bacteria screening us to sterilize the floor of the tank. Notes :- (i) Company will submit government laboratory test certificate of terbac-g5/inchor-5/nv-10, terbac-g65/inoxii-60/nb-69, before cleaning, fix the sticker mentioning the date of cleaning & name of site and also provide certificate confirming the completion of sterilization of water tanks mentioning the name of station and date of cleaning. All the cleaning & sterilization staffs should be under accidental insurance coverage. (ii) Outlet pipe of overhead tank should be plugged before cleaning the overhead tank to avoid entering scales and the quoted rate is deemed to include for the provision. (iii) Sterilization team will be comprised of at least 30% members who are minimum 03 months certificate holder in water tank sterilization. (iv) Contractor will be responsible for rectification of complaints occureed during cleaning the tank i.e. No water in tank/over flow due to broken of float valve/blockage to be included rate. (v) The above work will be either carried out in above seven stage or as directed and specified by Enge-in-charge. | 10 | Each job | 71,000 ₹7.1 L | 83,000 ₹8.3 L | 75,000 ₹7.5 L | 87,000 ₹8.7 L |
| 4.00 | Material & Labour for seven stage and sterilization of inside the RCC/Steel underground/semi underground/over head/sedimentation/ckear water sumps UG sump reservior of capacity 1,50,000 Gallons at 15 to 20m staging through bactriiological treatment by using suitable chemicals approved by Govt auth lab and ULTRA VIOLET RAY, through specialized agency. Seven stage are as under plants :- (a) First stage is to drain out the water by using exit valve or high capacity dewatering system (b) Second stage is cleaning all the algue formation inside the tank by using laboratory tested branded chemical of the company and scrubbing the walls of the tank (c) Third stage is fresh water cleaning by high speed jet pump (d) Fourth stage and first bacteria screening is disinfection by using branded halogen compound (e) Fifth stage is cleaning the floor of water tank by industrial vacuume cleaner (f) Sixth stage is the second bacteria screening and sterilizing method by using ultra violet ray within the tank and kill all suspended bacteria (g) Seven stage of cleaning and third bacteria screening us to sterilize the floor of the tank. Notes :- (i) Company will submit government laboratory test certificate of terbac-g5/inchor-5/nv-10, terbac-g65/inoxii-60/nb-69, before cleaning, fix the sticker mentioning the date of cleaning & name of site and also provide certificate confirming the completion of sterilization of water tanks mentioning the name of station and date of cleaning. All the cleaning & sterilization staffs should be under accidental insurance coverage. (ii) Outlet pipe of overhead tank should be plugged before cleaning the overhead tank to avoid entering scales and the quoted rate is deemed to include for the provision. (iii) Sterilization team will be comprised of at least 30% members who are minimum 03 months certificate holder in water tank sterilization. (iv) Contractor will be responsible for rectification of complaints occureed during cleaning the tank i.e. No water in tank/over flow due to broken of float valve/blockage to be included rate. (v) The above work will be either carried out in above seven stage or as directed and specified by Enge-in-charge. | 3 | Each job | 90,000 ₹2.7 L | 75,000 ₹2.3 L | 87,000 ₹2.6 L | 89,000 ₹2.7 L |
| 5.00 | Material & Labour for seven stage and sterilization of inside the RCC overhead tank reservior of capacity 2,00,000 Gallons at 12m to 18m staging through bactriiological treatment by using suitable chemicals approved by Govt auth lab and ULTRA VIOLET RAY, through specialized agency. Seven stage are as under plants :- (a) First stage is to drain out the water by using exit valve or high capacity dewatering system (b) Second stage is cleaning all the algue formation inside the tank by using laboratory tested branded chemical of the company and scrubbing the walls of the tank (c) Third stage is fresh water cleaning by high speed jet pump (d) Fourth stage and first bacteria screening is disinfection by using branded halogen compound (e) Fifth stage is cleaning the floor of water tank by industrial vacuume cleaner (f) Sixth stage is the second bacteria screening and sterilizing method by using ultra violet ray within the tank and kill all suspended bacteria (g) Seven stage of cleaning and third bacteria screening us to sterilize the floor of the tank. Notes :- (i) Company will submit government laboratory test certificate of terbac-g5/inchor-5/nv-10, terbac-g65/inoxii-60/nb-69, before cleaning, fix the sticker mentioning the date of cleaning & name of site and also provide certificate confirming the completion of sterilization of water tanks mentioning the name of station and date of cleaning. All the cleaning & sterilization staffs should be under accidental insurance coverage. (ii) Outlet pipe of overhead tank should be plugged before cleaning the overhead tank to avoid entering scales and the quoted rate is deemed to include for the provision. (iii) Sterilization team will be comprised of at least 30% members who are minimum 03 months certificate holder in water tank sterilization. (iv) Contractor will be responsible for rectification of complaints occureed during cleaning the tank i.e. No water in tank/over flow due to broken of float valve/blockage to be included rate. (v) The above work will be either carried out in above seven stage or as directed and specified by Enge-in-charge. | 2 | Each job | 1,07,000 ₹2.1 L | 90,000 ₹1.8 L | 1,11,500 ₹2.2 L | 90,000 ₹1.8 L |
| 6.00 | Material & Labour for seven stage and sterilization of inside the RCC/Steel underground/semi underground/over head/sedimentation/ckear water sumps UG sump reservior of capacity 15000 ltr through bactriiological treatment by using suitable chemicals approved by Govt auth lab and ULTRA VIOLET RAY, through specialized agency. Seven stage are as under plants :- (a) First stage is to drain out the water by using exit valve or high capacity dewatering system (b) Second stage is cleaning all the algue formation inside the tank by using laboratory tested branded chemical of the company and scrubbing the walls of the tank (c) Third stage is fresh water cleaning by high speed jet pump (d) Fourth stage and first bacteria screening is disinfection by using branded halogen compound (e) Fifth stage is cleaning the floor of water tank by industrial vacuume cleaner (f) Sixth stage is the second bacteria screening and sterilizing method by using ultra violet ray within the tank and kill all suspended bacteria (g) Seven stage of cleaning and third bacteria screening us to sterilize the floor of the tank. Notes :- (i) Company will submit government laboratory test certificate of terbac-g5/inchor-5/nv-10, terbac-g65/inoxii-60/nb-69, before cleaning, fix the sticker mentioning the date of cleaning & name of site and also provide certificate confirming the completion of sterilization of water tanks mentioning the name of station and date of cleaning. All the cleaning & sterilization staffs should be under accidental insurance coverage. (ii) Outlet pipe of overhead tank should be plugged before cleaning the overhead tank to avoid entering scales and the quoted rate is deemed to include for the provision. (iii) Sterilization team will be comprised of at least 30% members who are minimum 03 months certificate holder in water tank sterilization. (iv) Contractor will be responsible for rectification of complaints occureed during cleaning the tank i.e. No water in tank/over flow due to broken of float valve/blockage to be included rate. (v) The above work will be either carried out in above seven stage or as directed and specified by Enge-in-charge. | 7 | Each job | 15,000 ₹1.1 L | 10,000 ₹70,000 | 10,000 ₹70,000 | 17,315 ₹1.2 L |
| 7.00 | Material & Labour for seven stage and sterilization of inside the RCC/Steel underground/semi underground/over head/sedimentation/ckear water sumps UG sump reservior of capacity 10000 gallons through bactriiological treatment by using suitable chemicals approved by Govt auth lab and ULTRA VIOLET RAY, through specialized agency. Seven stage are as under plants :- (a) First stage is to drain out the water by using exit valve or high capacity dewatering system (b) Second stage is cleaning all the algue formation inside the tank by using laboratory tested branded chemical of the company and scrubbing the walls of the tank (c) Third stage is fresh water cleaning by high speed jet pump (d) Fourth stage and first bacteria screening is disinfection by using branded halogen compound (e) Fifth stage is cleaning the floor of water tank by industrial vacuume cleaner (f) Sixth stage is the second bacteria screening and sterilizing method by using ultra violet ray within the tank and kill all suspended bacteria (g) Seven stage of cleaning and third bacteria screening us to sterilize the floor of the tank. Notes :- (i) Company will submit government laboratory test certificate of terbac-g5/inchor-5/nv-10, terbac-g65/inoxii-60/nb-69, before cleaning, fix the sticker mentioning the date of cleaning & name of site and also provide certificate confirming the completion of sterilization of water tanks mentioning the name of station and date of cleaning. All the cleaning & sterilization staffs should be under accidental insurance coverage. (ii) Outlet pipe of overhead tank should be plugged before cleaning the overhead tank to avoid entering scales and the quoted rate is deemed to include for the provision. (iii) Sterilization team will be comprised of at least 30% members who are minimum 03 months certificate holder in water tank sterilization. (iv) Contractor will be responsible for rectification of complaints occureed during cleaning the tank i.e. No water in tank/over flow due to broken of float valve/blockage to be included rate. (v) The above work will be either carried out in above seven stage or as directed and specified by Enge-in-charge. | 10 | Each job | 17,000 ₹1.7 L | 25,500 ₹2.5 L | 21,000 ₹2.1 L | 23,000 ₹2.3 L |
| 8.00 | Material & Labour for seven stage and sterilization of inside the RCC/Steel underground/semi underground/over head/sedimentation/ckear water sumps UG sump reservior of capacity 60000 gallons through bactriiological treatment by using suitable chemicals approved by Govt auth lab and ULTRA VIOLET RAY, through specialized agency. Seven stage are as under plants :- (a) First stage is to drain out the water by using exit valve or high capacity dewatering system (b) Second stage is cleaning all the algue formation inside the tank by using laboratory tested branded chemical of the company and scrubbing the walls of the tank (c) Third stage is fresh water cleaning by high speed jet pump (d) Fourth stage and first bacteria screening is disinfection by using branded halogen compound (e) Fifth stage is cleaning the floor of water tank by industrial vacuume cleaner (f) Sixth stage is the second bacteria screening and sterilizing method by using ultra violet ray within the tank and kill all suspended bacteria (g) Seven stage of cleaning and third bacteria screening us to sterilize the floor of the tank. Notes :- (i) Company will submit government laboratory test certificate of terbac-g5/inchor-5/nv-10, terbac-g65/inoxii-60/nb-69, before cleaning, fix the sticker mentioning the date of cleaning & name of site and also provide certificate confirming the completion of sterilization of water tanks mentioning the name of station and date of cleaning. All the cleaning & sterilization staffs should be under accidental insurance coverage. (ii) Outlet pipe of overhead tank should be plugged before cleaning the overhead tank to avoid entering scales and the quoted rate is deemed to include for the provision. (iii) Sterilization team will be comprised of at least 30% members who are minimum 03 months certificate holder in water tank sterilization. (iv) Contractor will be responsible for rectification of complaints occureed during cleaning the tank i.e. No water in tank/over flow due to broken of float valve/blockage to be included rate. (v) The above work will be either carried out in above seven stage or as directed and specified by Enge-in-charge. | 2 | Each job | 47,500 ₹95,000 | 65,150 ₹1.3 L | 37,000 ₹74,000 | 67,500 ₹1.4 L |
| 9.00 | Material & Labour for seven stage and sterilization of inside the RCC/Steel underground/semi underground/over head/sedimentation/ckear water sumps UG sump reservior of capacity 1,00,000 gallons through bactriiological treatment by using suitable chemicals approved by Govt auth lab and ULTRA VIOLET RAY, through specialized agency. Seven stage are as under plants :- (a) First stage is to drain out the water by using exit valve or high capacity dewatering system (b) Second stage is cleaning all the algue formation inside the tank by using laboratory tested branded chemical of the company and scrubbing the walls of the tank (c) Third stage is fresh water cleaning by high speed jet pump (d) Fourth stage and first bacteria screening is disinfection by using branded halogen compound (e) Fifth stage is cleaning the floor of water tank by industrial vacuume cleaner (f) Sixth stage is the second bacteria screening and sterilizing method by using ultra violet ray within the tank and kill all suspended bacteria (g) Seven stage of cleaning and third bacteria screening us to sterilize the floor of the tank. Notes :- (i) Company will submit government laboratory test certificate of terbac-g5/inchor-5/nv-10, terbac-g65/inoxii-60/nb-69, before cleaning, fix the sticker mentioning the date of cleaning & name of site and also provide certificate confirming the completion of sterilization of water tanks mentioning the name of station and date of cleaning. All the cleaning & sterilization staffs should be under accidental insurance coverage. (ii) Outlet pipe of overhead tank should be plugged before cleaning the overhead tank to avoid entering scales and the quoted rate is deemed to include for the provision. (iii) Sterilization team will be comprised of at least 30% members who are minimum 03 months certificate holder in water tank sterilization. (iv) Contractor will be responsible for rectification of complaints occureed during cleaning the tank i.e. No water in tank/over flow due to broken of float valve/blockage to be included rate. (v) The above work will be either carried out in above seven stage or as directed and specified by Enge-in-charge. | 2 | Each job | 67,000 ₹1.3 L | 75,300 ₹1.5 L | 60,000 ₹1.2 L | 75,000 ₹1.5 L |
| 10.00 | Material & Labour for seven stage and sterilization of inside the RCC/Steel underground/semi underground/over head/sedimentation/ckear water sumps UG sump reservior of capacity 1,50,000 gallons through bactriiological treatment by using suitable chemicals approved by Govt auth lab and ULTRA VIOLET RAY, through specialized agency. Seven stage are as under plants :- (a) First stage is to drain out the water by using exit valve or high capacity dewatering system (b) Second stage is cleaning all the algue formation inside the tank by using laboratory tested branded chemical of the company and scrubbing the walls of the tank (c) Third stage is fresh water cleaning by high speed jet pump (d) Fourth stage and first bacteria screening is disinfection by using branded halogen compound (e) Fifth stage is cleaning the floor of water tank by industrial vacuume cleaner (f) Sixth stage is the second bacteria screening and sterilizing method by using ultra violet ray within the tank and kill all suspended bacteria (g) Seven stage of cleaning and third bacteria screening us to sterilize the floor of the tank. Notes :- (i) Company will submit government laboratory test certificate of terbac-g5/inchor-5/nv-10, terbac-g65/inoxii-60/nb-69, before cleaning, fix the sticker mentioning the date of cleaning & name of site and also provide certificate confirming the completion of sterilization of water tanks mentioning the name of station and date of cleaning. All the cleaning & sterilization staffs should be under accidental insurance coverage. (ii) Outlet pipe of overhead tank should be plugged before cleaning the overhead tank to avoid entering scales and the quoted rate is deemed to include for the provision. (iii) Sterilization team will be comprised of at least 30% members who are minimum 03 months certificate holder in water tank sterilization. (iv) Contractor will be responsible for rectification of complaints occureed during cleaning the tank i.e. No water in tank/over flow due to broken of float valve/blockage to be included rate. (v) The above work will be either carried out in above seven stage or as directed and specified by Enge-in-charge. | 4 | Each job | 83,000 ₹3.3 L | 95,730 ₹3.8 L | 77,000 ₹3.1 L | 97,000 ₹3.9 L |
Updated dates
Tender Value
₹49 L
EMD Value
₹98,000
Closing Date
1 Jun 2026, 6:00 pmClosed
GE (ARMY) NO 2 JOHDPUR
Military Engineer Services, Garrison Engineer (Army) No 2 Jodhpur, Multan Lines, Army Area Jodhpur -342010
SERVICING / MAINTENANCE AND CLEANING OF OVER HEAD TANKS AND UG SUMPS OF WATER SUPPLY AND ALLIED WORKS AT ALL PUMP HOUSE IN ARMY AREA JODHPUR AS PER CPP SER NO 35
2026_MES_763363_1
8800/26-27/28/E8
Open Tender
Civil Works - Water Works
330 days
GE (ARMY) NO 2 JOHDPUR
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
GE (ARMY) NO 2 JODHPUR
₹98,000
Yes
12 Jun 2026
4 May 2026
3 Jun 2026
4 May 2026
1 Jun 2026
18 May 2026
Supply and laying pebbles 8 mm to 25 mm in different sizes to suit existing size and type all as spd and directed .
Supply and laying pebbles upto 6 mm in different sizes to suit existing size and type all as spd and directed.
Taking out existing inerlocking tile carefully and relaying same as per exiting including all material. Note :- During execution of the work if any damages like tile, PCC, cement etc contractor will repleced same with new without extra charges. Rate of Excavation and earth work returning filling, leveling and removing shall be deemed to be included in the rate quoted by contractor.
Taking up or down steel tubing/HDPE pipes alongwith fittings such as tee, bends etc and connections incl removal from site of the following sizes:-20mm bore.
Taking up or down steel tubing/HDPE pipes alongwith fittings such as tee, bends etc and connections incl removal from site of the following sizes:- 25mm bore.
Taking up or down steel tubing/HDPE pipes alongwith fittings such as tee, bends etc and connections incl removal from site of the following sizes:-50mm bore.
Taking up or down steel tubing/HDPE pipes alongwith fittings such as tee, bends etc and connections incl removal from site of the following sizes:-80mm bore.
Supply and fixing of galvanised iron pipe medium grade (ISI marked) with and including fittings medium grade (ISI Marked) laid in trenches jointed and tested complete all as specified and directed for the following bores:- 20 mm bore .
Supply and fixing of galvanised iron pipe medium grade (ISI marked) with and including fittings medium grade (ISI Marked) laid in trenches jointed and tested complete all as specified and directed for the following bores:- 25 mm bore .
Supply and fixing of galvanised iron pipe medium grade (ISI marked) with and including fittings medium grade (ISI Marked) laid in trenches jointed and tested complete all as specified and directed for the following bores:- 50 mm bore .
Supply and fixing of galvanised iron pipe medium grade (ISI marked) with and including fittings medium grade (ISI Marked) laid in trenches jointed and tested complete all as specified and directed for the following bores:- 80 mm bore .
Taking out U/S swimming pool vacuum hose pipe and S& F Heavy duty vaccum hose pipe of size 40mm.
Taking out unserviceable aluminium cable any size from site.
S&F XLPE armoured cable copper conductor 1.5sqmm 2 core all as specified and directed by EIC.
M & L for surface dressing including uprooting bushes/ grass etc all as directed by Engineer Incharge.
Excavation in trenches not exc 1.5m width and n,exc 1.5m in depth and getting out for laying of pipes etc in any type of soil, all as directed.Note : The contractor shall be responsible for the rectification of the damages during the excavation i.e existing pipes, cables, culverts, building and road, path etc.
Returning filling in incl spreading levelling watering and well ramming in layers n.exc 25cm in any type of soil all as specified and directed.
M & L for taking up cast iron (CI) / DI /GI water mains (including all fittings), with spigot and socket ends and lead joints of any size all as specified and dirercted by Engr-in-Charge of following 150 mm bore.
M & L for taking up cast iron (CI) / DI /GI water mains (including all fittings), with spigot and socket ends and lead joints of any size all as specified and dirercted by Engr-in-Charge of following of 200 mm bore.
Supply and lay DI pipe centrifugally cast of class K-9 with spigot and socket ends/flanged end suitable for tyton joints/flanged joints including rubber gasket/rubber ring and other accessories like nut-bolts etc for the following sizes: 150 mm bore.
Supply and lay DI pipe centrifugally cast of class K-9 with spigot and socket ends/flanged end suitable for tyton joints/flanged joints including rubber gasket/rubber ring and other accessories like nut-bolts etc for the following sizes : 200 mm bore.
Material and labour for fixing DI specials such as bends(any type, radius and angle),tappers any type, (straight, bend, increasing, decreasing or double socket etc) tee pieces single branch, 'Y' junction, double branch, cross (all sockets or socket and spigot) collars, caps & plugs of sizes :- Upto 150 mm bore .
Material and labour for fixing DI specials such as bends(any type, radius and angle),tappers any type, (straight, bend, increasing, decreasing or double socket etc) tee pieces single branch, 'Y' junction, double branch, cross (all sockets or socket and spigot) collars, caps & plugs of sizes :-Above 150 mm bore.
M&L PCC (1:2:4) type B-1 (using 20 mm graded stone aggregate) in support of pipes or foundationof pump complete all as directed. Note - The contract sum shall be calculated by deducting the amount shown in Credit Schedule attached to this tender, from total amount of Schedule 'A'/BOQ.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
TENDER.pdf
Tender Documents • 1.02 MB
BOQ_855063.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid