Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 LAccepted-AOC | ₹2.3 L Quoted ₹1.9 L | L1 | Accepted-AOC AOC DONE FOR KR CONSTRUCTION |
| Sl No | Description | Qty | Unit | KR CONSTRUCTIONS L1 |
|---|---|---|---|---|
| 1.00Name of the works | ||||
| 1.01 | Dismantling of the brick / stone masonry in Cement mortar walls clearing away and carefully stacking the materials suitable for reuse as directed by the Engineer incharge of work including cost of materials, lead, lift etc., complete. | 1 | Cum | 290 ₹290 |
| 1.02 | Earth work excavation for foundation including all labour charges including initial lead, lift, etc. complete.Hard Gravelly soil | 2 | Cum | 220 ₹440 |
| 1.03 | Earth work excavation for foundation including all labour charges including initial lead, lift, etc. complete.SDR not requiring Blasting | 1 | Cum | 400 ₹400 |
| 1.04 | Earth work excavation for foundation including all labour charges including initial lead, lift, etc. complete.MR AND DMR not requiring blasting | 2 | Cum | 600 ₹1,200 |
| 1.05 | Supplying and filling with M -sand for foundation including cost of sand, all labour, lead,lift, consolidation etc. complete. | 1 | Cum | 2,000 ₹2,000 |
| 1.06 | PCC 1:4:8, using 40mm HBG metal foundation without formwork including cost of cement, all materials, labour, lead, lift, etc. complete. | 1 | Cum | 6,000 ₹6,000 |
| 1.07 | RCC 1:1.5:3 using 12-20mm graded hard machine broken granite stone without formwork including cost of all materials, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement | 1 | Cum | 9,200 ₹9,200 |
| 1.08 | Refilling with excavated earth other than sand in foundation and sides of masonry, consolidation as per std.specn.with water including all, labour, lead , lift, etc., complete. | 1 | Cum | 25 ₹25 |
| 1.09 | Removing the excess earth to the nearby bund or low laying area instructed by field engineer including all lead, lift, etc., complete. | 3 | Cum | 160 ₹480 |
Tender Value
₹2.5 L
EMD Value
₹2,500
Closing Date
26 Feb 2026, 2:00 pmClosed
SUPERINTENDING ENGINEER
OFFICE OF THE SUPERINTENDING ENGINEER, KEDC, KOVAI ROAD, KARUR.
Improvements to Chinthamanipatty 33/11KV Substation by providing new cable trenches, repair and renovation of toilet ,etc., in existing control room building to accommodate the newly proposed additional panels under RDSS scheme at Karur
2026_EB_662762_1
SPEC 12/25-26 DT 20.02.2026
Open Tender
Civil Works
60 days
KARUR
AS PER TENDER DOCUMENTS
3 documents required · 3 mandatory
₹0
₹2,500
Yes
10 Mar 2026
20 Feb 2026
27 Feb 2026
20 Feb 2026
26 Feb 2026
20 Feb 2026
Name of the works
Dismantling of the brick / stone masonry in Cement mortar walls clearing away and carefully stacking the materials suitable for reuse as directed by the Engineer incharge of work including cost of materials, lead, lift etc., complete.
Earth work excavation for foundation including all labour charges including initial lead, lift, etc. complete.Hard Gravelly soil
Earth work excavation for foundation including all labour charges including initial lead, lift, etc. complete.SDR not requiring Blasting
Earth work excavation for foundation including all labour charges including initial lead, lift, etc. complete.MR AND DMR not requiring blasting
Supplying and filling with M -sand for foundation including cost of sand, all labour, lead,lift, consolidation etc. complete.
PCC 1:4:8, using 40mm HBG metal foundation without formwork including cost of cement, all materials, labour, lead, lift, etc. complete.
RCC 1:1.5:3 using 12-20mm graded hard machine broken granite stone without formwork including cost of all materials, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement
Refilling with excavated earth other than sand in foundation and sides of masonry, consolidation as per std.specn.with water including all, labour, lead , lift, etc., complete.
Removing the excess earth to the nearby bund or low laying area instructed by field engineer including all lead, lift, etc., complete.
Brickwork in CM 1:3 mix using bricks of size 9"x 4 3/8"x2"3/4" for super structure including cost of all materials, labour, lead, lift, curing, etc., complete. By using II class Champer Burnt bricks
RCC 1:1.5:3 mix using 12 to 20mm (machine crushed ) metal for continuous lintel, bed block, cover slab for staircase slab, water tank slab, with formwork
Providing steel reinforcement for RCC works including cost of steel rod binding wire and placing in postion of the steel reinforcement all materials, lead and lift etc., complete.
Plastering with CM.1:5 mix using 12mm thick for inside & outside walls, including cost of all materials, water charges, labour, lead, litf, etc, complete.
White washing two coats with white cement over a primary coat for ceiling, exposed surfaces of wall, beam, slab, sunshade, lintel, etc, including cost of all materials, lead, lift, etc., complete.
Painting the wall two coats with approved weather proof Interior Emulsion paint over one primer coat of over cement plastered wall surface etc., complete complying with standard specification.
Fabricating Supplying and fixing in position of Aluminium anodised natural colour matt finish of single leaf door with half panelled with 12mm thick both side laminated particle board at bottom and half glazed using 5.50mm thick Plain glass at top.The outer frame shall be with aluminium box section 101.60x44.45x3.18m at 2.319kg/m and Shutter frame made of section Vertical & Top rail: 50x44.45x2.50mm @ 1.292 kg/m ,Bottom rail: 100 x44.45 x 2.50mm@ 1.974 kg/m, Lock rail : 50x44.45x2.5mm @ 1.292 kg/m, Alu Clips: 17.15x17.27x1.50mm @ 0.176 kg/m,Alu. Handle: 100x30mm @ 0.988 Kg/m and necessary accessories such as aluminium clips, rubber beading, PVC felt, handle for a length of shutter (both sides), locking arrangements, furniture fittings such as aluminium tower bolts-250x12mm - Each., aluminium tower bolt 200x12mm - 1No., aluminium Hydraulic door closer - 1No ., lock-1No., Door stopper with rubber bush including cost of materials labour charges and power consumption charges required for fabrication including chipping, dismantling and making hole to the required extent in RCC column, beams, masonry with power drill wherever necessary and redoing the damaged portion to the original condition after fixing etc., complete complying with standard specification and as directed by the deparmental officers.
Supplying and fixing chequered plate for cable duct cover including the cost of materials,lead lift, etc, complete
Flooring with approved spartex ceramic of non slippery type tiles over cement mortar 1:3,12mm thick including pointing with white cement finishing the joints, flush pointing the surface etc., complete.
Dadooing with glazed tiles of best approved quality of make johnson, neycer etc., over cm 1:3, 10mm thick including cost of all materials, labour, lead, lift, etc., complete.
Supply,transport and fixing of 1000 litre PVC sintex tank over the roof.
Providing and fixing sanitary fitting consisting of parryware of oriya patten Indian Water Closet with P/S trap connecting with PVC ventilating shaft and Y bend complete, including cost of all material, labour, lead, lift, etc, complete.
Supplying and fixing in position of European Water Closet size 580X420mm white glazed earthen ware of approved make & quality with 'P' or 'S' trap conforming to IS - 2556 Part XII [Parryware or Equivalent] with sand cushion and forming flooring around the cloast using 40mm broken brick jelly in lime concrete 1:2:5 [1/lime, 2/sand & 5/brick jelly] 100mm thick and finishing the top to required slope and giving connection to sewer line including the cost of all materials, labour, lead, lift, T&P, etc. complete.
Supplying and laying pvc pipe 32 mm outer dia 10kg/ cm2 ISI make including cost of pvc pipe coupling labour for cutting laying fixing tighting etc including earth work excavation and refilling trench etc complete
Supplying and fixing inposition of 32mm dia gate valve of best quality such as leader, zeolite, zenith including cost of all special fixtures lead, lift,etc., complete.
Supplying and fixing of 15mm dia screw down tap with necessary specials including cost of all materials lead, lift, labour etc.,complete.
Supplying and laying Pvc pipe 110 mm outer dia 6kg/ cm2 ISI make for laying the sewer line including cost of pvc pipe coupling labour for cutting laying fixing tighting etc including earth work excavation and refilling trench etc complete
Tender floated for the whole event.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
BOQ_795663.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid