Loading…
Loading…
Tender Value
₹19.9 L
EMD Value
₹20,000
Closing Date
3 Sept 2026, 6:00 pm7d left
Executive Engineering UPSIC KANPUR
Executive Engineering UPSIC KANPUR
Construction Of C.C. Road And Drain In Front Of The Civil Court
2026_MSME_1180272_11
1024/EE4/26-27
Open Tender
Civil Works
Percentage
120 days
BAHRAICH
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Executive Engineering UPSIC KANPUR
₹20,000
27 Aug 2026
27 Aug 2026
4 Sept 2026
27 Aug 2026
3 Sept 2026
27 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dimentaling of Old Interlocking Tiles. | 814.76 | m2 | 45 | ₹36,664.2 |
| 2 | Earth work in Excavation in trenches for foundations pipes cable etc in ordinary soil (Loam clay or sand) including lift upto 1.5 m. lead upto 50m and dressing of sides and rammings of bottom and disposal of surplus exdavated earth as directed by the Engineer I/C within a lead of 30 m. | 32.45 | m3 | 125 | ₹4,056.25 |
| 3 | Providing and laying Cement concrete 1:5:10( 1 cement : 5 fine sand : 10 graded brick aggregate 40 mm. nominal size) including supply of all materials. labour and T&P etc. required for proper completion of the work and curing complete, also including cost of formwork in foundation and floors. | 8.66 | m3 | 4,300 | ₹37,238 |
| 4 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per (MORD) Technical Specification Clause 401. | 102.91 | m3 | - | - |
| 5 | Class-150 brick work in 1:4 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and T & P etc. required for proper completion of the work. | 21.83 | m3 | 6,000 | ₹1,30,980 |
| 6 | Providing and laying Cement concrete 1:2:4 ( 1 cement : 2coarse sand : 4 graded stone ballast 20 mm. nominal size including supply of all materials. labour and T&P etc. required for proper completion of the work and curing complete, also including cost of formwork in foundation and floors. | 129.84 | m3 | 9,100 | ₹11,81,544 |
| 7 | Supplay Of Polythene Sheet 125 Micron Including All Material Labour Etc Complete. | 823.24 | m2 | 40 | ₹32,929.6 |
| 8 | R.C.C. work with cement approved coarse sand and 20 mm gauge approved stone grit in the proportion of 1:2:4 in lintels of doors and windows excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour and T & P etc. required for proper completion of the work. Binding wire cost being included in the item. | 6.09 | m3 | 10,000 | ₹60,900 |
| 9 | Mild steel or iron in plain work shch as reinforced concrete or reinforced brick work(when not included in overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorized overlapping shall be measured up to floor two level. | 4.78 | Qtl | 6,150 | ₹29,397 |
| 10 | 12mm Thick Plaster With Cement Mortar In 1:4 Cement And Coarse Sand Etc All Complete. | 72.75 | m2 | 205 | ₹14,913.75 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.94 MB
BOQ_2219466.xls
BOQ • 0.27 MB
TermsandConditionTenderCivilWorks.pdf
Tender Documents • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].