Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.0 CrAccepted-AOC | ₹38.0 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹40.0 CrRejected-AOC | ₹40.0 Cr | L2 | Rejected-AOC Rejected |
| 3 | L3₹40.8 CrRejected-AOC | ₹40.8 Cr | L3 | Rejected-AOC Rejected |
Tender Value
Refer Docs
Closing Date
17 Dec 2021, 12:00 pmClosed
CHIEF ENGINEER PROJECT VARTAK
HQ CHIEF ENGINEER PROJECT VARTAK, TEZPUR, SONITPUR-784001
CONSTR OF FOOT TRACK INCL EARTHWORK, SURF WKS, ROAD FURNITURE, FOOT SUSPENSION BRIDGES, LOG BRIDGES, STAGING CAMPS AND ROAD PROTECTION WORKS FROM MAGO TO TSELA (NET LENGTH 27.418 KM) THROUGH EPC MODE OF EXECUTION IN THE STATE OF ARUNACHAL PRADESH
2021_BRO_474625_1
CE (P) VTK/NIB-07/2021-22
Open Tender
Civil Works
1095 days
MAGO TO TSELA (ARUNACHAL PRADESH)
Please refer Tender documents.
3 documents required · 3 mandatory
₹11,800
Yes
CHIEF ENGINEER PROJECT VARTAK
Exempted
HQ CHIEF ENGINEER PROJECT VARTAK, TEZPUR, SONITPUR
2 May 2022
13 Sept 2021
18 Dec 2021
13 Sept 2021
17 Dec 2021
13 Sept 2021
13 Sept 2021 - 10 Dec 2021
11 Dec 2021
CONSTRUCTION OF FOOT TRACK INCLUDING EARTHWORK, SURFACING WORKS, ROAD FURNITURE, FOOT SUSPENSION BRIDGES, LOG BRIDGES, STAGING CAMPS AND ROAD PROTECTION WORKS FROM MAGO TO TSELA (NET LENGTH 27.418 KM) THROUGH EPC MODE OF EXECUTION IN AREA OF RESPONSIBILITY OF PROJECT VARTAK IN THE STATE OF ARUNACHAL PRADESH
M/S MONYUL ENTERPRISES
M/s Ratna Infrastructure Projects Pvt Ltd
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid