Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC | ₹1.5 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.8 Cr+₹25.9 L (16.9%)Rejected-AOC | ₹1.8 Cr+₹25.9 L (16.9%) | L2 | Rejected-AOC L2 |
| 3 | L3₹1.9 Cr+₹35.3 L (23.0%)Rejected-Finance | ₹1.9 Cr+₹35.3 L (23.0%) | L3 | Rejected-Finance L3 |
| 4 | L4₹1.9 Cr+₹41.1 L (26.8%)Rejected-Finance | ₹1.9 Cr+₹41.1 L (26.8%) | L4 | Rejected-Finance L4 |
| 5 | L5₹2.0 Cr+₹44.0 L (28.7%)Rejected-Finance | ₹2.0 Cr+₹44.0 L (28.7%) | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | D S RAJESHKUMAR L4 | SABU K.S. L7 | A AJI L3 | MATHILAKATHCONSTRUCTION PRIVATE LIMITED L1 | Simon TJ L2 | ANEESH. R L6 | Sanal Kumar D R L5 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Working charges | ||||||||||
| 1.00 | 100.59.1:Cutting the bituminous / concrete roads with cutting machine for a minimum depth of 200mm along the sides of proposed alignment of the pipe to be laid without causing any damage to other utilities, including the charges for hire and conveyance of tools and plant, cost of consumables and charges for lighting, watching, ribbon fencing, caution boards, traffic diversion, and as per the direction of departmental officers etc. complete, before carrying out the demolition of bituminous / concrete road by mechanical means and carrying out the excavation. | 1,505 | metre | 23 ₹34,615 | 25.78 ₹38,798.9 | 22.73 ₹34,208.65 | 24 ₹36,120 | 21.89 ₹32,944.45 Lowest | 23.53 ₹35,412.65 | 24.95 ₹37,549.75 |
| 1.00 | 15.59:Dismantling of flexible pavement ( bituminous courses ) by mechanical means and disposal of dismantled material up to a lead of 1 kilo metre, as per direction of Engineer-in-charge. | 507.62 | cum | 365 ₹1,85,283.13 | 414.77 ₹2,10,547.62 | 365.71 ₹1,85,643.54 | 401 ₹2,03,557.63 | 352.33 ₹1,78,851.52 Lowest | 379 ₹1,92,389.88 | 401.39 ₹2,03,755.6 |
| 1.00 | 15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix) | 18 | cum | 1,350 ₹24,300 | 1,477.74 ₹26,599.32 | 1,302.96 ₹23,453.28 | 1,430 ₹25,740 | 1,255.28 ₹22,595.04 Lowest | 1,349.04 ₹24,282.72 | 1,430.07 ₹25,741.26 |
| 1.00 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | 5,367.24 | cum | 568 ₹30,48,592.32 | 644.73 ₹34,60,420.65 | 568.47 ₹30,51,114.92 | 623 ₹33,43,790.52 | 546 ₹29,30,513.04 Lowest | 590 ₹31,66,671.6 | 554.61 ₹29,76,724.98 |
| 1.00 | 100.1.5:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50 m, in Ordinary Rock. | 6.03 | cum | 869 ₹5,240.07 | 951.01 ₹5,734.59 | 838.52 ₹5,056.28 | 920 ₹5,547.6 | 807.84 ₹4,871.28 Lowest | 868.18 ₹5,235.13 | 920.33 ₹5,549.59 |
| 1.01 | 100.1.13:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in Hard Rock where Blasting is Prohibited. | 6.03 | cum | 1,676 ₹10,106.28 | 1,833.41 ₹11,055.46 | 1,616.56 ₹9,747.86 | 1,773 ₹10,691.19 | 1,557.41 ₹9,391.18 Lowest | 1,673.73 ₹10,092.59 | 1,774.27 ₹10,698.85 |
| 1.01 | 100.7.1:Bailing out water with 5HP engine and pump set including conveyance to the site, erecting, dismantling and taking back of engine and pump, cost of fuel lubricating oil and other stores pay of staff etc., complete. | 298.4 | Kwh | 34 ₹10,145.6 | 37.4 ₹11,160.16 | 32.98 ₹9,841.23 | 36 ₹10,742.4 | 31.77 ₹9,480.17 Lowest | 34.15 ₹10,190.36 | 36.2 ₹10,802.08 |
| 1.01 | 100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals. | 5,810 | metre | 25 ₹1,45,250 Lowest | 30.45 ₹1,76,914.5 | 26.85 ₹1,55,998.5 | 28.8 ₹1,67,328 | 25.86 ₹1,50,246.6 | 27.8 ₹1,61,518 | 29.47 ₹1,71,220.7 |
| 1.01 | 100.14.5:Conveying and laying S&S Centrifugally Cast (Spun) / Ductile Iron Pipes conforming to IS: 8329 excluding cost of pipes and specials: 300mm diameter Ductile Iron Class K-9 Pipes. | 100 | metre | 221 ₹22,100 | 242.46 ₹24,246 | 213.78 ₹21,378 | 234 ₹23,400 | 205.96 ₹20,596 Lowest | 221.34 ₹22,134 | 234.64 ₹23,464 |
Tender Value
₹2.2 Cr
EMD Value
₹1 L
Closing Date
17 Jun 2026, 3:00 pmClosed
The Superintending Engineer, Public Health Circle,
O/o The Superintending Engineer, Public Health Circle, Kerala Water Authority, Thiruvananthapuram
KIIFB Utility Shifting of Pipe Line and Alteration of Existing Connections along Mannathala Society Junction Powdikonam Reach I
2026_KWA_855398_1
02/2026-27/KWA/PHC/D5/TVM
Open Tender
Civil Works - Water Works
Item Rate
270 days
Powdikonam
Please refer Tender documents.
7 documents required · 7 mandatory
₹8,270
₹1 L
Yes
17 Sept 2026
11 Jun 2026
18 Jun 2026
11 Jun 2026
17 Jun 2026
11 Jun 2026
11 Jun 2026 - 17 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Working charges | |||||
| 1.001 | 100.59.1:Cutting the bituminous / concrete roads with cutting machine for a minimum depth of 200mm along the sides of proposed alignment of the pipe to be laid without causing any damage to other utilities, including the charges for hire and conveyance of tools and plant, cost of consumables and charges for lighting, watching, ribbon fencing, caution boards, traffic diversion, and as per the direction of departmental officers etc. complete, before carrying out the demolition of bituminous / concrete road by mechanical means and carrying out the excavation. | - | metre | - | - |
| 1.002 | 15.59:Dismantling of flexible pavement ( bituminous courses ) by mechanical means and disposal of dismantled material up to a lead of 1 kilo metre, as per direction of Engineer-in-charge. | - | cum | - | - |
| 1.003 | 15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix) | - | cum | - | - |
| 1.004 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | 1 | cum | - | - |
| 1.005 | 100.1.5:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50 m, in Ordinary Rock. | - | cum | - | - |
| 1.006 | 100.1.13:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in Hard Rock where Blasting is Prohibited. | - | cum | - | - |
| 1.007 | 100.7.1:Bailing out water with 5HP engine and pump set including conveyance to the site, erecting, dismantling and taking back of engine and pump, cost of fuel lubricating oil and other stores pay of staff etc., complete. | 1 | Kwh | - | - |
| 1.008 | 100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals. | - | metre | - | - |
| 1.009 | 100.14.5:Conveying and laying S&S Centrifugally Cast (Spun) / Ductile Iron Pipes conforming to IS: 8329 excluding cost of pipes and specials: 300mm diameter Ductile Iron Class K-9 Pipes. | - | metre | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
KWAGeneralConditionsforeTenderingV5.pdf
PDF • 0.69 MB
Tendernotice_1.pdf
PDF • 0.09 MB
NITKIIFB.pdf
Tender Documents • 0.84 MB
BOQ_1445667.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .