| Sl No | Description | Qty | Unit | ANEESH. R L1 | ANISH. R L2 |
|---|---|---|---|---|---|
| 1.00Labour charge for pipe laying | |||||
| 1.00 | 15.59:Dismantling of flexible pavement ( bituminous courses ) by mechanical means and disposal of dismantled material up to a lead of 1 kilo metre, as per direction of Engineer-in-charge. | 13.8 | cum | 437.07 ₹6,031.57 Lowest | 470 ₹6,486 |
| 1.00 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 1.2 | cum | 2,521.4 ₹3,025.68 Lowest | 2,701 ₹3,241.2 |
| 1.00 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | 147 | cum | 679.39 ₹99,870.33 Lowest | 730 ₹1,07,310 |
| 1.00 | 100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals. | 184 | metre | 32.09 ₹5,904.56 Lowest | 35 ₹6,440 |
| 1.00 | 100.9.9:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 110 mm nominal outside diameter pipes. | 230 | metre | 153.91 ₹35,399.3 Lowest | 165 ₹37,950 |
| 1.01 | 100.31.1.2:Conveying and fixing C.I. sluice valves (with cap) by providing bolts, nuts, rubber insertions etc., complete, but excluding the cost of the valve (tail pieces, if required, will be paid separately): 100mm diameter, Class I. | 1 | no | 1,030.07 ₹1,030.07 Lowest | 1,103 ₹1,103 |
| 1.01 | OD313411/2025-2026:Alteration of 20mm (3/4 inch) house connection with 15mm (1/2 inch) water meter from existing PVC / HDPE pipe up to 200mm dia., up to a length of 5 m using 25mm Indian Standard Class 6 uPVC pipe and uPVC / GM / Brass specials viz. brass ferrule, GM full way wheel valve, Elbow, MTA, couplers, PVC Service Saddle of suitable size etc. and connecting with the mains, testing the joints etc. complete including trenching and refilling in all kinds of soil up to a depth of 1.50m for main line tracing and trench of average cross section 0.3m x 0.75m for laying connection pipe and service pipe,, lighting, watching, providing caution boards, traffic control etc. complete including cost of materials, hire for tools, cost of consumables and labour charges but excluding cost of water meter and meter box and excluding charges for cutting the concrete / tarred / bituminous roads etc, and as per the direction of the departmental officers | 30 | each | 2,652.17 ₹79,565.1 Lowest | 2,841 ₹85,230 |
| 1.01 | 100.60.3.2.1:Providing additional length of house connection pipe using 25mm Indian Standard Class 6 uPVC pipe and specials and testing the joints etc., by trenching and refilling in all kinds of soil with trench of average cross section 0.3m x 0.75m for laying of connection pipe and service pipe, lighting, watching, providing caution boards, traffic control etc., including cost of materials, hire for tools, cost of consumables and labour charges etc. complete, but excluding the cost of cutting of concrete / tarred / bituminous roads etc., and as per the directions of the department officers | 30 | metre | 207.65 ₹6,229.5 Lowest | 2,225 ₹66,750 |
| 1.01 | OD313412/2025-2026:Interconnection of existing pipeline with newly laid pipeline including earthwork excavation for exposing the line, fencing, bailing out water, boring the line or supplying and fixing PVC tee, taking connection including supplying all necessary pipe and specials etc. complete. | 3 | each | 1,544 ₹4,632 Lowest | 1,655 ₹4,965 |
Tender Value
₹5.3 L
EMD Value
₹13,189
Closing Date
16 May 2026, 3:30 pmClosed
Assistant Executive Engineer
Water Works Central Sub Division, Vellayambalam
O and M Water Supply Schemes Urgent Water Shortage rectification in Chennilode Colony Replacement of 100mm AC Pipe with 110mm PVC Pipe Department Supply Pipeline Work
2026_KWA_849695_1
KWA/KWA-CE(SR)/TR/4553/2026
Open Tender
Civil Works - Water Works
Item Rate
30 days
Chennilode colony
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,165
Yes
₹13,189
Yes
21 Aug 2026
8 May 2026
18 May 2026
8 May 2026
16 May 2026
8 May 2026
8 May 2026 - 16 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Labour charge for pipe laying | |||||
| 1.001 | 15.59:Dismantling of flexible pavement ( bituminous courses ) by mechanical means and disposal of dismantled material up to a lead of 1 kilo metre, as per direction of Engineer-in-charge. | - | cum | - | - |
| 1.002 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 1 | cum | - | - |
| 1.003 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | - | cum | - | - |
| 1.004 | 100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals. | - | metre | - | - |
| 1.005 | 100.9.9:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 110 mm nominal outside diameter pipes. | - | metre | - | - |
| 1.006 | 100.31.1.2:Conveying and fixing C.I. sluice valves (with cap) by providing bolts, nuts, rubber insertions etc., complete, but excluding the cost of the valve (tail pieces, if required, will be paid separately): 100mm diameter, Class I. | - | no | - | - |
| 1.007 | OD313411/2025-2026:Alteration of 20mm (3/4 inch) house connection with 15mm (1/2 inch) water meter from existing PVC / HDPE pipe up to 200mm dia., up to a length of 5 m using 25mm Indian Standard Class 6 uPVC pipe and uPVC / GM / Brass specials viz. brass ferrule, GM full way wheel valve, Elbow, MTA, couplers, PVC Service Saddle of suitable size etc. and connecting with the mains, testing the joints etc. complete including trenching and refilling in all kinds of soil up to a depth of 1.50m for main line tracing and trench of average cross section 0.3m x 0.75m for laying connection pipe and service pipe,, lighting, watching, providing caution boards, traffic control etc. complete including cost of materials, hire for tools, cost of consumables and labour charges but excluding cost of water meter and meter box and excluding charges for cutting the concrete / tarred / bituminous roads etc, and as per the direction of the departmental officers | - | each | - | - |
| 1.008 | 100.60.3.2.1:Providing additional length of house connection pipe using 25mm Indian Standard Class 6 uPVC pipe and specials and testing the joints etc., by trenching and refilling in all kinds of soil with trench of average cross section 0.3m x 0.75m for laying of connection pipe and service pipe, lighting, watching, providing caution boards, traffic control etc., including cost of materials, hire for tools, cost of consumables and labour charges etc. complete, but excluding the cost of cutting of concrete / tarred / bituminous roads etc., and as per the directions of the department officers | - | metre | - | - |
| 1.009 | OD313412/2025-2026:Interconnection of existing pipeline with newly laid pipeline including earthwork excavation for exposing the line, fencing, bailing out water, boring the line or supplying and fixing PVC tee, taking connection including supplying all necessary pipe and specials etc. complete. | - | each | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1435789.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
KWAGeneralConditionsforeTenderingV5.pdf
PDF • 0.69 MB
Tendernotice_1.pdf
PDF • 0.05 MB
Tendernotice_2.pdf
PDF • 0.35 MB
Tendernotice_3.pdf
PDF • 0.09 MB
BOQ_1435789.xls
BOQ • 0.34 MB
corrigendum.pdf
PDF • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].