Loading…
Loading…
Tender Value
₹15.1 Cr
EMD Value
₹25.1 L
Closing Date
31 Aug 2026, 5:00 pm7d left
EE HIMUDA DIVISION GHUMARWIN
EE HIMUDA DIVISION GHUMARWIN
Construction of Multi utility Sports complex at Ghumarwin District Bilaspur HP SH Construction of building with Hybrid structure of RCC Framed Building and pre engineering portal frame including WS SI electrical work and all weather swimming pool 3
2026_HIMUD_141024_1
E-49-2026
Open Tender
Civil Works
Percentage
365 days
Ghumarwin
Please refer tender documents
11 documents required · 11 mandatory
₹5,900
₹25.1 L
HIMUDA NIGAM VIHAR SHIMLA
31 Aug 2026
12 Aug 2026
1 Sept 2026
12 Aug 2026
31 Aug 2026
12 Aug 2026
17 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil all lead and lifts as directed by the Engineer-in- charge. All kinds of soil | 2,061.44 | cum. | 255.2 | ₹5,26,079.49 |
| 2 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. All kinds of soil. | 4,926.56 | cum. | 679.6 | ₹33,48,090.18 |
| 3 | Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth upto 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within all lead and lifts as directed by the Engineer incharge. (a) Pipes, cables etc. exceeding 300 mm dia but not exceeding 600 mm | 300 | cum. | 356.5 | ₹1,06,950 |
| 4 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. including carriage of material in all leads and lifts. | 988.03 | cum. | 1,730.3 | ₹17,09,588.31 |
| 5Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level including carriage of material in all leads and lifts. | |||||
| 5.01 | 1:4:8 (1 Cement : 4 coarse sand) : 8 graded stone aggregate 40 mm nominal size) | 227.32 | cum. | 5,665.4 | ₹12,87,858.73 |
| 5.02 | 1:5:10 (1 cement : 5 coarse sand): 10 graded stone aggregate 40 mm nominal size) | 384.12 | cum. | 5,328.8 | ₹20,46,898.66 |
| 6 | Providing & applying a coat of residual petroleum bitumen of grade of VG-10 of approved quality using 1.7kg per square metre on damp proof course after cleaning the surface with brushes and finally with apiece of cloth lightly soaked in kerosene oil. including carriage of material in all leads and lifts. | 432.19 | sqm | 95.85 | ₹41,425.41 |
| 7 | Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement : 3 coarse sand (zone- III) : 6 graded stone aggregate 20 mm nominal size) over 75mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including necessary excavation, levelling & dressing & finishing the top smooth. including carriage of material in all leads and lifts. | 248.03 | sqm | 631.5 | ₹1,56,630.95 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for including carriage of material in all leads and lifts. (a) Foundations, footings, bases of columns, etc. for mass concrete | 579.74 | sqm | 304.5 | ₹1,76,530.83 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.24 MB
Condition.pdf
Additional Documents • 6.94 MB
TenderForm.pdf
Tender Documents • 1.33 MB
BOQ_209303.xls
BOQ • 0.69 MB
UNDERTAKING.pdf
Additional Documents • 0.25 MB
Corrigendum.pdf
PDF • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].