Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹2.7 L+₹1.0 L (61.9%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
Refer Docs
Closing Date
29 Oct 2020, 4:00 pmClosed
DGM MAINTENANCE
MFL,MANALI,CHENNAI.
DESIGN, SUPPLY, ERECTION AND COMMISSIONING OF LIGHTNING PROTECTION EQUIPMENT AT STRIPPER PLANT AND UTILITY BOILER ROOF
2020_MFL_592753_1
ESER/MAINT/LIGHTNING /291020/019 dated 23.10.2020
Limited
Miscellaneous Services
Works
14 days
MFL, MANALI
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
20 Jan 2021
23 Oct 2020
2 Nov 2020
23 Oct 2020
29 Oct 2020
23 Oct 2020
SUPPLY OF AIR TERMINATION
Supply of fully autonomous CPRI tested Early Streamer Emission lightning conductor (ESELC) having Delta T (gain in triggering Time) of minimum 20 micro second and Radius of Protection not less than 110 mtrs in level 3 Protection Zone When installed above the roof from direct Lightning Strikes. Make – Any make
Supply of 5m elevation pole made of GI with a dia of 40mm with a M20 thread at the top to fix the unit. Supplied with Bracket, clamps and all required fixing equipment.
SUPPLY OF DOWN CONDUCTOR
Supply of 70 sq.mm insulated copper cable. Able to withstand 250KA current and above. Compliant with NFC17 102 and IEC62305.
Supply of test clamp to connect the down conductor to earth termination and discount from the earth termination for regular checks of the earth termination.
SUPPLY OF ADVANCE EARTHING (MAINTENANCE FREE)
Supply of potential Copper PC38.2 Earth Electrode 38 mm dia 2 meter long. Earth life Compound Bag 25KG with chamber.
Installation, Testing and commissioning of the - Earth streamer Emission lightning protection Air terminal, Mounting support, Down-conductor and Maintenance - free earthing system. The installation should be strictly followed as per the norms.
Description of Work / Item(s)
SUPPLY OF AIR TERMINATION
Supply of fully autonomous CPRI tested Early Streamer Emission lightning conductor (ESELC) having Delta T (gain in triggering Time) of minimum 20 micro second and Radius of Protection not less than 110 Mtrs in level 3 Protection Zone When installed above the roof from direct Lightning Strikes. Make – Any make
Supply of 5m elevation pole made of GI with a dia of 40mm with a M20 thread at the top to fix the unit. Supplied with Bracket, clamps and all required fixing equipment.
SUPPLY OF DOWN CONDUCTOR
Supply of 70 sq.mm. Insulated copper cable. Able to withstand 250KA current and above. Compliant with NFC17 102 and IEC62305.
Supply of test clamp to connect the down conductor to earth termination and discount from the earth termination for regular checks of the earth termination
SUPPLY OF ADVANCE EARTHING (MAINTENANCE FREE)
Supply of potential Copper PC38.2 Earth Electrode 38 mm dia 2 meter long. Earth life Compound Bag 25KG with chamber.
Installation, Testing and commissioning of the - Earth streamer Emission lightning protection Air terminal, Mounting support, Down-conductor and Maintenance - free earthing system. The installation should be strictly followed as per norms.
VALUEENGINEERS
VALUEENGINEERS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .