Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹8.7 LAccepted-Finance | ₹8.7 L | L-1 | Accepted-Finance Lowest-1 |
| 2 | L-2₹10.9 L+₹2.3 L (26.4%)Rejected-Finance | ₹10.9 L+₹2.3 L (26.4%) | L-2 | Rejected-Finance Lowest-2 |
| 3 | L-3₹14 L+₹5.3 L (61.8%)Rejected-Finance | ₹14 L+₹5.3 L (61.8%) | L-3 | Rejected-Finance Lowest-3 |
| 4 | L-4₹15.0 L+₹6.3 L (73.0%)Rejected-Finance | ₹15.0 L+₹6.3 L (73.0%) | L-4 | Rejected-Finance Lowest-4 |
| 5 | L-5₹15.4 L+₹6.7 L (77.9%)Rejected-Finance NOT SPECIFIED | ₹15.4 L+₹6.7 L (77.9%) | L-5 | Rejected-Finance Lowest-5 |
| Sl No | Description | Qty | Unit | GD Builders & Construction Associates L3 | Pankaj Chauhan Govt. Contr. L1 | Jitender Kumar L5 | suraj chaudhary L4 | Harish kumar L6 | KARTIK MAHAJAN L2 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Providing and fixing of UV Purification system of Alfaa/ Equivalent make 16000 LPH for STP complete in all respect with in all leads and lifts as per the direction and satisfaction of Engineer-in-Charge. | 1 | No. | 10,00,000 ₹10,00,000 | 4,30,000 ₹4,30,000 Lowest | 7,70,000 ₹7,70,000 | 7,76,428 ₹7,76,428 | 8,10,000 ₹8,10,000 | 6,43,000 ₹6,43,000 |
| 1.01Technical Specification:- Model:- WL08 Flow rate:- 20.0 m3 /Hr UV Dose:- 60,000 uW-sec/cm2 UV Transmission (Per cm):- 0.80 Voltage:- 220-240V/50-60Hz Maximum power consumption (W):- 940 W Number of Lamps:- 8.00 Max. Lamp cable length (meters):- 4.50 Ballast type:- Electronic with Programmed start MOC:- Stainless steel 316L End connection:- 2"BSP (M) Maximum operating pressure:- 80 psi Maximum operating temperature:- 45 degrees C Maximum sanitization temperature:- 85 degrees C (lamps turned off) Quartz Jacket MOC:- High Purity Quartz (UVT > 95%) Lamp status indicator:- Yes Lamp running Hour counter:- Yes UV intensity Meter w/ 4-20 mA output:- Optional (UVM710) | |||||||||
| 2.00 | Providing and fixing of various allied accessories for water treatment at STP complete in all respect with in all leads and lifts as per the direction and satisfaction of Engineer-in-Charge. | 1 | Job | 4,00,000 ₹4,00,000 Lowest | 4,35,000 ₹4,35,000 | 7,69,000 ₹7,69,000 | 7,20,255 ₹7,20,255 | 8,15,000 ₹8,15,000 | 4,50,000 ₹4,50,000 |
| 2.01Product/ Services Name:- Butterfly valve 100 mm dia - 10 Nos. Pipe 100mm UPVC - 4 Nos. NRV UPVC 100 mm -2 Nos. Chemical Dosing pump 10 LPH- 2 Nos. Tank 100 Liters Capacity - 2 Nos. Pressure Gauge - 2 Nos. Electric control Pannel with auto manual with float sensor - 1 No. MS skid for pump and electric pannel- 1 No. Dewatering sewage submersible 2 BHP - 1 No. Freight charges - 1Job | |||||||||
Tender Value
₹15.0 L
EMD Value
₹30,000
Closing Date
10 Apr 2026, 10:00 amClosed
EE
Executive Engineer JS Division Baggi Distt. Mandi H.P.
as per BOQ
2026_HPIPH_133141_1
EE-JSD-BGI/2026- 26-77 dt. 01/04/2026
Open Tender
Civil Works
Item Rate
90 days
Baggi
as per NIT
6 documents required · 6 mandatory
₹500
₹30,000
5 May 2026
2 Apr 2026
10 Apr 2026
2 Apr 2026
10 Apr 2026
2 Apr 2026
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
FORM_6.pdf
Tender Documents • 0.42 MB
TC.pdf
Tender Documents • 0.14 MB
BOQ_196913.xls
BOQ • 2.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .