| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.0 LAccepted-AOC MOONIDIH DHANBAD 828129 | DHANBAD | DHANBAD | JHARKHAND | 828129 | ₹8.0 L Quoted ₹6.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹6.3 LRejected-AOC MOONIDIH COLLIERY CIL | ₹6.3 L | L2 | Rejected-AOC L2 |
| 3 | L3₹6.3 LRejected-AOC MOONIDIH DHANBAD 828129 | DHANBAD | DHANBAD | JHARKHAND | 828129 | ₹6.3 L | L3 | Rejected-AOC L3 |
Tender Value
₹6.0 L
EMD Value
₹7,555
Closing Date
2 Mar 2026, 5:00 pmClosed
S.K.Panja
Office of the Project Officer,WJ Area
Dismantling, Transportation, maintenance of 60lbs, 50lbs ,laying fitting 50lbs track line at in XVI(T ) verious places Moonidih Colliery, W J Area
2026_BCCL_353675_1
BCCL/WJA/MND/SUR/2025-26/111
Open Tender
Miscellaneous Works
20 days
Moonidih Colliery, WJ Area
Please refer to NIT.
11 documents required · 11 mandatory
₹7,555
23 Mar 2026
19 Feb 2026
3 Mar 2026
19 Feb 2026
2 Mar 2026
19 Feb 2026
Dismantling, Transportation, maintenance of 60lbs, 50lbs ,laying fitting 50lbs track line at in XVI(T ) verious places Moonidih Colliery, W J Area
Dismantling of 60 lbs trackline(60m)from 0 level to E8 Bottom gate. Analysis: for 20m dismantling 6 unskilled manpower required. Cost/m = (6 x 1402.60)/20m = 420.78/m
transportation of dismantled trackline(70m) from E8 B/G to E9 T/G in 500mHz. loading of trackline transportation theseof and unloading the same. Analysis 6 unskilled man shift required for loading, unloading band transportation.total no. of rail= (70/5)x2 =28 nos.rail/ track. 10 rails/trolley therfore total nos. of trolley=2.8 say 3 trolley. cost /trolley = ( 6 x 1402.6)/ trolley = Rs 8415.6/ trolley
manually transportation and stacking thereof(60m). Therefore total nos. of rails=(60/5)x 2=24nos of rail. Analysis 6 unskilled manshift is required for transport 12 rail cost/ rail= (6x 1402.6)/12= Rs 701.3/rail
transportation of dismantled 2 nos. of crossing from E8 B/G to Rok. Analysis for transportation of one crossing 8 unskilled manpower required. Cost/ crossing = (8x1402.60)/1=11220.8/crossing.
trackline cleaning for shifting of trackline in 400 mHz,200m length X 1.9x0.15=57m3³ Aanalysis for 4m³ cleaning 3 manpower required. Cost/m³ = (3x 1402.60)/4= 1051.95/m³
sleepers transportation(100nos.) from surface to the destined place. For 50 sleeper transport 1 mine car required. Analysis: one mine car accommodate 100 Sleeper. Total mine car required =100/50= 2 mine car. 8 Man-shift required for loading , lowering, transportation and unloading of 4 mine car. Cost involve for loading one mine car= (8x1402.60)/4 =Rs.2805.2/mine car
trackline transportation 20m (20/5)x2 =8 nos from 3A dipto destined place for trackline change Analysis 6unskilled manshift required from transport 8 numbers of track line ( (6 x 1402.60)/8 = 1051.95/ track
dismantling of 20m wored up trackline analysis for dismantling 20m, 6 unskilled is required cost /m = (6x1402.60)/20= Rs 420.78/m
maintenance of trackline( checking wooden sleepers, nails , replacing damage wooden sleeper, cleaning, laying and fitting etc )800m of 50lbs from Y connection 400MH to level drift. Analysis for 40m (both track) of , 6 unskilled is required . Cost/m = (6x 1402.6)/ 50= Rs 168.31/m
packing of replaced and shifted trackline, riseing the track line etc 800m. Analysis 6 unskilled manshift is required for packing 40m. Cost/m = (6x1402.60)/40= Rs 210.29/m
maintenance of 250m, 30 lbs trackline of LHD4 section ( damag sleeper change, packing, ) analysis : for maintenance 50m (both) track line, 6 unskilled is required. Cost/m= ( 6x 1402.60) /50= Rs 168.31/m
making of curve. For making 3 curve 6 man shift required. curves 30lb analysis 6 unskilled manshift is required for making 3nos curves. Cost/curve= (1402.6x6)/3=Rs 2805.2/curve
Add CP 15% as per clause 4.17.1 of Civil Eng. Manual & BCCL SOR
CMPF, Pension and admin. Charge of Employee Un Skilled
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.63 MB
BOQ_366488.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid