| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.5 LAccepted-AOC BAZAR LINE TATO VILLAGE P O P S TATO DISTRICT SHI YOMI ARUNACHAL PRADESH 791003 | TATO | SHI YOMI | ARUNACHAL PRADESH | 791003 | ₹10.5 L | L1 | Accepted-AOC Being L1 Bidder |
| 2 | L2₹11.0 LRejected-Finance MECHUKHA P O P S MECHUKHA DISTRICT SHI YOMI ARUNACHAL PRADESH 791003 | MECHUKHA | SHI YOMI | ARUNACHAL PRADESH | 791003 | ₹11.0 L | L2 | Rejected-Finance Being L2 bidder |
| 3 | L3₹11.2 LRejected-Finance | ₹11.2 L | L3 | Rejected-Finance Being L3 bidder |
| Sl No | Description | Qty | Unit | SUNRISE ENTERPRISE L1 | AANA ENTERPRISE L2 | YORDUNG TRADING CENTRE L3 |
|---|---|---|---|---|---|---|
| 0.00Items | ||||||
| 1.00 | Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m. | 2.22 | Cum | 447 ₹992.34 | 467 ₹1,036.74 | 500 ₹1,110 |
| 2.00 | Dry rubble Flooring / Stone Soling. | 0.42 | Cum | 3,375 ₹1,431 | 3,531 ₹1,497.14 | 3,390 ₹1,437.36 |
| 3.00 | Providing and laying cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) excluding the cost of centring and shuttering in:a) Foundations and plinth | 0.32 | Cum | 7,179 ₹2,326 | 7,512 ₹2,433.89 | 7,190 ₹2,329.56 |
| 4.00 | Reinforcement of RCC work including bending, binding and placing in position complete. b) Tar/TMT steel | 60.68 | Kg | 118 ₹7,160.24 | 123 ₹7,463.64 | 130 ₹7,888.40 |
| 5.00 | Centring and shuttering including strutting, propping etc and removal of form work for; b) Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | 18.75 | Sqm. | 725 ₹13,593.75 | 758 ₹14,212.50 | 730 ₹13,687.50 |
| 6.00 | Centring and shuttering including strutting, propping etc and removal of form work for; c) Suspended floors, roofs, landings shelves and their supports, balconies and chajjas (3.5 m height). | 2.25 | Sqm. | 1,119 ₹2,517.75 | 1,171 ₹2,634.75 | 1,135 ₹2,553.75 |
| 7.00 | Reinforced cement concrete in retaining wall (any thickness) including attached pillasters, buttresses, plinth and string courses, fillets etc from top of foundation up to floor two level excluding cost of centring,shuttering and reinforcement in : a) M20 (1 cement : 1.5 Coarse Sand : 3 stone aggregate 20 mm nominal size). | 3.11 | Cum | 9,661 ₹30,055.37 | 10,109 ₹31,449.10 | 9,675 ₹30,098.93 |
| 8.00 | Reinforced cement concrete in suspended floors, roofs, landings and balconies upto floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but excluding cost of centring and shuttering and reinforcement with M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size). | 0.28 | Cum | 11,378 ₹3,197.22 | 11,905 ₹3,345.31 | 11,390 ₹3,200.59 |
| 9.00 | Providing and fixing normal gauge HD polythene pipes of approved quality complete with appropriate fittings including including trenching and refilling etc (external work). | 2,500 | Mtr | 354 ₹8.8 L | 371 ₹9.3 L | 380 ₹9.5 L |
Tender Value
₹9.7 L
EMD Value
₹19,370
Closing Date
16 Mar 2026, 2:00 pmClosed
DGM Tech CNP Wing Office of the HOP
Office of the HOP Tato-I II and Heo HEP AP
Construction of a Temporary Water Collection Tank along with Laying of 40 mm diameter HD Polyethylene Pipe from the School Campus of Govt. Secondary School Tato to NEEPCO Colony Tato
2026_NEEPC_269241_1
NEEPCO/HOP/TTH/2025-26/ 09 Dated 01.03.2026
Limited
Civil Works
60 days
TATO-II HEP Tato Arunachal Pradesh
As per NIB
2 documents required · 2 mandatory
₹0
₹19,370
3 Apr 2026
2 Mar 2026
17 Mar 2026
2 Mar 2026
16 Mar 2026
2 Mar 2026
2 Mar 2026 - 9 Mar 2026
Items
Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m.
Dry rubble Flooring / Stone Soling.
Providing and laying cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) excluding the cost of centring and shuttering in:a) Foundations and plinth
Reinforcement of RCC work including bending, binding and placing in position complete. b) Tar/TMT steel
Centring and shuttering including strutting, propping etc and removal of form work for; b) Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
Centring and shuttering including strutting, propping etc and removal of form work for; c) Suspended floors, roofs, landings shelves and their supports, balconies and chajjas (3.5 m height).
Reinforced cement concrete in retaining wall (any thickness) including attached pillasters, buttresses, plinth and string courses, fillets etc from top of foundation up to floor two level excluding cost of centring,shuttering and reinforcement in : a) M20 (1 cement : 1.5 Coarse Sand : 3 stone aggregate 20 mm nominal size).
Reinforced cement concrete in suspended floors, roofs, landings and balconies upto floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but excluding cost of centring and shuttering and reinforcement with M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size).
Providing and fixing normal gauge HD polythene pipes of approved quality complete with appropriate fittings including including trenching and refilling etc (external work).
12 mm cement plaster 1 : 3 (1 cement : 3 fine sand).
Neat cement punning.
Providing and laying cement concrete 1 : 2 : 4 (1 cement : 2 coarse sand : 4 stone aggregate 20 mm nominal size) excluding the cost of centring and shuttering in :a) Foundations and plinth
Steel work riveted or bolted in built up sections, trusses and framed work including cutting, hoisting, fixing in position and applying a priming coat of red lead paint.b) In Tees, Angles, Flats and Channels
Welding by Electric plant
Loading and Unloading of Stone Boulder / Stone aggregates / Sand / Kanker/Moorum / Lime / Shingle /Surki/ Earth / Excavated Rock and Kerb Stone for hill roads . Placing tipper at loading point, loading with front end loader, dumping, turning for return trip, excluding time for haulage and return trip.
Loading and Unloading of Cement / Steel / Structural Steel / RC Pipe / Wooden Logs / Bricks / Bitumen and Timber etc, by Manual Means and Stacking for hill roads.
Cost of Haulage Excluding Loading and Unloading on hill roads . Haulage of materials by tipper excluding cost of loading, unloading and stacking.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_313513.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.62 MB
Bid_document.pdf
Tender Documents • 3.73 MB
BOQ_313513.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid