MODIFICATION/UP-GRADATION OF 30TPD POWDER PLANT INSTALLED AT VERKA LUDHIANA DAIRY (INCLUDING DESIGN, SUPPLY, INSTALLATION, TESTING, COMMISSIONING ANDINTEGRATION WITH EXITING SETUP COMPLETE IN ALL RESPECTS)
2021_Coop_66807_1
0170
Open Tender
Machineries/ Mechanical Engg Items
365 days
Ludhiana
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
₹20 L
17 Sept 2021
11 Jun 2021
30 Jul 2021
11 Jun 2021
29 Jul 2021
11 Jun 2021
DSITC Pre heaters
DSITC HIGH HEATERS
PUMP SEAL WATER RECIRCULATION SYSTEM
CONDENSATE RECOVERY SYSTEM
Automation of complete plant complete including field instruments and other allied accessories
Electtrical system and panels complete in all respects including switchgears, panels , cable tray etc.
Homogenizer cum pressure pump along with accessories
DSITC conversion of existing setup into dual drying nozzle / Rotary setup including necessary modifications in drying chamber
DSITC nozzle atomizer setup ( Complete )
DSITC rotary atomizer
DSITC stack loss recovery Setup including allied accessories as per requirment of 30 TPD Plant
DSITC Fire Existinguishing setup
Powder conveying and 25 kg bag packing setup
DSITC semi Automatic powder packing in tin
REFURBISHMENT OF Drying CHAMBER
DSITC SAFETY DOORS for Drying CHAMBER
DSITC DOORS AND MANHOLES
DSITC Holding Coil for evaporator
Repair/Refurbishment of Fluidized Bed Drier
DSITC LIFT IN POWDER PLANT
DSITC LIFT IN Drying CHAMBER
Instrumention and Control ( Calibration of all existing field instruments/ replacement of faulty ones )
Repair of MVR frame/foundation including civil works
DSITC Exhaust Fan as per plant requirements
DSITC of Wet Cleaning System
VFD for Powder Plant
VFDs on Vibro Fludized Bed
Clean Air Room for supply of air to entire plant
Complete Overhauling of Milk Pumps
DSITC of vacuum pumps
DSITC of hot and cold air blowers for vibro fluidzer
Lightening of Powder PLant
Pipes, Valves and fittings SS 304, MS , GI including necessary insulation on hot, chilled and product lines, wherever suitable as per standard industry norms
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid