| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.4 LAccepted-AOC | ₹15.4 L | L1 | Accepted-AOC Being the lowest |
| 2 | L2₹15.8 L+₹38,530 (2.50%)Rejected-Finance | ₹15.8 L+₹38,530 (2.50%) | L2 | Rejected-Finance L2 |
| 3 | L3₹15.9 L+₹50,897 (3.30%)Rejected-Finance | ₹15.9 L+₹50,897 (3.30%) | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | SHAJI FRANCIS L1 | M M SULAIMAN L3 | K.J Thomas L2 |
|---|---|---|---|---|---|---|
| 1.00Civil works | ||||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 7.18 | cum | 323.38 ₹2,322.52 Lowest | 340 ₹2,441.88 | 337.5 ₹2,423.9 |
| 1.02 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 6,000 | sqm | 16.35 ₹98,100 Lowest | 17 ₹1,02,000 | 17.07 ₹1,02,396 |
| 1.03 | Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete | 8 | each | 607.79 ₹4,862.32 Lowest | 640 ₹5,120 | 634.22 ₹5,073.74 |
| 1.04 | Cutting branches of trees overhanging above any structures of girth beyond 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 5 | each | 1,118.12 ₹5,590.6 Lowest | 1,150 ₹5,750 | 1,166.9 ₹5,834.51 |
| 1.05 | DOWEL BARS - Supplying and providing MS dowel bars of size 16 mm dia of 0.60 m long (30 cm in rock and 30cm in concrete ) including drilling holes of 20mm dia to a depth of 0.30m in rock and filling the gap with cement grout( 0.075kg/each) etc complete. | 120 | each | 201.16 ₹24,139.2 Lowest | 210 ₹25,200 | 209.95 ₹25,193.4 |
| 1.06 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 7.18 | cum | 8,303.13 ₹59,633.08 Lowest | 8,700 ₹62,483.4 | 8,665.37 ₹62,234.7 |
| 1.07 | Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers
etc. complete | 2,301.23 | Kg | 219 ₹5,03,970.03 | 210 ₹4,83,258.93 Lowest | 216.66 ₹4,98,592.05 |
| 1.08 | Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 268.37 | Kg | 160.39 ₹43,044.03 | 160 ₹42,939.36 Lowest | 167.4 ₹44,924.5 |
| 1.09 | Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work | 127.68 | sqm | 227.4 ₹29,034.43 Lowest | 240 ₹30,643.2 | 237.32 ₹30,301.4 |
Tender Value
₹16.8 L
EMD Value
₹42,063
Closing Date
21 Jul 2026, 6:00 pmClosed
Divisional Forest Officer Kottayam
Office of the Divisional Forest Officer 2nd floor civil station Kottayam
Construction of Physical barriers for mitigating man animal conflict by Installation of Hanging solar fencing
2026_FD_860349_1
C2-41755/2025
Open Tender
Agricultural or Forestry
Item Rate
90 days
Ayyappancovil Range
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,950
Yes
₹42,063
Yes
11 Aug 2026
13 Jul 2026
23 Jul 2026
13 Jul 2026
21 Jul 2026
13 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Civil works | |||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | - | cum | 359.72 | - |
| 1.02 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | - | sqm | 18.19 | - |
| 1.03 | Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete | - | each | 675.98 | - |
| 1.04 | Cutting branches of trees overhanging above any structures of girth beyond 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | - | each | 1,243.74 | - |
| 1.05 | DOWEL BARS - Supplying and providing MS dowel bars of size 16 mm dia of 0.60 m long (30 cm in rock and 30cm in concrete ) including drilling holes of 20mm dia to a depth of 0.30m in rock and filling the gap with cement grout( 0.075kg/each) etc complete. | - | each | 223.77 | - |
| 1.06 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | 9,235.97 | - |
| 1.07 | Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers
etc. complete | 0.2 | Kg | 230.93 | ₹46.19 |
| 1.08 | Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 0.4 | Kg | 178.42 | ₹71.19 |
| 1.09 | Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work | - | sqm | 252.95 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1454864.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.43 MB
Tendernotice_2.pdf
PDF • 0.25 MB
Preliminaryagreement.pdf
Tender Documents • 0.26 MB
Tenderforms.pdf
Tender Documents • 0.53 MB
Affidabit.pdf
Tender Documents • 0.17 MB
BOQ_1454864.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .