Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹46.6 LAdmitted-Finance | ₹46.6 L | L1 | Admitted-Finance |
| 2 | L2₹47.2 L+₹57,032 (1.22%)Admitted-Finance | ₹47.2 L+₹57,032 (1.22%) | L2 | Admitted-Finance |
| 3 | L3₹47.5 L+₹87,103 (1.87%)Admitted-Finance | ₹47.5 L+₹87,103 (1.87%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | N AND M ENTERPRISES L3 | Arun Associates L2 | Moradabad Construction and Electrification L1 |
|---|---|---|---|---|---|---|
| 1.00Repairing Work of 11/0.4 KV 100 KVA Transformer. | ||||||
| 2.00 | New copper coil. | 1 | Per KG | 1,420 ₹1,420 | 1,400 ₹1,400 | 1,370 ₹1,370 Lowest |
| 3.00 | Return old copper coil. | 1 | Per KG | 580 ₹580 | 560 ₹560 | 540 ₹540 Lowest |
| 4.00 | Oil dehydration Work of transformer. | 1 | Per Job | 4,850 ₹4,850 | 4,830 ₹4,830 | 4,825 ₹4,825 Lowest |
| 5.00 | Providing and filling of transformer oil. | 1 | Per Ltr. | 210 ₹210 | 200 ₹200 | 195 ₹195 Lowest |
| 6.00 | Providing and replacement of damaged LT bushing. | 1 | Each | 170 ₹170 | 160 ₹160 | 155 ₹155 Lowest |
| 7.00 | Providing and replacement of damaged HT bushing. | 1 | Each | 750 ₹750 | 740 ₹740 | 730 ₹730 Lowest |
| 8.00Repairing work of oil tank. | ||||||
| 9.00 | Oil tank will repair at Site (in case miner Leakage). | 1 | Per Job | 2,100 ₹2,100 | 2,000 ₹2,000 | 1,950 ₹1,950 Lowest |
| 10.00 | Oil tank will repair in workshop (in case major Leakage). | 1 | Per Job | 5,500 ₹5,500 | 5,000 ₹5,000 | 4,800 ₹4,800 Lowest |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
28 Mar 2026, 5:00 pmClosed
CMS
CMS DISTRIC HOSPITAL MORADABAD
Supply and installation and Repairing work of H.T Transformers rating 250-630 KVA installed in 11/0.4 KV and 33/0.4 KV sub-station at district male/female Hospital at District Moradabad.
2026_DGMH_1125299_1
CMS/PARI.-MAIN/TENDER/25-26 /1923
Open Tender
Repair and Maintenance Services
Item Rate
90 days
MORADABAD
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
CMS DISTRIC HOSPITAL MORADABAD
₹20,000
30 Mar 2026
14 Mar 2026
30 Mar 2026
14 Mar 2026
28 Mar 2026
14 Mar 2026
Repairing Work of 11/0.4 KV 100 KVA Transformer.
New copper coil.
Return old copper coil.
Oil dehydration Work of transformer.
Providing and filling of transformer oil.
Providing and replacement of damaged LT bushing.
Providing and replacement of damaged HT bushing.
Repairing work of oil tank.
Oil tank will repair at Site (in case miner Leakage).
Oil tank will repair in workshop (in case major Leakage).
Replacement of new oil tank.
Providing and filling of 250 gm silika gel box.
Providing and filling of 500 gm silika gel box.
Providing and filling of 1000 gm silika gel box.
Replacement of new radiator.
Replacement of new tape changer.
Replacement of damaged M.S or C.I LT box.
Replacement of damaged analogue temperature gauge size-200 mm.
Replacement of damaged temperature probe.
Transportation From site to Contractor Workshop. (including Loading/Unloading ,Before and After Repairing
Repairing Work of 250 KVA/ 11/0.4 KV Transformer.
New copper coil.
Return old copper coil.
Oil dehydration Work of transformer.
Providing and filling of transformer oil.
Providing and replacement of damaged LT bushing.
Providing and replacement of damaged HT bushing.
Repairing work of oil tank.
Oil tank will repair at Site (in case miner Leakage).
Oil tank will repair in workshop (in case major Leakage).
Replacement of new oil tank.
Providing and filling of 250 gm silika gel box.
Providing and filling of 500 gm silika gel box.
Providing and filling of 1000 gm silika gel box.
Replacement of new radiator.
Replacement of new tape changer.
Replacement of damaged M.S or C.I LT box.
Replacement of damaged analogue temperature gauge size-200 mm.
Replacement of damaged temperature probe.
Transportation From site to Contractor Workshop. (including Loading/Unloading ,Before and After Repairing
Repairing Work of 400 KVA/ 11/0.4 KV Transformer.
New copper coil.
Return old copper coil.
Oil dehydration Work of transformer.
Providing and filling of transformer oil.
Providing and replacement of damaged LT bushing.
Providing and replacement of damaged HT bushing.
Repairing work of oil tank.
Oil tank will repair at Site (in case miner Leakage).
Oil tank will repair in workshop (in case major Leakage).
Replacement of new oil tank.
Providing and filling of 250 gm silika gel box.
Providing and filling of 500 gm silika gel box.
Providing and filling of 1000 gm silika gel box.
Replacement of new radiator.
Replacement of new tape changer.
Replacement of damaged M.S or C.I LT box.
Replacement of damaged analogue temperature gauge size-200 mm.
Replacement of damaged temperature probe.
Transportation From site to Contractor Workshop. (including Loading/Unloading ,Before and After Repairing
Repairing Work of 630 KVA/ 11/0.4 KV Transformer.
New copper coil.
Return old copper coil.
Oil dehydration Work of transformer.
Providing and filling of transformer oil.
Providing and replacement of damaged LT bushing.
Providing and replacement of damaged HT bushing.
Repairing work of oil tank.
Oil tank will repair at Site (in case miner Leakage).
Oil tank will repair in workshop (in case major Leakage).
Replacement of new oil tank.
Providing and filling of 250 gm silika gel box.
Providing and filling of 500 gm silika gel box.
Providing and filling of 1000 gm silika gel box.
Replacement of new radiator.
Replacement of new tape changer.
Replacement of damaged M.S or C.I LT box.
Replacement of damaged analogue temperature gauge size-200 mm.
Replacement of damaged temperature probe.
Transportation From site to Contractor Workshop. (including Loading/Unloading ,Before and After Repairing
Repairing Work of 250 KVA/ 33/0.4 KV Transformer.
New copper coil.
Return old copper coil.
Oil dehydration Work of transformer.
Providing and filling of transformer oil.
Providing and replacement of damaged LT bushing.
Providing and replacement of damaged HT bushing.
Repairing work of oil tank.
Oil tank will repair at Site (in case miner Leakage).
Oil tank will repair in workshop (in case major Leakage).
Replacement of new oil tank.
Providing and filling of 250 gm silika gel box.
Providing and filling of 500 gm silika gel box.
Providing and filling of 1000 gm silika gel box.
Replacement of new radiator.
Replacement of new tape changer.
Replacement of damaged M.S or C.I LT box.
Replacement of damaged analogue temperature gauge size-200 mm.
Replacement of damaged temperature probe.
Transportation From site to Contractor Workshop. (including Loading/Unloading ,Before and After Repairing
Repairing Work of 400 KVA/ 33/0.4 KV Transformer
New copper coil.
Return old copper coil.
Oil dehydration Work of transformer.
Providing and filling of transformer oil.
providing and replacement of damaged LT bushing.
providing and replacement of damaged HT bushing.
Repairing work of oil tank.
Oil tank will repair at Site (in case miner Leakage).
Oil tank will repair in workshop (in case major Leakage).
Replacement of new oil tank.
Providing and filling of 250 gm silika gel box.
Providing and filling of 500 gm silika gel box.
Providing and filling of 1000 gm silika gel box.
Replacement of new radiator.
Replacement of new tape changer.
Replacement of damaged M.S or C.I LT box.
Replacement of damaged analogue temperature gauge size-200 mm.
Replacement of damaged temperature probe.
Transportation From site to Contractor Workshop. (including Loading/Unloading ,Before and After Repairing for Each Unit of Hospitals in Moradabad Division)
Repairing Work of 630 KVA/ 33/0.4 KV Transformer
New copper coil.
Return old copper coil.
Oil dehydration Work of transformer.
Providing and filling of transformer oil.
providing and replacement of damaged LT bushing.
providing and replacement of damaged HT bushing.
Repairing work of oil tank.
Oil tank will repair at Site (in case miner Leakage).
Oil tank will repair in workshop (in case major Leakage).
Replacement of new oil tank.
Providing and filling of 250 gm silika gel box.
Providing and filling of 500 gm silika gel box.
Providing and filling of 1000 gm silika gel box.
Replacement of new radiator.
Replacement of new tape changer.
Replacement of damaged M.S or C.I LT box.
Replacement of damaged analogue temperature gauge size-200 mm.
Replacement of damaged temperature probe.
Transportation From site to Contractor Workshop. (including Loading/Unloading ,Before and After Repairing for Each Unit of Hospitals in Moradabad Division)
Providing & Fixing of New Transformers, Servos & VCB.
Supply of new 250 KVA / 33/0.4 KV AS PER I.S.-1180 PART II , 2014 WITH ALL STANDERD ACCESSORIES
Installation of New Transformer including loading, unloading separate earthing of Nutrel and body (03 No.) and HT/LT side Connection extra etc.
Supply of new 400 KVA / 33/0.4 KV AS PER I.S.-1180 PART II , 2014 WITH ALL STANDERD ACCESSORIES
Installation of New Transformer including loading, unloading separate earthing of Nutrel and body (03 No.) and HT/LT side Connection extra etc.
Supply of new 630 KVA / 33/0.4 KV AS PER I.S.-1180 PART II , 2014 WITH ALL STANDERD ACCESSORIES
Installation of New Transformer including loading, unloading separate earthing of Nutrel and body (03 No.) and HT/LT side Connection extra etc.
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.41 MB
BOQ_2097659.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .