Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹35,600.47Accepted-AOC VILL P O KULPI P S SAGAR DIST SOUTH 24 PARGANAS PIN 743351 | KULPI | SOUTH 24 PARGANAS | WEST BENGAL | 743351 | ₹35,600.47 | 1 | Accepted-AOC ok |
| 2 | 2₹36,384Rejected-Finance VILL PURATON BAZAR WARD NO 14 PO PS DIAMOND HARBOUR DIST SOUTH 24 PGS PIN 743331 | DIAMOND HARBOUR | SOUTH 24 PARGANAS | WEST BENGAL | 743331 | ₹36,384 | 2 | Rejected-Finance Decision taken as per T.C |
| 3 | 3₹39,689Rejected-Finance | ₹39,689 | 3 | Rejected-Finance Decision taken as per T.C |
| Sl No | Description | Qty | Unit | M/S BANIK ENTERPRISE L1 | FANCY DECORATOR L2 | M/S SRI KRISHNA DECORATOR L3 |
|---|---|---|---|---|---|---|
| 1.00 | Hire and labour charges for erecting temporary shed covered with waterproof tarpaulin over roof with strong bamboo/sal bullah frame resting on strong salbullah posts as per direction including maintenance as required (upto 10'0" min. ht.) roof should be projected upto 2'0" from all walling. (Payment will be made as per floor area). | 1 | Sqft | 26.7 ₹26.70 | 27 ₹27 | 27 ₹27 |
| 2.00 | Hire and labour charges for erecting temporary shed covered with waterproof tarpaulin over roof with strong bamboo/salbullah frame resting on strong salbullah posts including walling with water proof tarpaulin as per requirement and direction including maintenance as required (upto 10'0" min. ht.) Roof should be projected upto 2'0" from all walling. (Payment will be made as per floor area) | 1 | Sqft | 35 ₹35 | 36 ₹36 | 36 ₹36 |
| 3.00 | Hire and labour charges for erecting temporary shed covered with G.C.I. Tin roofing over strong salbullahpost and bamboo framing including fitting complete and walling with water proof tarpaulin (upto 10'0" ht. Min.) as per direction. Roof should be projected upto 2'0" from all walling (Payment will be made as per floor area). | 1 | Sqft | 38.16 ₹38.16 | 40 ₹40 | 40 ₹40 |
| 4.00 | Hire and labour charges for erecting temporary shed covered with G.C.I. Tin roofing over strong salbullahpost and bamboo framing as per direction. Roof should be projected upto 2'0" from all walling (Payment will be made as per floor area). | 1 | Sqft | 40.06 ₹40.06 | 42 ₹42 | 42 ₹42 |
| 5.00 | Hire and labour charges for erecting temporary shed covered with G.C.I. Tin roofing and walling with strong bamboo salbullah frame resting on strong salbullah as per requirement and direction including maintenance as required (upto 10'0" min. ht.) roof should be projected upto 2'0" from all walling. (Payment will be made as per floor area). | 1 | Sqft | 38.88 ₹38.88 | 40 ₹40 | 40 ₹40 |
| 6.00 | Walling with water proof tarpaulin/hessian with bamboo/sal framing and post complete. | 1 | Sqft | 13.35 ₹13.35 | 15 ₹15 | 15 ₹15 |
| 7.00 | Walling with water proof tarpaulin/hessian without bamboo/sal framing and post complete. | 1 | Sqft | 10.5 ₹10.50 | 12 ₹12 | 12 ₹12 |
| 8.00 | Inside walling and ceiling with clean white or colour washed cloth with bamboo/ sal framing and post complete (Restricted item). | 1 | Sqft | 11.44 ₹11.44 | 12 ₹12 | 12 ₹12 |
| 9.00 | Inside walling and ceiling with clean white or colour washed cloth without bamboo/ sal framing and post complete (Restricted item). | 1 | Sqft | 11 ₹11 | 11 ₹11 | 11 ₹11 |
| 10.00 | Walling with clean G.C.I. Sheets with bamboo/sal frame and post complete as per direction (8'0" to 10'0" ht.). | 1 | Rft | 44 ₹44 | 45 ₹45 | 45 ₹45 |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
2 Apr 2026, 5:00 pmClosed
Executive Officer
Office of the Executive Officer Kulpi P.S
Temporary Structure for DCCC For AGE 2026
2026_ZPHD_1023365_1
NIT-168/KLPS/AGE/2025-2026
Open Tender
CIVIL WORKS
90 days
Kamarchak G.P
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,000
₹5,000
Yes
29 May 2026
24 Mar 2026
4 Apr 2026
24 Mar 2026
2 Apr 2026
24 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Hire and labour charges for erecting temporary shed covered with waterproof tarpaulin over roof with strong bamboo/sal bullah frame resting on strong salbullah posts as per direction including maintenance as required (upto 10'0" min. ht.) roof should be projected upto 2'0" from all walling. (Payment will be made as per floor area). | |||||
| 2Hire and labour charges for erecting temporary shed covered with waterproof tarpaulin over roof with strong bamboo/salbullah frame resting on strong salbullah posts including walling with water proof tarpaulin as per requirement and direction including maintenance as required (upto 10'0" min. ht.) Roof should be projected upto 2'0" from all walling. (Payment will be made as per floor area) | |||||
| 3Hire and labour charges for erecting temporary shed covered with G.C.I. Tin roofing over strong salbullahpost and bamboo framing including fitting complete and walling with water proof tarpaulin (upto 10'0" ht. Min.) as per direction. Roof should be projected upto 2'0" from all walling (Payment will be made as per floor area). | |||||
| 4Hire and labour charges for erecting temporary shed covered with G.C.I. Tin roofing over strong salbullahpost and bamboo framing as per direction. Roof should be projected upto 2'0" from all walling (Payment will be made as per floor area). | |||||
| 5Hire and labour charges for erecting temporary shed covered with G.C.I. Tin roofing and walling with strong bamboo salbullah frame resting on strong salbullah as per requirement and direction including maintenance as required (upto 10'0" min. ht.) roof should be projected upto 2'0" from all walling. (Payment will be made as per floor area). | |||||
| 6Walling with water proof tarpaulin/hessian with bamboo/sal framing and post complete. | |||||
| 7Walling with water proof tarpaulin/hessian without bamboo/sal framing and post complete. | |||||
| 8Inside walling and ceiling with clean white or colour washed cloth with bamboo/ sal framing and post complete (Restricted item). | |||||
| 9Inside walling and ceiling with clean white or colour washed cloth without bamboo/ sal framing and post complete (Restricted item). | |||||
| 10Walling with clean G.C.I. Sheets with bamboo/sal frame and post complete as per direction (8'0" to 10'0" ht.). | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.22 MB
BOQ_2515249.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid