Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹59.0 LAccepted-AOC 630 SAHUKARA BAREILLY UTTAR PRADESH | BAREILLY | BAREILLY | UTTAR PRADESH | L1 | Accepted-AOC Commitee approved rates as L1 | |
| 2 | L2₹64.2 L+₹5.2 L (8.88%)Rejected-AOC A 04 ADGNJ CHANDAN NAGAR OPP IOCL PETROL PUMP RAMPUR ROAD BAREILLY U P 243001 | BAREILLY | BAREILLY | UTTAR PRADESH | 243001 | L2 | Rejected-AOC L2 | |
| 3 | L3₹70.6 L+₹11.6 L (19.7%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹72.3 L+₹13.3 L (22.6%)Rejected-AOC 00 OPP RASHMI HOSPITAL RAYA ROAD LAXMI NAGAR MATHURA UTTAR PRADESH 281204 | MATHURA | UTTAR PRADESH | 281204 | L4 | Rejected-AOC L4 | |
| 5 | Not Admitted-Fee | - | Not Admitted-Fee EMD/Instrument is not valid |
Tender Value
₹66 L
EMD Value
₹66,000
Closing Date
11 Sept 2023, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE, EUDC,BAREILLY
35-B, Rampur Garden Bareilly.
For the work of replacement of damage cable lug, tail less unit etc for preventive maintenance of Distribution T/F in different areas of EUDD-II Bareilly under for system strengthening
2023_MVVNL_834256_1
T-78/EUDCB/2023-24
Open Tender
Electrical Works
Item Rate
60 days
EE, EUDD-II
as per tender documents
3 documents required · 3 mandatory
₹3,540
SE, EUDC
₹66,000
26 Jul 2024
2 Sept 2023
11 Sept 2023
2 Sept 2023
11 Sept 2023
2 Sept 2023
Amount
For the work of replacement of damage cable lug, tail less unit etc for preventive maintenance of Distribution T/F in different areas of EUDD-II Bareilly under for system strengthening for providing uninterrupted 24*7 power supply under the head of (B.P. 2023-2024)
LT CABLE SIZE 1X400 MM2
LT CABLE SIZE 1X630 MM2
LT CABLE SIZE 1X1000 MM2
LT CABLE SIZE 3.5X240 MM2
LT CABLE SIZE 3.5X400 MM2
MS CHANNEL 100X50 FOR MOUNTING OF TAIL LESS UNIT
Erection work
Fabrication and Erection of MS Channel 100X50 ( Total 3660 kgs.)for mounting of Tail less Unit for Distribution T/F .
Dismantling and removing of old and damaged LT Cable from transformer and fixing of New LT Cable size (1x400 MM2)
Dismantling and removing of old and damaged LT Cable from transformer and fixing of New LT Cable size (1x630 MM2)
Dismantling and removing of old and damaged LT Cable from transformer and fixing of New LT Cable size (1x1000 MM2)
Dismantling and removing of old and damaged LT Cable from transformer and fixing of New LT Cable size (3.5X240 MM2)
Dismantling and removing of old and damaged LT Cable from transformer and fixing of New LT Cable size (3.5X400 MM2)
Replacement of old damaged tail less unit & fixing new tail less unit(500 Amp) with material at M.s Channel frame along with providing and fixing fuse wire (10 SWG/12 SGW/14 SGW) .( All the material will be arranged by the contractor at his own cost ).
Replacement of old damaged tail less unit (800 Amp) with material. at M.s Channel frame along with providing and fixing fuse wire (10 SWG/12 SGW/14 SGW) .( All the material will be arranged by the contractor at his own cost )
Replacement of old damaged Copper L-Piece & fixing of new Copper L-Piece(62x225x12MM) with material.( All the material will be arranged by the contractor at his own cost )
Replacement of old and damaged Al Lugs and fixing new Al lugs suitable for 240 MM2 with material.( All the material will be arranged by the contractor at his own cost ).
Replacement of old damaged Al Lugs suitable for 400 MM2 with material. ( All the material will be arranged by the contractor at his own cost ).
Replacement of old damaged Al Lugs suitable for 630 MM2 with material .( All the material will be arranged by the contractor at his own cost ).
Replacement of old damaged Al Lugs suitable for 1000 MM2 with material. ( All the material will be arranged by the contractor at his own cost ).
For the work of one side of complete fencing of damaged side fencing of existing Distribution T/F .( All the material will be arranged by the contractor at his own cost )..
Repair of damaged plinth complete, by providing first class Bricks work as per RESPO norms. (Material will be supplied by Contractor).
Chemical earthing of t/f neutral including all materials (chemical, gi pipe, gi strip, nut bolt, etc)
BHARAT ELECTRICAL TRADERS
NATIONAL CONTRACTOR & GENERAL ORDER SUPPLIER
M/s Shubham Traders
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .