| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.9 LAccepted-AOC PARAVILA PUTHENVEEDU MUTTAKKAVU NEDUMPANA P O KOLLAM | KOLLAM | KERALA | 689694 | L1 | Accepted-AOC execute agreement | |
| 2 | L2₹38.4 L+₹1.4 L (3.89%)Rejected-AOC CHADAYAMANGALAM BLOCK PANCHAYATH CHADAYAMANGALAM KERALA | L2 | Rejected-AOC L1 execute agreement | |
| 3 | L3₹39.8 L+₹2.8 L (7.64%)Rejected-Finance | L3 | Rejected-Finance L1 L2 accepted.L3 rejected |
Tender Value
₹39.8 L
EMD Value
₹50,000
Closing Date
9 Feb 2024, 5:00 pmClosed
District Soil Conservation officer.Kollam
DISTRICT SOIL CONSERVATION OFFICE RAVI CHEMBERS, BEACH ROAD, NEAR BENZIGER HOSPITAL THAMARAKKULAM KOLLAM.691001.PH.0474 2768816
OUTLET CONCRETE WALL AND CONSTRUCTION OF POND
2024_DPK_653465_1
DSCO/KLM/23/2024-G
Open Tender
Civil Works - Others
Item Rate
180 days
Koonamkulam at Poothakkulam Grama Panchayath
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,500
Yes
₹50,000
Yes
21 Feb 2024
2 Feb 2024
13 Feb 2024
2 Feb 2024
9 Feb 2024
2 Feb 2024
Amount
OUTLET CONCRETE WALL NORTH SIDE
2.6.1. Earth work in excavation by mechanical means(Hydraulic excavator)/manual means over areas(exceeding 30cm in depth,1.5m in width as well as 10 sqm on plan) including disposal of excavated earth ,lead upto 50m and lift upto 1.5m ,disposed earth to be levelled and neatly dressed.All kinds of soil.
2.26.1. Extra for every additional lift 1.5m or part there of in excavation/ banking excavated or stacked materials.All kinds of soil.
OD151994/2022-2023. DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site.
5.9.1.Centering and shuttering including strutting,etc. and removal of form work for: Foundations, footings, bases of columns,etc for for mass concrete .
4.3.1.Centering and shuttering including strutting,propping etc. and removal of form work for: Foundations, footings, bases of columns .
4.1.6 Providing and laying in position cement concrete of specified grade excluding the cost of centering, shuttrering-All work upto plinth level : 1:3:6(1 cement:2 coarse sand:6 graded stone aggregate 40 mm nominal size)
5.9.2.Centering and shuttering including strutting,etc. and removal of form work for: Walls(any thickness), including attached pilasters,butteresses,plinth and string courses,etc.
5.22.6. Steel reinforcement for R. C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more
5.1.2 Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttrering,finishing and reinforcement-All work upto plinth level : 1:1.5:3(1 cement:1.5coarse sand:3 graded stone aggregate 20 mm nominal size)
50.2.3.1Pumping or Bailing out water and removing slush etc by using pump set including cost of labour,oil hire charges of pumpset,etc complete
CONSTRUCTION OF KOONAMKULAM
2.6.1. Earth work in excavation by mechanical means(Hydraulic excavator)/manual means over areas(exceeding 30cm in depth,1.5m in width as well as 10 sqm on plan) including disposal of excavated earth ,lead upto 50m and lift upto 1.5m ,disposed earth to be levelled and neatly dressed.All kinds of soil.
2.26.1. Extra for every additional lift 1.5m or part there of in excavation/ banking excavated or stacked materials.All kinds of soil.
OD151913/2022-2023. DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site.
5.9.1.Centering and shuttering including strutting,etc. and removal of form work for: Foundations, footings, bases of columns,etc for for mass concrete .
5.22.6. Steel reinforcement for R. C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more
5.1.2 Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttrering,finishing and reinforcement-All work upto plinth level : 1:1.5:3(1 cement:1.5coarse sand:3 graded stone aggregate 20 mm nominal size)
4.3.1.Centering and shuttering including strutting,propping etc. and removal of form work for: Foundations, footings, bases of columns .
4.1.2 Providing and laying in position cement concrete of specified grade excluding the cost of centering, shuttrering-All work upto plinth level : 1:1.1/2:3(1 cement:1 1/2 coarse sand:3graded stone aggregate 20 mm nominal size)
50.2.3.1Pumping or Bailing out water and removing slush etc by using pump set including cost of labour,oil hire charges of pumpset,etc complete
SHARAFUDEEN M
BAJAJRAM B
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1007160.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .