Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹55,343Admitted-Finance 55 BANDIPUR BANDIPUR BANDIPUR BEERUNI KATHI DARWAZA RAINAWARI BANDIPORA JAMMU KASHMIR 193502 | BANDIPORA | JAMMU AND KASHMIR | 193502 | L1 | Admitted-Finance | |
| 2 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-EMD submitted by the firm i.e. MS City Engineering Works is not as per the conditions specified in the tender document |
| Sl No | Description | Qty | Unit | Assad and Co L1 |
|---|---|---|---|---|
| 1.00 | Repairs to swing cylinders (02 no.) from boom of watermaster III by way of dismantling/disassembling of piston rod from the swing cylinder along with allied collar fittings. Shifting of swing cylinder with allied fittings from site Tumulla Ganderbal to workshop for repair. Removal of 04 number old bushes of SS from swing cylinder by way of hammering or by using gas cutter. Grinding off top portion of swing cylinder where cracks are found. After grinding, circumferential welding of both swing cylinders with high class MIG welding by a skilled technician using suitable steel wire electrode. After welding, removal of slag and then again welding circumferentially followed by finishing to make joint complete seal proof. The job also includes of providing/fitting of 04 nos. new SS bushes 50/55 x 40 (as per sample) to swing cylinders. Shifting back of swing cylinders from workshop to Ganderbal site and then refitting back of swing cylinder assembly to boom of watermaster classic III to its position along with all the attachments. The job further includes the testing of swing cylinders for leakage, etc. on full load for at least 2-3 hours.All tool & tackle like D.G Set, welding set, Gas cutter, Superior quality electrodes, etc shall be arranged by the firm during execution of work. | 1 | C. Job | 13,100 ₹13,100 Lowest |
| 2.00 | Repairs to front boom excavator of Watermaster classic III with involvement of highly skilled labours by way of:
Disconnecting of all incoming and outgoing hydraulic pressure lines from the hydraulic boom stick assembly after plugging the hydraulic system to prevent leakages from rubber hose/hydraulic attachments. The job involves dismantling of hydraulic boom arm assembly of watermaster classic III by using suitable / safe lift mechanism like JCB, Hydraulic Crane . The job includes the assessment of damage to arm cylinder assembly by removing the old worn-out bushes 02 No. and 01 No. pivot pin. The job then involves fabrication, providing, fitting of SS pivot pin 01 no of size (60 x 380) and bushing two no of size (60/70 x40) along with required locking arrangement as per sample after repairing the bushing housing with welding work or fitment of spacer etc and then assembling these components. The job also includes welding of locking arrangement of the pivot pin with Boom Stick assembly at site. Refitting back of hydraulic boom stick assembly with all the pressure lines and fitting the complete boom with bucket assembly of water master classic III and then testing it on full load. The job shall include any other minor repair / item required during completion of the repair work.
Note: All tools’ tackles, gas cutters, lubes, electricity, welding machine DG sets, lifting mechanism like Tripod etc. for the execution of this job shall be provided by the firm. | 1 | C. Job | 27,000 ₹27,000 Lowest |
| 3.00 | Providing and fitting of high tensile M14 x 100 Bolts with Nuts for water master classic-III with the help of skilled labours, other tools & tackles for the completion of work.. | 24 | No. | 98 ₹2,352 Lowest |
| 4.00 | Repairs to damaged pontoons of M.S at various leakage spots with the help welding process and using M.S plate of suitable size having thickness 6mm to cover circumferential & longitudinal area to make joint strong & leak proof. All tools & tackles like DG set, welding set, superior quality electrodes shall be arrange by firm during execution of work. | 1 | Job | 6,391 ₹6,391 Lowest |
| 5.00 | Repairs to Rake of water master classic-III by way of minor repairs at various damaged area with the help of welding work, skilled labours , superior quality electrodes for the completion of work. | 1 | Job | 2,000 ₹2,000 Lowest |
| 6.00 | Repairs to bucket joint of water master classic-III by way of fabrication, providing & replacement of damaged SS bushes two no with new one’s of size 50/55x25 with the help of skilled labours, tools & tackles for the completion of work | 1 | Job | 4,500 ₹4,500 Lowest |
Tender Value
₹67,032
EMD Value
₹2,000
Closing Date
5 Aug 2025, 6:00 pmClosed
Executive Engineer FMD Baramulla
Executive Engineer FMD Khawajabagh Baramulla
Urgent repairs to Watermaster Classic III of Flood Mechanical Division Baramulla deployed at Tulmulla Nallah Ganderbal
2025_IFC_282837_1
eNIT No. 24 of 2025-26
Open Tender
Machineries/ Mechanical Engg Items
Item Rate
10 days
Tulmulla Nallah
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2,000
Yes
9 Aug 2025
30 Jul 2025
6 Aug 2025
30 Jul 2025
5 Aug 2025
30 Jul 2025
Amount
Repairs to swing cylinders (02 no.) from boom of watermaster III by way of dismantling/disassembling of piston rod from the swing cylinder along with allied collar fittings. Shifting of swing cylinder with allied fittings from site Tumulla Ganderbal to workshop for repair. Removal of 04 number old bushes of SS from swing cylinder by way of hammering or by using gas cutter. Grinding off top portion of swing cylinder where cracks are found. After grinding, circumferential welding of both swing cylinders with high class MIG welding by a skilled technician using suitable steel wire electrode. After welding, removal of slag and then again welding circumferentially followed by finishing to make joint complete seal proof. The job also includes of providing/fitting of 04 nos. new SS bushes 50/55 x 40 (as per sample) to swing cylinders. Shifting back of swing cylinders from workshop to Ganderbal site and then refitting back of swing cylinder assembly to boom of watermaster classic III to its position along with all the attachments. The job further includes the testing of swing cylinders for leakage, etc. on full load for at least 2-3 hours.All tool & tackle like D.G Set, welding set, Gas cutter, Superior quality electrodes, etc shall be arranged by the firm during execution of work.
Repairs to front boom excavator of Watermaster classic III with involvement of highly skilled labours by way of: Disconnecting of all incoming and outgoing hydraulic pressure lines from the hydraulic boom stick assembly after plugging the hydraulic system to prevent leakages from rubber hose/hydraulic attachments. The job involves dismantling of hydraulic boom arm assembly of watermaster classic III by using suitable / safe lift mechanism like JCB, Hydraulic Crane . The job includes the assessment of damage to arm cylinder assembly by removing the old worn-out bushes 02 No. and 01 No. pivot pin. The job then involves fabrication, providing, fitting of SS pivot pin 01 no of size (60 x 380) and bushing two no of size (60/70 x40) along with required locking arrangement as per sample after repairing the bushing housing with welding work or fitment of spacer etc and then assembling these components. The job also includes welding of locking arrangement of the pivot pin with Boom Stick assembly at site. Refitting back of hydraulic boom stick assembly with all the pressure lines and fitting the complete boom with bucket assembly of water master classic III and then testing it on full load. The job shall include any other minor repair / item required during completion of the repair work. Note: All tools’ tackles, gas cutters, lubes, electricity, welding machine DG sets, lifting mechanism like Tripod etc. for the execution of this job shall be provided by the firm.
Providing and fitting of high tensile M14 x 100 Bolts with Nuts for water master classic-III with the help of skilled labours, other tools & tackles for the completion of work..
Repairs to damaged pontoons of M.S at various leakage spots with the help welding process and using M.S plate of suitable size having thickness 6mm to cover circumferential & longitudinal area to make joint strong & leak proof. All tools & tackles like DG set, welding set, superior quality electrodes shall be arrange by firm during execution of work.
Repairs to Rake of water master classic-III by way of minor repairs at various damaged area with the help of welding work, skilled labours , superior quality electrodes for the completion of work.
Repairs to bucket joint of water master classic-III by way of fabrication, providing & replacement of damaged SS bushes two no with new one’s of size 50/55x25 with the help of skilled labours, tools & tackles for the completion of work
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .