Tender Value
₹33.9 L
EMD Value
₹33,905
Closing Date
23 Jul 2026, 4:00 pm
Superintending Engineer, GETCO, Circle Office, Mehsana
Erection of structure, equipment, control wiring, yard Lighting, Control-Room & Staff-Quarter Electrification etc. at 66 KV Dediyasan GIDC Sub Station Ta: Mehsana, Dist: Mehsana
320409
MTC/062026/n-41
Open
Electrical Works
Mehsana
15 documents required · 0 mandatory · 15 optional
₹1,180
SE (TR), GETCO, CO, Mehsana
₹33,905
3 Jul 2026
3 Jul 2026
3 Jul 2026
23 Jul 2026
3 Jul 2026
3 Estimated cost including GST Rs.
4 Earnest Money Deposit amount Rs.
5 Appropriate Class E-1 or above class
6 Completion period from commencement of work 90Days
Last On-line Technical Bid/ Price-Bid submission Date
up to 16.00 hours only
7 Date of opening of on-line Technical Bid Dt.23.07.2026
8 Tentative Date of on-line Price bid opening (if possible) Shall be intimated separately
1. All the relevant documents including tender copy to be submitted though ONLINE only. No physical
documents to be submitted by bidder.
2. All the online Annexures to be filled properly and notarized/ self-attested copies of original
documents as per tender requirement must be submitted/attached through online form only. It shall
Seal & Signature of Bidder
be sole responsibility of the bidder that the uploaded scanned documents (in PDF form) remain
legible (readable) and should not be password protected.
3. Tender will be evaluated on Data/ Details/ Documents of the on-line submission. For any
discrepancy between online & Submitted documents, Online offer is considered as final. This is
intended for transparency and speedy evaluation of the bids. Instead of simply confirming / attached
in bid / refer physical offer, the Bidder shall fill in the particulars against appropriate place in respect
of each line appearing in each online annexure. Wherever required, bidder shall invariably have to
upload supporting authentic documents in the online bid. (In the absence of required details in the
online annexure, the purchaser has every right to evaluate the bids accordingly and bidder cannot
raise any objection against any point during evaluation.)
4. Bidder has to submit Tender Fee & EMD through online payment methods only. Copy of payment to
be attached with online bid documents.
5. Payment of Tender Fee & EMD (Earnest Money Deposit):
Payment option for submission of Tender fees & EMD should be Online i.e. by RTGS/NEFT only.
GETCO, Mehsana Beneficiary Bank detail for online payment are as under:
Sr. Particulars Requisite Details
1 Name of Bank Bank of Baroda
2 Name of Branch Mehsana Main
3 Branch Code MEHSAN
5 IFSC Code BARB0MEHSAN (5th Digit- Zero)
6 Name of Account Gujarat Energy Transmission Corporation Limited
8 GST No. 24AABCG4029R2ZC
After payment through RTGS/NEFT, Bidder has to provide following details by e-mail on the same
date of payment so payment receipt can be generated. Mail should on below mail addresses with
contains details:
Sr Required Details
.1 Name & Address of the bidder
2 Bidder GST No
3 Tender No with due date
4 Mode of Transfer
5 Ref. ID with Bank Details
7 Payment against (Tender Fee / EMD)
6. Bidders are requested to remain in touch with the web-site for any amendment / corrigendum or
extension of due date etc.
7. No tender shall be accepted / opened in case of receipt after due date and time of tender,
irrespective of delay due to postal services or any other reasons and the Corporation shall not
assume any responsibility for late receipt.
Seal & Signature of Bidder
8. The GETCO reserves the right to award the work to one or more bidders, considering their technical
and financial capacity OR to reject any or all tenders or accept any tender without assigning any
reason thereof.
Qualifying Requirements
1. Registration : Bidder shall be strictly a GETCO registered contractor of E-1 or above class
Technical Criteria:
Experience: Bidder shall have executed minimum 01no. of 66/11KV substation with
state or central Transmission Utility or major industries or 3nos. of 66KV bays i.e.
Transformer/Feeder bays at same or different locations. Substations include minimum
two nos. of feeder bays, one no. of transformer bay 2. The bidder shall have valid
Electrical Contract License and approved vendor of GETCO/ STU/ CTU, registered
under GST Act and should have CPF/ PF registration certificate Attested Xerox copy of
work orders executed from GETCO and satisfactory completion certificate from
respective department should be submitted.
Financial Criteria:
Bidder's Minimum Average Annual Turnover (MAAT)* for best three years out of last
five financial years as annualized shall not be less than the estimated amount of this
* Note- “Annual gross revenue from operations / gross operating income as
incorporated in the profit & loss account excluding other operative income/other
1. Last quarter’s Liquid Assets should not be less than 20 % of estimated amount as on
date of invitation of tender.
3. Note: For the purpose of arriving at LA Current Assets Less Inventories shall be
1. Bidder’s Net Worth for Last 3 financial years should be positive.
1. Audited, Verified and Certified Practicing Chartered Accountant certificate will be
considered for Minimum Average Annual Turnover, Liquid Assets and Net worth. The
provisional certificates will not be entertained.
2. Under taking in respect of reference to NCLT under Insolvency & Bankruptcy
Code. The undertaking is to be furnished by the bidder in its bid as per the format
attached and shall be deemed to be part of the bidding schedule and submitted along
Seal & Signature of Bidder
Additional Documents:
1. Payment of Tender fee and EMD online RTGS/NEFT only
2. Electrical Contractor License with latest validation.
3. 20% Solvency Certificate from Schedule Bank / Nationalized Bank not older than
4. Attested copy of PAN card
4. 5. GST registration certificate. (Provisional GST registration shall not be accepted).
6. Latest Registration Certificate of Provident Fund with last paid challan.
7. Details of Firm (Proprietorship/ Partnership/Ltd. – Sole Proprietor/ Partnership Deed-
POA/ AOA- MOA BR as per applicable
8. Financial Document of Last Three Years- IT return/ Balance Sheet/ P& L Statement.
9. Attested copy of All annexures attached with Technical Bid.
10. Attested copy of list of Tools/ Tackles available.
Any technical questions, information and clarifications that may be required pertaining to this enquiry
should be referred to:
Superintending Engineer
GETCO, CO, Mehsana.
To view the PDF file please use “Acrobat Reader” software which can be downloaded from “Adobe”
In case bidder needs any difficulty in accessing / submission of on line bid / clarification or if
training required for participating in online tender, they can contact the following office:
(n) Procure Cell, (n) code solutions-A division of GNFC Ltd.,
403, GNFC Info tower, S.G. Road,
Bodakdev Ahmedabad – 380054 (Gujarat)
Fax: 079-26857321 / 40007533, Email: [email protected]
Seal & Signature of Bidder
GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED
TRANSMISSION CIRCLE OFFICE
TENDER SPECIFICATION FOR
Erection of structure, equipment, control wiring, yard Lighting,
Control-Room & Staff-Quarter Electrification etc. at 66 KV Dediyasan
GIDC Sub Station Ta: Mehsana, Dist: Mehsana.
GENERAL TERMS & CONDITIONS WITH COMMERCIAL BID
TENDER NO. MTC/062026/n-41
Seal & Signature of Bidder
GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED
To create environment where Business Confidence is built through Best Business Practices and is
fostered in an atmosphere of trust and respect between providers of goods and services and their users
for the ultimate benefit of society the nation.
GETCO COMMITMENT PARTY’S COMMITMENT
• To maintain the highest ethical standards In • Not to bring pressure / recommendations
business and professional outside GETCO to influence its decision.
• Not to use intimidation, threat, inducement or
• Ensure maximum transparency to the
Pressure of any kind on GETCO or any of its
Satisfaction of stakeholders.
employees under any circumstances.
• To ensure to fulfill the terms of agreement /
• To be prompt and reasonable in fulfilling
contract and to consider objectively the
the contract, agreement, legal obligations.
viewpoint of parties.
• To provide goods and / or services timely as
• To ensure regular and timely release of
per agreed quality and specifications at
payment on due dates for work done.
minimum cost of GETCO.
• To ensure that no improper demand is made by • To abide by the general discipline to be
employees or by anyone on our behalf. maintained in our dealings.
• To give maximum possible assistance to all the
Vendors / Suppliers / Service provider and • To be true and honest in furnishing information
other to enable them to complete the contract in including payment to agents / sub-agent.
• To provide all information to suppliers/ • Not to divulge any information, business details
contractors relating to contract / Job which available during the course of business
facilitate him to complete the contract / job relationship to others without the written
successfully in time. consent of GETCO.
• To ensure minimum hurdles to Vendors/ • Not to enter into carter / syndicate /
suppliers / contractors in complete of understanding whether formal / non-formal so
agreement / contract / work order. as to influence the price.
Seal & Signature Seal & Signature
(GETCO Authorized Signatory) (Party’s Authorized Person)
Name: Designation:
Seal & Signature of Bidder
INSTRUCTIONS TO BIDDERS
A. INTRODUCTION
1.0 General Particulars
The G u j a r a t E n e r g y T r a n s m i s s i o n C o r p o r a t i o n L t d . , B a r o d a h e r e i n a f t e r
called ‘ OWNER’ or ‘GETCO’ i n t e n d s t o receive b i d s f or Erection of structure,
equipme nt, contr ol w iring, yard Li ghting, Control-Room & Staff-Q uarter
Electri fication etc. at 66 KV De di yas an GIDC Sub Station Ta: Mehsana, Dist:
Mehsana as detailed in the accompanying s p e c if i ca t io ns in accordance with Terms and
Conditions herein. The bids shall be prepared and furnished as per these Instructions.
2.0 Qualification Requirement-
1 As per mentioned in Tender Notice
The bidders must be attach certified/self-verified copy of all above documents on n-
procure only, no physical documents required. It shall be sole responsibility of bidder
that uploaded scanned documents in PDF form remain legible and should not be
password protected.
2.2 The above cited requirements are only indicative. The owner reserves the right to requisition
any other relevant information and also reserves the right to reject the Bid proposal of any
Bidder, if in the Owner’s opinion t h e Q ualif icat i on d a t a i s incomplete a n d Bidder is
not qualified to perform the Contract satisfactorily.
3.0 Bidding Costs
All costs/expenses in the preparation and submission of the Bid (including any post Bid
discussions/presentations) shall be fully borne by the Bidder. Owner will not be
responsible/ liable for these costs irrespective of the course and conclusion of this Bidding.
B. BID DOCUMENTS
4.0 Details of Documents
4.1 The following Bid documents apart from Invitation to Bid detail the material and equipment
specifications/characteristics, the bidding procedures and the terms & conditions of contract:
a. Instructions to Bidders (ITB-Part I)
b. General Conditions of Contract (GCC-Part I)
c. Erection Conditions of Contract (ECC-Part I)
d. Special Conditions of Contract (SCC-Part I)
e. Technical Specifications (TSP-Part IIA)
f. Technical Data Sheets (TDS-Part IIB)
5.0 Knowing the Bid Documents
5.1 Every intending Bidder is to examine and understand all instructions, forms, terms,
conditions and specifications in the Bid Documents and fully know himself all the conditions
and contents therein, which may in any manner, affect the scope & content of work and the
costs thereof. Submission of a Bid not substantially responsive to the Bid Document in all
respects and/or failure to furnish all information required by the Bid Document may entail
rejection of the Bid at the Bidder’s risk.
6.0 Clarifications on Bid Documents
6.1 In case an intending Bidder finds any discrepancy or omission in the documents and
Seal & Signature of Bidder
specifications or is in doubt as to the true meaning of any part, he shall make a request, in
writing not later than the date of pre Bid d i s c u s s i o n t o the owner in triplicate. The o wn e r
w i l l i s s u e e x p l a n a t i o n s , i n t e r p r e t a t i o n s and clarifications as deemed fit in writing
as a response to this request. On receipt of such interpretations/clarifications, the Bidder may
submit his Bid within the date and time stipulated in the Bid invitation, all such explanations,
interpretations and clarifications from the Owner shall be deemed as part of Bid Documents
and shall invariably accompany the Bidder’s proposal.
6.2 Any verbal/telephonic clarifications and information given by the Owner or his employee (s) or
his representative(s) will not in any way be binding on the Owner.
7.0 Amendment of bidding document:
7.1 At any time prior to the deadline for submission of Bids the Owner may, for any reason,
whether at his own initiative or in response to a clarification requested by the intending
Bidder, modify the Bidding Document with amendment(s).
7.2 The amendment will be notified in writing or Fax /web site to all intending Bidders who
have received the Bidding Document at the address contained in the letter of request for
issue of bidding document from the Bidders. Owner will bear no responsibility or liability
arising out of non-receipt of the same in time or otherwise.
7.3 In order to afford prospective bidders reasonable time in which to take the amendment into
account in preparing their bids, the Owner may, at his discretion, extend the deadline for the
submission of bids.
7.4 Such amendments, clarifications etc. shall be binding on bidders and will be given due
consideration by the Bidders while they submit their bids and shall invariably enclose such
documents as a part of the bid.
C. PREPARATION OF BIDS
8.0 Language of Bid:
8.1 The Bid prepared by the Bidder and all correspondence and documents relating to the Bid,
exchanged by the Bidder and the Owner, shall be written in the English language, provided
that any printed literature furnished by the Bidder may be written in another language so
long as accompanied b y an English translation of its pertinent passages. Failure to comply
with this may disqualify a bid. For purposes of interpretation of the bid, the English translation
Bidders have to make the Bid in the formats furnished with this Document. Verbatim without
adding any printed/type written text of their own.
9.0 Local Conditions:
9.1 It will be imperative on each Bidder to fully inform himself of all local conditions and factors,
which may have any effect on the execution of the Contract covered under these documents
and specifications. The Owner shall not entertain any request for clarifications from the
bidders, regarding such local conditions.
9.2 It must be understood and agreed that such factors have properly been investigated and
considered while submitting t h e pr op osal s . No c l a i m f o r f inanci al a d j u s t m e n t t o th e
Contract a w a r d e d u n d e r t h e s e specifications and documents will be entertained by
the owner. Neither any change in the time schedule of the Contract nor any financial
adjustments arising thereof shall be permitted by the Owner, which are based on the lack of
such clear information or its effect on the cost of the works to the Bidder.
Seal & Signature of Bidder
10.0 Documents comprising the Bid:
Requirements etc. furnished in the Bidding Documents, indicating, for the services to be
rendered, a brief description of services, quantity and price.
10.2 The Bidder shall also submit documentary evidence to establish that the Bidder meets the
Qualification Requirements as detailed in Clause 2.0 above and Special Conditions of Contract
(including Clause 11 of I TB).
10.3 All Tender Documents/ formats are to be completed and filled in all respects and signed by
the Company Authorized Signatory wherever specified and submitted online.
11.0 Scope of the proposal
11.1 The Scope of the proposal shall be on the basis of a single Bidder’s responsibility, completely
covering all the equipment erection and other installation services specified under the
accompanying Technical Specifications. It will include among others as specified therein the
e) Receipt of equipments and material from Soja R&M store/Mehsana Const. store or
any GETCO construction store and transporting, storage, preservation and conservation
of equipment at the Site.
f) Pre-assembly, if any, erection, testing and commissioning of all the equipments.
g) Reliability tests and performance and guarantee tests on completion of commissioning.
11.2 As specified in the Special Conditions of Contract, no deviation whatsoever to certain
conditions of the bidding documents permitted by the Owner and therefore, the Bidders are
advised that while making Bid Proposals and quoting prices these conditions may
appropriately be taken into consideration. Bidders are required to furnish a certificate in this
regard as per the format provided in Special Conditions of Contract and submitted the same
11.4 The Bidder shall complete all the schedules & annexure in the Bid Proposal Sheets,
Technical Data Sheets and specified elsewhere. The Qualifying Data should be filled in
the required schedule of Bid Proposal Sheets and submitted online.
12.0 Bid Price:
12.1 The Bidder shall indicate percentage above/below of total bid price indicated in the
commissioning, and other services it proposes to furnish under the contract. Prices quoted
should be in % Above/ Below on Estimated Cost. However, detail bifurcation of Taxes
applicable should be mentioned separately with Price bid
12.2 The Bidder shall specifically note that the Tenders are invited on percentage rate
12.3 If the Supplier/Contractor has opted for the Composition scheme of GST, the same must be
clearly specified with valid Declaration & Certificate from Department. In the event of
withdrawal/cessation of the Supplier from Composition scheme during the tenure of the
contract, the rate (i.e. price) mentioned in the price bid shall be final and any additional GST will
have to be borne by the tenderer himself. In no case additional amount towards GST or
otherwise will be paid / reimbursed to supplier/contractor. Further Statutory Variation clause will
not be applicable in case of Supplier / Contractor has opted for Composition Scheme under
Also, please mention separate applicable HSN / SAC Code and rate of GST and Cess as
applicable for each item of Goods/Service. If not specifically mentioned then COMPANY will
have the option to take the prices as exclusive of taxes and duties at maximum higher slab
rates for the evaluation of the tenders.
Seal & Signature of Bidder
The offered prices to be indicated in online mode of tender in the format given (i.e. Schedule-B).
The price bid submitted in physical mode shall not be considered.
Every bidder shall inform their GSTIN No. of the registered place(s) wherefrom the bidder intends
to supply the goods / services, meaning thereby the bidder has to supply the goods / services
from the relevant declared / registered place of supply only.
13.0 Price Basis:
13.1 The Price shall be quoted on firm basis.
13.2 The Price quoted by the bidder shall remain fixed during the bidder's performance of the
contract and shall not be subject to variation on any account save for change in quantity.
A bid submitted with an adjustable price quotation shall be treated as non-responsive and
14.0 Taxes and Duties:
14.1 Works contract-tax:
The Civil, structural and architectural portion of the contract shall be treated as works contract
Consequently, any sales tax payable on the cost of these items of supply under the works
contract shall also be included by the bidder in his total bid price and the owner shall have no
liability whatsoever in respect of such works contract tax. However, the owner will deduct works
contract tax out of the supplier’s bills as per statutory rules.
14.2 As regards the income Tax, will be levied as per prevailing rate on payment to contractors. Any
other tax except specifically mentioned in tender will not be borne by GETCO. The bidder shall
be liable and rresponsible for payment of such taxes as attracted under the provisions of the
14.4 As regards the income Tax, surcharge on income tax and any other corporate tax, the owner
shall not bear any tax liability whatsoever. The bidder shall be liable and responsible for payment
of such taxes as attracted under the provisions of the law.
14.5 Notwithstanding the tax liabilities as per the sub-clause 14.1 to14.4 above the owner shall have
the right to make deduction at source from the amounts payable to the contractor in respect of
Income Tax (on the cost of items of supply included in the works contract) as may be mandatory
in terms of the law. The owner shall not bear any liability in this regard but shall issue necessary
certificate in respect of such deduction made.
14.6 In case any tax or duty is newly introduced by the Government applicable for this contract with
effect from the next day of the date submission of the bid and if the contractor is required to pay
additional tax or duty, then the owner shall reimburse the contractor the additional tax or duty so
paid by the contractor against submission by the contractor of documentary evidence to the
satisfaction of the owner. This provision will not be applicable to transaction between the
contractor and his sub-contractors. Besides the said statutory variation, no other statutory
variation shall be payable by the owner.
14.7 The owner’s liability for all taxes and duties under the contract shall be limited to those indicated
by the Bidder in the Bid Proposal Sheets, subject to the statutory variations and variations as per
Clause No. 14.7 supra.
If the cost to the Contractor during the performance of the ‘Contract’ shall be increased or
reduced by reasons of the making, passing or promulgation of any law after the date of
submission of bid or by any order, regulation or bye-law having the force of law the amount of
such increase or reduction shall be added to or deducted from the “Contract Price” as the case
may be for direct transactions between contactor & owner, and not for bought out items. It is the
Bidders responsibility to furnish details of taxes, duties, levies etc. applicable as on the date of
submission of the bid.
Seal & Signature of Bidder
14.8 No claim for any increase towards the statutory variation regarding enhancement of existing tax
or duty or introduction of a new tax or duty applicable shall be entertained by the Owner during
the extended period of contract, if any, provided the extension of the contract is required by
causes attributable to the contractor.
14.9 The provision of statutory variation regarding enhancement of existing tax or duty or introduction
of a new tax or duty will be applicable only to the direct transaction between the contractor and
14.10 Before quoting, the bidder may ascertain from the concerned tax authorities of Government of
Gujarat the applicability of Work Contract Tax. Entry Tax, etc. in respect of this work and include
the same in the quoted price. The Owner in this regard will entertain no separate claim, as it is
the responsibility of the Bidder to pay all these taxes.
14.11 In addition, the conditions detailed under Special Conditions of Contract shall apply.
14.12 The contractor shall pay 1% welfare cess to the respective Govt .Department if applicable & the
same will be reimbursed on production of proof of payment .Before release of payment of final
bill, the contractor has to submit documentary evidence of payment of welfare cess of previous
RA bill as well as of the final bill. Also, the bidder should submit the certified copy of welfare
registration before 1st RA bill. The payment should be released after submission of said
15.0 Time Schedule:
15.1 The basic consideration and the essence of the contract shall be strict adherence to the
time schedule for performing the specified works.
15.2 The Owner’s requirements of completion schedule for the Works are mentioned in the
accompanying Special Conditions of Contract.
15.3 The completion schedule as stated in the special conditions of contract shall be one of the
major factors in consideration of the bids.
15.4 Validity of tender: 180 Days from the date of opening of Technical Bid
16.0 Insurance:
The Bidder’s insurance liabilities pertaining to the scope of Works are detailed out in
Clauses titled Insurance , in General Terms and Conditions of Contract and in Erection
Conditions of this Part-I. Bidder’s attention is specifically invited to these clauses. Bid price
shall include all the costs in fulfilling all the insurance liabilities under the Contract.
17.0 Erection Tools and Tackles:
The Bidder under a separate schedule, in his proposal shall include a list of all-special
equipment tools & tackles etc. which he proposes to bring to site for the purpose of
erection, handling, testing and commissioning including performance and guarantee tests
of the equipment. If any such equipment is listed anywhere else in the proposal and not
specially mentioned in the above schedule, it shall be deemed to have been included in the
Bidder’s proposed scope of supply.
18.0 Bid Security/EMD:
18.1 Bidders have to pay EMD by online i.e. RTGS/ NEFT as given in tender notice for above work
along with the Technical Bid. Cheque/ DD/ Corporate Bank Guarantee are not accepted. No
interest will be allowed on amount of EMD paid.
18.2 The bid security is required to protect the owner against the risk of Bidder’s conduct,
which would warrant the guarantee forfeiture, pursuant to relevant paras elsewhere The
bid guarantee shall be made payable to the Owner without any condition whatsoever.
Seal & Signature of Bidder
18.3 The Owner will reject any bid not secured in accordance with Para 20.1 above, as non-
responsive,. No exemptions are made in the furnishing of the security.
18.4 Unsuccessful Bidder’s bid security/EMD will be returned/refunded on finalization of tender
or three months from the date of submission of tender whichever is later.
18.5 The successful bidders, Bid Security will be discharged upon, furnishing the contract
performance guarantee
18.6 The bid guarantee may be forfeited.
a) If a Bidder withdraws its bid during the period of bid validity specified by the bidder on the
b) If a bidder refuses to accept the contract or fails to commence the works (including
supplies within thirty days of letter of award of contract)
19.0 Format of Bid:
19.1 All the relevant documents including tender copy to be submitted though ONLINE only. No
physical documents to be submitted by bidder, it must be submitted by n-Procure only.
20.0 Signature of Bids:
21.1 The bid must contain the name, residence and place of business of the person or persons
making the bid and must be signed and sealed by the Bidder with his usual signature. The
names of all persons signing should also be typed or printed below the signature.
20.2 Bid by a partnership must be furnished with full names of all partners and be signed with the
partnership name; followed by the signature(s) and designation(s) or the authorized partner(s)
or other authorized representative(s).
20.3 Bids by Corporation/Company must be signed with the legal name of the
Corporation/Company by the President/Managing Director or by the Secretary or other
person or persons authorized to bid on behalf of such Corporation/Company in the matter.
20.4 A bid by a person who affixes to his signature the word ‘President’, ‘Managing Director’,
‘Secretary’, ‘Agent’ or other designation without disclosing his Principal will be rejected.
20.5 If it is found that two or more persons who are connected with one another either
financially or as a principal and agent have bid under different names without disclosing their
connection then such bids will be liable for rejection. Satisfactory evidence of authority of
the person signing on behalf of the Bidder shall be furnished with the bid.
20.6 The Bidder’s name stated on the proposal shall be the exact legal name of the firm.
20.7 Bids not conforming to the above requirements of signing may be disqualified and EMD
21.0 Sealing and marking of bids:
No Technical and Commercial bid documents required.
22.0 Deadline for submission of bids:
22.1 As per Tender Notice
Seal & Signature of Bidder
Any bid received after the submission closing time or date fixed or extended for submission of
bids will be rejected and not considered for evaluation.
25.0 Modification and withdrawal of bids :
25.1 The Bidder may modify or withdraw its bid after the bid’s submission provided that written notice
of the modification or withdrawal is received by the Owner prior to the deadline prescribed for
submission of bids.
25.2 No bid shall be modified in any manner, whatsoever subsequent to the deadline for submission
25.3 No bid may be withdrawn in the interval between the deadline for submission of bids and the
expiration of the period of bid validity specified by the Bidder on the Bid Form.
Withdrawal/modification of a bid during this interval may result in the Bidder’s forfeiture of its bid
26.0 Information required with the proposal:
26.1 The bids must clearly indicate the name of the manufacturer, the type and/or model of each
principal item of equipment proposed to be furnished and erected. The bid should also contain
drawings and descriptive materials indicating general dimensions, materials from which the parts
are manufactured, principles of operation, the extent of pre-assembly involved, major
construction equipment proposed to be deployed, method of erection and the proposed erection
organizational structure.
26.2 The above information shall be provided by the Bidder in the form of separate sheets, drawings,
catalogues, etc. in five copies.
26.3 Any bid not containing sufficient descriptive material to describe accurately the equipment
proposed may be treated as incomplete and hence rejected. Such descriptive materials and
drawings submitted by the Bidder will be retained by the Owner. Any major departure from these
drawings and descriptive material submitted will not be permitted during the execution of the
Contract without specific written permission of the Owner.
26.4 Oral statements made by the Bidder at any time regarding quality, quantity or arrangement of the
equipment or any other matter will not be considered.
26.5 Standard catalogue pages and other documents of the Bidder may be used in the bid to provide
additional information and data as deemed necessary by the Bidder.
26.6 The Bidder, along with his Proposal, shall submit a list of recommended erection equipment and
materials which will be required for the purpose of erection of equipment and materials supplied
under the Contract.
27.7 In case the ‘Proposal’ information contradicts specification requirements, the specification
requirements will govern, unless otherwise brought out clearly in the technical commercial
deviation schedule.
E. BID OPENING AND EVALUATION
27.0 Opening of bids by owner:
27.1 The Owner will open the technical bids in the presence of Bidder’s representatives who
choose to attend on the date and time mentioned for opening of bids in the Invitation to
Bid or in case any extension has been given thereto, on the extended bid opening date
and time notified to all the Bidders who have purchased the bidding document. The
Bidder’s representatives who are present shall sign a register evidencing their attendance.
27.2 The Bidder’s names, Technical modifications, Bid withdrawal and such other details as the
Owner, at his discretion may consider appropriate, will be announced in the Technical Bid
Seal & Signature of Bidder
27.3 The price bids of all the “Techno-Commercial” Responsive Bidders shall be opened in the
presence of representatives (up to two per firm) of such bidders who choose to be present.
The date & time of opening the Price Bid shall be intimated to all such qualified bidders by
Fax/Telex, at least one week in advance besides inviting final price bid if found appropriate
after evaluation of Technical bids.
27.4 The Bidder’s name, lump sum Bid Price, all discounts if any, modifications in the Price Bid
and any such other details as the Owner, at his discretion, may consider appropriate, will
be announced/ furnished in the Price Bid Opening.
27.5 No electronic recording/transmitting devices will be permitted during Bid opening.
28.0 Purpose of evaluation of bids:
28.1 The Bids received/accepted/opened will be evaluated by the Owner to ascertain
the technical responsiveness of the bid for the complete scope of the proposal, as covered
under these specifications and documents. All technically responsive bids shall then be
examined to determine the LOWEST EVALUATED COMMERCIALLY AND TECHNICALLY
RESPONSIVE BIDS.
29.0 Policy for bids under consideration:
29.1 Bids shall be deemed to be under consideration immediately after opening of Technical
Bid and until such time official intimation of award/rejection is made by the Owner to the
Bidders. While the Bids are under consideration, Bidders and/or their representatives and
other interested parties are advised to refrain from contacting by any means, the owner
and/or his employee’s representatives on the matters related to Bids under consideration.
30.0 Clarification of bids:
To assist in the examination evaluation and comparison of Bids the owner may on his own
ask the Bidder for a clarification of its bid. The request for clarification and the response
shall be in writing and no change in the price or substance of the bid shall be sought, offered
31.0 Preliminary Examination:
31.1 The Owner will examine the bids to determine whether they are complete, whether any
computational errors have been made, whether required sureties have been furnished,
whether the documents have been properly signed, and whether the bids are generally in
31.2 Arithmetical errors will be rectified on the following basis:
If there is a discrepancy between the unit price and the total price that is obtained by
multiplying the unit price and quantity, the unit price shall prevail and the total price
shall be corrected. If there is a discrepancy between the total bid amount and the sum of
total costs, the latter shall prevail and the total bid amount will be corrected accordingly. If
there is a discrepancy between words and figures, the amount advantageous to the
Owner will prevail. If the Bidder does not accept the correction of the errors as above, his
Bid will be rejected and the amount of Bid Security will be forfeited. The Bidder should
In the case of any inconsistency in the prices furnished in the specified prices schedules to
be identified in Bid Form for this purpose, the Owner shall be entitled to consider the highest
price for the purpose of evaluation and for the purpose of award of Contract use the lowest
of the prices in these schedules.
31.3 Prior to the detailed evaluation, the Owner will determine the substantial responsiveness
Seal & Signature of Bidder
of each bid to the Bidding Document. For purpose of these Clauses, a substantially
responsive bid is one, which conforms to all the terms and conditions of the Bidding
Document without material deviations. A material deviation is one which affects in any
way the prices, quality, quantity or delivery period of the equipment, completion of works or
which limits in any way the responsibilities or liabilities of the Bidder of any right of the Owner
as required in these specifications and documents. The Owner’s determination of a bid’s
responsiveness shall be based on the contents of the bid itself without recourse to
extrinsic evidence.
31.4 A bid determined as not substantially responsive will be rejected by the Owner and may not
subsequently be made responsive by the Bidder by correction of non-conformity.
31.5 The Owner may waive any minor informality or non-conformity or irregularity in a bid
which does not constitute a material deviation, provided such waiver does not prejudice or
affect the relative ranking of any Bidder.
32.0 Evaluation of Price Bids: No Copy of PRICE-BID requires in Physical copy of bid. It is
compulsory to submit price-bid through on-line (n-code) only. Same will observed in physical bid
during opening, whole tender may be not considered.
32.1 Definitions and Meanings:
For the purpose of the evaluation and comparison of bids, the following meanings and
definition will apply:-
a) ‘Bid Price’ shall mean the price quoted by each Bidder in his proposal for the
complete scope of works.
d) ‘Evaluated Bid Price’ shall be summation of ‘Bid Price’, ‘Differential Price’ and ‘Cost
Compensation for Deviations.’
33.0 Calculation of differential Price & Cost Compensation for Deviations.
The Differential Price to be added to the Bid Price of each bid during evaluation and comparison
shall be derived as under:
Differential Price (DP)=n1F1+n2F2…+nnFn, where F1, F2…Fn are the various factors in Indian
Rupees per unit of parameter differential or deficiency in the equipment and services offered as
stipulated in these specifications: n1, n2…nn are the respective parameter differential or
deficiency in the corresponding units to be determined from the Bidder’s proposal. The above
factors and corresponding units of parameter differential are derived from the Technical
Specifications, Data sheets and/or Special Conditions of Contract.
Deviations from the Bidding Documents in so far as practicable will be converted to a Rupee
value (D) and from the Bidding Document while evaluating the bids. In determining the Rupee
value of the deviations the Owner will use parameters consistent with those specified in the
specifications and documents and or other information as necessary and available to the Owner.
33.1 Comparison of Bids
The bids shall be compared on the basis of lump sum prices (i.e., for erection services to be
rendered as quoted by the Bidder) for the entire scope of the proposal as defined in the Bidding
For comparison purposes all the evaluated bid prices shall be in Indian Rupees as under:
W = Total Comparison Price
Q = Bid Price quoted by the bidder in Indian Rupees (Value Of erection cost including other
components if any.)
DP = Different price in Indian Rupees calculated as above
D = Cost compensation for deviations calculated as above.
Seal & Signature of Bidder
All evaluated bid prices of all the bidders shall be compared among themselves to determine the
lowest evaluated bid and, as a result of this comparison, the lowest bid will be selected for the
award of the Contract.
F. AWARD OF CONTRACT
34.0 Award Criteria
34.1 The owner will award the contract to the successful Bidder, whose bid has been determined to
be substantially responsive and has been determined as the lowest evaluated bid, providing
further that the Bidder is determined to be qualified to perform the contract satisfactorily. The
Owner shall be the sole judge in this regard.
34.2 Further, the Owner reserves the right to award separate contracts to two or more parties in line
with the terms and conditions specified in the accompanying Technical Specifications.
35.0 Owner’s right to accept any bid and to reject any or all bids:
35.1 The Owner reserves the right to accept or reject any bid, and to annual the bidding process and
reject all bids at time prior to award of contract, any without thereby incurring any liability to the
affected Bidder or Bidders or any obligation to inform the affected Bidder or Bidders of the
grounds for the Owner’s action.
35.0 Notification of award:
35.1 Prior to the expiration of the period of bid validity and extended validity period, if any, the
Owner will notify the successful Bidder in writing by registered letter or cable or telex or
FAX, to be confirmed in writing by registered letter, that its bid has been accepted.
35.2 The notification of award will constitute the formation of the Contract.
35.3 Upon the successful Bidder’s furnishing of performance guarantee pursuant to relevant
clause 38 .0, the Owner will promptly notify each unsuccessful Bidder and will discharge
its bid security, pursuant to Clause 20.0.
36.0 Signing of contract:
36.1 At the same time as the Owner notifies the successful Bidder that his bid has been
accepted, the Owner will send the Bidder the detailed of Award, incorporating all agreements
between the parties.
36.2 Within 15 days of receipt of the detailed of Award, the successful bidder shall sign the
same with date and return it to the Owner.
36.3 The Bidder will prepare the Contract Agreement as per the Performa prescribed and the
same will be signed before commencement of work.
38.0 Contract Performance Guarantee:
38.1 As a contract performance security, the successful bidder, to whom the work is awarded, shall be
required to furnish a performance guarantee in form of DD/ Bank guarantee from a Public Sector
Indian bank/Scheduled, Commercial Bank in the form to be furnished. The guarantee amount
shall be equal to ten percent (10%) of the Contract price and it shall guarantee the faithful
performance of the Contract in accordance with the terms and conditions specified in these
documents and specifications. The guarantee shall be valid up to 90 days after the end of
Warranty Period.
38.2 The Performance Guarantee shall cover additionally the following guarantees to the Owner:
a) The successful Bidder guarantees the successful and satisfactory operation of the equipment
furnished and erected under the Contract, as per the specifications and documents.
Seal & Signature of Bidder
b) The successful Bidder further guarantees that the equipment provided by him/his sub-vendors
and installed by him shall be free from all defects in design, material and workmanship and
shall upon written notice from the Owner fully remedy free of expenses to the Owner such
defects as developed under the normal use of the said equipment within the period of
guarantee specified in the relevant clause of the General Terms and Conditions in the Part-
I/Special Conditions of Contract.
38.3 The Contract Performance Guarantee is intended to secure the performance of the entire
contract. However, it is not to be construed as limiting the damages under clause entitled
“Equipment Performance Guarantee” in Technical Specifications, Part-II and damages
stipulated in other clauses in the Bid documents.
38.4 The performance guarantee will be discharged without any interest at the end of guarantee
period, unless otherwise specified in Special Conditions of Contra.
Seal & Signature of Bidder
GENERAL TERMS & CONDITIONS OF CONTRACT
A. INTRODUCTION
1.0 DEFINITION OF TERMS
1.1 The ‘Contract’ means the agreement entered into between the Owner and the
Contractor as per the Contract Agreement signed by the parties, including all
attachments and appendices thereto and all documents incorporated by reference therein.
1.2 'Owner' shall mean the Gujarat Energy Transmission Corporation Ltd, Vadodara or any of its
group companies i.e. GUVNL, GSECL, MGVCL, DGVCL, PGVCL UGVCL and shall include its
legal representatives, successors and assigns.
1.3 ‘Contractor’ shall mean the Bidder whose bid is accepted by the Owner for the award of
the Works and shall include such successful Bidder’s legal representatives, successors and
permitted assigns.
1.4 ‘Engineer’ shall mean the officer appointed in writing by the Owner to act as Engineer from
time to time for the purpose of the Contract.
1.5 The terms ‘Equipment’, ‘Stores’ and ‘Materials’ shall mean and include equipment, stores
and materials to be provided by the Contractor under the Contract.
1.6 ‘Works’ shall mean and include the furnishing of equipment, Labor and services, as per the
Specifications and complete erection, testing and putting into satisfactory operation
including all transportation, handling, unloading and storage at the Site as defined in the
1.7 ‘Specifications’ shall mean the Specifications and Bidding Document forming a part of the
Contract and such other schedules and drawings as may be mutually agreed upon.
1.8 Site’ shall mean and include the land and other places on, into or through which the
works and the related facilities are to be erected or installed and any adjacent land, paths,
street or reservoir which may be allocated or used by the Owner or Contractor in the
performance of the Contract.
1.9 The term ‘Contract Price’ shall mean the lump-sum price quoted by the Contractor in
his bid with additions and/or deletions as may be agreed and incorporated in the Letter of
Award and the contract agreement for the entire scope of the works.
1.10 The term ‘Erection Portion’ of the Contract price shall mean the value of field activities of
the works including erection, testing and putting into satisfactory operation including successful
completion of performance and guarantee tests to be performed at Site by the Contractor
including cost of insurances.
1.11 Site Engineer ‘Inspector’ shall mean the owner’s Engineers or any person nominated
by the time to inspect the equipment; stores or Works under the Contract and/or the duly
authorized representative of the Owner.
1.12 ‘Notice of Award of Contract’/’Letter of Award’/’Telex of Award’ shall mean the official
Seal and signature of Contractor
notice issued by the Owner notifying the Contractor that his bid has been accepted.
1.13 ‘Order’ shall mean the official letter issued by the Owner informing the acceptance of the bid.
1.14 ‘Date of Contract’ shall mean the date on which letter of commencement of work issued by
the respective sub division deputy engineer.
1.15 ‘Month’ shall mean the calendar month. ‘Day’ or ‘Days’ unless herein otherwise expressly
defined shall mean calendar day or days of 24 hours each.
A ‘Week’ shall mean continuous period of seven (7) days.
1.16 Writing’ shall include any manuscript, type written or printed statement, under or over
signature and/or seal as the case may be.
1.17 When the words ‘Approved’, ‘Subject to Approval’, ‘Satisfactory’, ‘Equal to’, ‘Proper’,
‘Requested’, ‘As Directed’, ‘Where Directed’, ‘When Directed’, ‘Determined by’, ‘Accepted’,
‘Permitted’, or words and phrases of like importance are used the approval, judgment,
direction etc. is understood to be a function of the Owner/Engineer.
1.18 Test on completion shall mean such tests as prescribed in the Contract to be performed by
the Contractor before the work is taken over by the Owner.
1.19 ‘Performance and Guarantee Tests’, shall mean all operational checks and tests required to
determine and demonstrate capacity, efficiency, and operating characteristics as specified in
the Contract Documents.
1.20 The term ‘Final Acceptance’/‘Taking Over’ shall mean the Owner’s written acceptance of
the Works performed under the Contract, after successful commissioning/completion of
Performance and Guarantee Tests, as specified in the accompanying Technical Specifications
or otherwise agreed in the Contract.
1.21 ‘Latent Defects’ shall mean such defects caused by faulty designs, material or work-man-
ship which cannot be detected during inspection, testing etc, based on the technology
available for carrying out such tests.
1.22 ‘Codes’ shall mean the following including the latest amendments and/or replacements, if any:
a) Indian Electricity Act, 1905 and Rules and Regulations made there under.
b) Electricity Act 2003 and Rules & Regulations made there under.
c) Indian Factory Act, 1948 and Rules and Regulations made there under.
d) Indian Explosives Act, 1884 and Rules and Regulations made there under.
e) Indian Petroleum Act, 1934 and Rules and Regulations made there under.
f) A.S.M.E. Test Codes.
g) A.I.E.E. Test Codes.
h) American Society of Materials Testing Codes.
i) Standards of the Indian Standards Institution.
j) Other Internationally approved standards and/or rules and regulations touching the
subject matter of the Contract.
1.23 Words imparting the singular only shall also include the plural and vice –versa where the
context so requires.
1.24 Words imparting ‘Person’ shall include firms, companies, corporations and associations
or bodies of individuals, whether incorporated or not.
Seal and signature of Contractor
2.0 APPLICATION
These General Conditions shall apply to the extent that they are not super ceded by
provisions in other parts of the Contract.
3.0 CONTRACT DOCUMENTS
3.1 The term Contract Documents shall mean and include the following which shall be deemed
to form an integral part of the Contract:
a) Invitation to Bid including letter forwarding the Bidding Documents, Instructions to
Bidders, General Terms and Conditions of Contract, the Special Conditions of
Contract. and all other documents included under Part-I, Part-II and Part-III .
b) Specifications of the erection of the equipments and other technical services to be
provided under the Contract as brought out in the accompanying Technical
Specifications.
c) Contractor’s Bid Proposal and the documents attached there to including the letters of
clarifications thereto between the Contractor and the Owner prior to the Award of
Contract except to the extent of repugnancy.
d) Letter of Award and any agreed variations of the conditions of the documents and special
terms and conditions of Contract, if any.
3.2 In the event of any conflict between the above mentioned documents the matter shall be
referred to the Engineer whose decision shall be considered as final and binding upon the
4.0 USE OF CONTRACT DOCUMENTS AND INFORMATION
4.1 The Contractor shall not, without the Owner’s prior written consent, disclose the
Contract, or any provision thereof, or any specification, plan, drawing, pattern, sample or
information furnished by or on behalf of the Owner in connection therewith, to any
person other than a person employed by the Contractor in the performance of the
Contract. Disclosure to any such employed person shall be made in confidence and shall
extend only so far as may be necessary for the purpose of such performance.
4.2 The Contractor shall not, without the Owner’s prior written consent, make use of any
document or information enumerated in various Contract documents except for the
purpose of performing the Contract.
4.3 The Contractor shall not communicate or us in advertising, publicity, sales releases or
in any other medium, photographs or other reproduction of the Works under this Contract,
or descriptions of the site, dimensions, quantity, quality or other information, concerning the
works unless prior written permission has been obtained from the Owner.
4.4 Any document, other than the Contract itself, enumerated in various Contract documents
shall remain the property of the Owner and shall be returned (in all copies) to the
Owner on completion of the Contractor’s performance under the Contract if so required by
Seal and signature of Contractor
5.0 CONSTRUCTION OF THE CONTRACT
5.1 Notwithstanding anything stated elsewhere in the bid documents, the Contract to be entered
into will be treated as a single Contract. Award shall be placed on the successful Bidder as
For providing services like inland transportation, insurance for delivery at site,
unloading, storage, handling at site, installation, testing and commissioning including
performance testing in respect of all the equipment material equipment/materials given by the
owner after observing standard store procedures for transport from owner’s stores,
insurance, unloading storage handling at site installation testing & commissioning.
5.2 In case erection Contract, or where the Owner hands over his equipment to the Contractor
for executing, then the Contractor shall at the time of taking delivery of the
equipment/dispatch documents be required to execute an Indemnity Bond in favor of the
Owner in the form acceptable to the S u p e r i n t e n d i n g engineer (TR), Mehsana for
keeping the equipment in safe custody and to utilize the same exclusively for the purpose of
the said Contract. Samples of Performa for the Indemnity Bond will be furnished during award
5.3 The Contract shall in all respects be construed and governed according to Indian Laws.
5.4 It is clearly understood that the total consideration for the Contract(s) has been broken up into
various components only for the convenience of payment under the Contract(s) and for
the measurement of deviations or modifications under the Contract(s).
6.0 JURISDICTION OF CONTRACT
6.1 The laws applicable to the Contract shall be the laws in force in India. The Courts of
Mehsana shall have exclusive jurisdiction in all matters arising under this Contract.
7.0 EXECUTION OF CONTRACT:
7.1 The Owner, after the issue of the Letter of Award to the Contractor, will send one copy
of the final agreement to the Contractor for his scrutiny and approval.
7.2 The Agreement, unless otherwise agreed to, shall be signed within 30 days of the acceptance
of the Letter of Award, at the office the Owner at Mehsana on a date and time to be
mutually agreed. The Contractor shall provide for signing of the Contract, Performance
Guarantee, appropriate power of attorney and other requisite materials. In case the Contract is
to be signed beyond the stipulated time, the Bid Guarantee submitted with the Proposal will
have to be extended accordingly.
7.3 The Agreement will be signed in copies to be specified and the Contractor shall be
provided with one signed original and the rest will be retained by the Owner.
7.4 Subsequent to signing of the Contract, the Contractor at his own cost shall provide the
Owner with copies of agreement within fifteen (15) days after the signing of the Contractor.
8.0 ENFORCEMENT OF TERMS
8.1 The failure of either party to enforce at any time any of the provisions of this Contract or any
rights in respect thereto or to exercise any option therein provided, shall in no way be
construed to be a waiver of such provisions, rights or options or in any way to affect the
validity of the Contract. The exercise by either party of any of its rights herein shall not
preclude or prejudice either party from exercising the same or any other right it may have
under the Contract.
Seal and signature of Contractor
9.0 COMPLETION OF CONTRACT
9.1 Unless otherwise terminated under the provisions of any other relevant clause, this Contract
shall be deemed to have been completed on the expiry of the guarantee period as provided
for under the clause entitled ‘Guarantee’ in this section of the Volume-I.
B. GUARANTEES & LIABILITIES
10.0 TIME – THE ESSENCE OF CONTRACT
10.1 The time and the date of completion of the Contract as stipulated in the Contract by the
Owner without or with modifications, if any, and so incorporated in the Letter of Award, shall
be deemed to be the essence of the Contract. The Contractor shall so organize his resources
and perform his work as to complete it not later than the date agreed to.
10.2 The Contractor shall submit a detailed bar chart within the time frame agreed consisting
of adequate number of activities covering various key phases of the work such
as design, procurement, manufacturing, shipment and field erection activities within seven
(7) days of the date of LOI.
10.3 The above bar chart shall be compatible with the Owner’s computer environment and
furnished to the Owner on such media as may be desired by the Owner.
11.0 EFFECTIVENESS OF CONTRACT
The Contract shall be considered as having come into force from the date of the
commencement given by the respective construction sub division unless otherwise provided
12.0 PENALTY FOR DELAY
14.1 If the Contractor fails to successfully complete the work within the time fixed under the Contract,
the Contractor shall pay to the Owner as penalty a sum specified for each specified period of
delay. The details of such penalty are brought out in the accompanying Special Conditions of
Contract in clause no. 10 (SCC).
13.1 In the event of any emergency where in the judgment of the Engineer, delay would cause
serious loss or damages, repairs or adjustment may be made by the Engineer or a third
party chosen by the Engineer without advance notice to the Contractor and the cost of such
work shall be paid by the Contractor. In the event such action is taken by the Engineer, the
Contractor will be notified promptly and he shall assist wherever possible in making necessary
corrections. This shall not relieve the Contractor of his liabilities under the terms and
conditions of the Contract.
13.2 If it becomes necessary for the Contractor to rectify or renew any defective portions of the
works the provision of this clause shall apply to portion of the works so rectified or corrected
until the expiry of six (6) months from the date of such rectification or correction. If any
defects are not rectified within a reasonable time, the Engineer may proceed to do the
work at the Contractor’s risk and cost but without prejudice to any other rights which the
Owner may have against the Contractor in respect of such defects.
13.3 The rectification or correction of the work will be carried out free of cost by the
Contractor. If any rectification or correction is carried out on his behalf at the site, the
Contractor shall bear the cost of such rectification or correction.
Seal and signature of Contractor
13.4 The acceptance of the works by the Engineer shall in no way relieve the Contractor of his
obligations under this clause.
14.0 TAXES, PERMITS & LICENCES
The Contractor shall be liable and pay all non-Indian taxes, duties, levies lawfully assessed
against the Owner or the Contractor in pursuance of the Contract. In addition, the Contractor
shall be responsible for payment of all Indian duties, levies and taxes lawfully assessed
against the Contractor for his personal income & property only.
15.0 DEFENCE OF SUITS
If any action in court is brought against the Owner or Engineer or an officer or agent of the
Owner, for the failure, omission or neglect on the part of the Contractor to perform any acts,
matters, covenants or things under the Contract, or for damage or injury caused by the
alleged omission or negligence on the part of the Contractor, his agents, representatives or
his Sub-Contractors, or in connection with any claim based on lawful demands of Sub-
Contractors, workmen, suppliers or employees, the Contractor shall in all such cases
indemnify and keep the Owner, and the Engineer and/or his representative, harmless from
all losses, damages, expenses or decrees arising of such action.
16.0 LIMITATION OF LIABILITIES
The final payment by the Owner in pursuance of the Contract shall mean the release of the
Contractor from all his liabilities under the Contract. Such final payment shall be made only at
the end of the Guarantee/Warranty period or after finalization of material account and final bill
and till such time as the Contractual liabilities and responsibilities of the Contractor, shall
prevail. All other payments made under the Contract shall be treated as on-account
17.0 ENGINEER’S DECISION
17.1 In respect of all matters which are left to the decision of the Engineer including the granting
or with- holding of the certificates, the Engineer shall, if required to do so by the Contractor,
give in writing a decision thereon.
17.2 If, in the opinion of the Contractor, a decision made by the Engineer is not in accordance
with the meaning and intent of the Contract, the Contractor may file with the Engineer,
within fifteen (15) days after receipt of the decision, a written objection to the decision.
Failure to file an objection within the allotted time will be considered as an acceptance of the
Engineer’s decision and the decision shall become final and binding.
17.3 The Engineer’s decision and the filing of the written objection thereto shall be a condition
precedent to the right to request arbitration. It is the intent of the Agreement that there
shall be no delay in the execution of the works and the decision of the Engineer as rendered
shall be promptly observed.
18.0 POWER TO VARY OR OMIT WORK
18.1 No alterations, amendments, omissions, suspensions or variations of the Works (hereinafter
referred to as ‘variation’) under the Contract as detailed in the Contract Documents, shall be
made by the Contractor except as directed in writing by the Engineer, but the Engineer
shall have full powers subject to the provisions hereinafter contained, from time to time
during the execution of the Contract, by notice in writing to instruct the Contractor to
make such variation without prejudice to the Contract. The Contractor shall carry out
Seal and signature of Contractor
such variation and be bound by the same conditions as far as applicable as though the
said variations occurred in the Contract Documents. If any suggested variations would, in the
opinion of the Contractor, if carried out, prevent him from fulfilling any of his obligations or
guarantees under the Contract, he shall notify the Engineer thereof in writing and the Engineer
shall decide forthwith whether or not, the same shall be carried out and if the
Engineer confirms his instructions, the Contractor’s obligations and guarantees shall be
modified to such an extent as may be mutually agreed. Any agreed difference in cost
occasioned by any such variation shall be added to or deducted from the Contract Price as
the case may be.
18.2 In the event of Engineer requiring any variation, a reasonable and proper notice shall be
given to the Contractor to enable him to work his arrangement accordingly, and in cases
where goods or materials are already prepared or any design, drawings or pattern made or
work done as per the contract requires to be altered, a reasonable and agreed sum in respect
thereof shall be paid to the Contractor.
18.3 In any case in which the Contractor has received instructions from the Engineer as to the
requirement of carrying out the alterations or additional or substituted work which either then
or later on, will in the opinion of the Contractor, involve a claim for additional payment, the
Contractor shall immediately and in no case later than thirty (30) days, after receipt of the
instructions aforesaid and before carrying out the instructions, advise the Engineer to that
effect. But the Engineer shall not become liable for payment of any charges in respect of
any such variations, unless the instructions for the performance of the same shall be
confirmed in writing by the Engineer.
18.4 If any variation in the Works results in reduction of Contract Price, the parties shall agree, in
writing, so to the extent of any change in the price, before the Contractor proceeds with the
18.5 In all the above cases, in the event of a disagreement as to the reasonableness o f the
said sum, the decision of the Engineer shall prevail.
18.6 Notwithstanding anything stated above in this clause, the Engineer shall have the full power
to instruct the Contractor, in writing, during the execution of the Contract to vary the
quantities of the items or groups of items in accordance with the provisions of clause entitled
‘Change of Quantity’ in section GCC of this Volume-I. The Contractor shall carry out such
variations and be bound by the same conditions as though the said variations occurred in the
Contract Documents. However, the Contract Price shall be adjusted at the rates and the
prices provided for the original quantities in the Contract.
19.0 CHANGE OF QUANTITY
19.1 During the execution of the Contract, the Owner reserves the right to increase or decrease
or cancel the quantities of items under the Contract but without any change in unit price or
other terms & conditions. Such variations unless otherwise specified in the accompanying
Special Conditions of Contract and/or Technical Specifications, shall not be subjected to any
limitation for the individual items but the total variations in all such items under the Contract
shall be limited to a percentage of the Contract price as specified in the Special Conditions
19.2 The Contract price shall accordingly be adjusted based on the unit rates available in the
Contract for the change in quantities as above. The base unit rates, as identified in the
Contract shall however remain constant during the currency of the Contract, except as
provided for in Clause 33.0 below. In case the unit rates are not available for the change in
quantity, the same shall be subjected to mutual agreement.
Seal and signature of Contractor
20.0 CO-OPERATION WITH OTHER CONTRACTORS AND CONSULTING ENGINEERS
The Contractor shall agree to cooperate with the Owner’s other Contractors and Consulting
Engineers and freely exchange with them such technical information as is necessary to obtain
the most efficient and economical design and to avoid unnecessary duplication of efforts.
The Engineer shall be provided with three copies of all correspondence a d d r e s s e d by the
Contractor t o other Contractors and Consulting Engineers of the Owner in respect of such
exchange of technical information, wherever needed.
21.0 NO WAIVER OF RIGHTS
Neither the inspection by the Owner or the Engineer or any of their officials, employees, or
agents nor any order by the Owner or the Engineer for payment of money or any payment
for or acceptance of, the whole or any part of the Works by the Owner or the Engineer,
nor any extension of time, nor any possession taken by the Engineer shall operate as a
waiver of any provision of the Contract, or of any power herein reserved to the Owner or
any right to damages herein provided nor shall any waiver of any breach in the Contract be
held to be a waiver of any other or subsequent breach.
22.0 CERTIFICATE NOT TO AFFECT RIGHT OF OWNER AND LIABILITY OF THE
No interim payment certificate of the Engineer, nor any sum paid on account by the
Owner, nor any extension of time for execution of the Works granted by the Engineer shall
affect or prejudice the rights of the Owner against the Contractor or relieve the Contractor of
his obligation for the due performance of the Contract, or be interpreted as approval of the
Works done or of the equipment furnished and no certificate shall create liability for the
Owner to pay for alterations, amendments, variations or additional works not ordered, in
writing , by the Engineer or discharge the liability of the Contractor for the payment of
damages whether due, ascertained, or certified or not or any sum against the payment of
which he is bound to indemnify the Owner, nor shall any such certificate nor the
acceptance by him of any sum paid on account or otherwise affect or prejudice the rights of
the Owner against the Contractor.
23.0 PROGRESS REPORTS
During the various stages of the work in pursuance of the Contract, the Contractor shall at
his own cost submit periodic progress reports as may be reasonably required by the
Engineer with such materials as, charts, net-works, photographs, test certificates, etc. Such
progress reports shall be in the form and size as may be required by the Engineer.
24.0 TAKING OVER
Upon successful completion of all the tests to be performed at Site on equipment furnished
and erected by the Contractor, the Engineer shall issue to the Contractor a Taking over
Certificate as a proof of the final acceptance of the equipment. Such certificate shall not
unreasonably be withheld nor will the Engineer delay the issuance thereof on account of
minor omissions or defects which do not affect the commercial operation and/or cause any
serious risk to the equipment. Such certificate shall not relieve the Contractor of any of his
obligations which otherwise survive, by the terms and conditions of the Contract after issue
of such certificate.
Seal and signature of Contractor
25.1 The payment to the Contractor for the performance of the works under the Contract will be
made by the Owner as per the guidelines and conditions specified herein. All payments made
during the Contract shall be on account payments only. The final payment will be made on
completion of all Works and on fulfillment by the Contractor of all his liabilities under the
Contract and production of work completion certificate of the Sub-Station in-charge, after
following the procedures of GETCO.
Payment of Invoice will be done as mentioned below.
1. 80% of FOR destination price (on Adhoc basis)
2. 20% of FOR destination price & GST be kept under retention account and be released towards
final settlement of such invoice after verifying benefits of higher ITC passed on to the GETCO, based
on Certificates from Practicing CA firm in regard to passing of ITC and reduction in Tax instance.
It is to state that under GST Regime, the Suppliers will be entitled to Input Tax Credit (lTC) in respect
of Tax paid on input goods & service used by him as against the earlier Tax regime where CENVAT
Credit was available on account of Excise Duty and Input Tax Credit was available on account of
VAT. Hence under Statutory Variation clause, Excise Duty clause and extension in Contractual
delivery clause of Purchase Order & Works Order, the Supplier or Contractor are supposed to pass
on benefit on account of higher Input Tax Credit now available, due to introduction of GST, for
ongoing and pending supply &I works orders.
Considering, the Anti Profiteering provision of GST and Excise Duty and Statutory Variation
clause of Purchase Order and Works Order issued by GETCO, invoive will be processed &
paid on Adhoc/ provisional basis as mentioned above keeping balance 20% of FOR destination
price + GST under retention account.
25.2 Currency of Payment
All payments under the Contract shall be in Indian Rupees
Payment terms will be as prescribed in the special conditions of contract and on fulfillment of
conditions specified thereof.
26.0 Payment Schedule
26.1 Application for Payment
26.2 The Contractor shall submit application for the payment in the prescribed Performa of
the Owner. Performa for application for payment will be as prescribed.
26.3 Each such application shall state the amount claimed and shall set forth in detail, in the
order of the Payment Schedule, particulars of the Works including the Works executed at
Site and of the equipment shipped/brought on to the site pursuant to the Contract up to the
date mentioned in the application and for the period covered since the last preceding
certificate, if any.
26.4 Every interim payment certificate shall certify the Contract value of the Works executed up to
Seal and signature of Contractor
the date mentioned in the application for the payment certificate, provided that no sum shall
be included in any interim payment certificate in respect of the works that, according to the
decision of the Engineer, does not comply with the Contract.
26.5 Mode of Payment
26.6 Payment due on dispatch of equipment shall be made by the Owner through Owner’s Bank
or directly to the Contractor as per the payment schedule.
26.7 The payment of test charges, if any, payment, taxes and duties (whenever
admissible) inland transportation (including port handling), insurance and the erection
portion of the Works shall be made direct to the Contractor by the Owner.
26.8 All payments under the Contract shall be made as stipulated in the Special Conditions of
Contract after signing the Contract Agreement. The payments linked with the dispatch of
materials shall only be made after production of all dispatch documents as specified in the
relevant Contract conditions which will include the Material Inspection Clearance Certificate
issued by the Owner.
Progressive payments linked with erection shall only be made after the issue of
certificates by the Engineer, one for the quantum of work completed and the other for the
successful completion of quality check points involved in the quantum of work billed.
27.0 DEDUCTIONS FROM CONTRACT PRICE
All costs, damages or expenses that the Owner may have paid, for which under the
Contract the Contractor is liable, or any other retention award will be claimed by the
Owner. The Owner to the Contractor shall bill all such claims regularly as and when they
fall due. Such bills shall be supported by appropriate and certified vouchers or explanations,
to enable the Contractor to properly identify such claims. Such claims shall be paid by
the Contractor within thirty (30) days of the receipt of the corresponding bills and if not
paid by the Contractor within the said period, the Owner may then deduct the amount, from
any monies due or becoming due by him to the Contractor under the Contract or may be
recovered by sections of Law or otherwise.
D. RISK DISTRIBUTION
28.1 The Contractor at his cost shall arrange, secure and maintain all insurance as may be
pertinent to the Works and obligatory in terms of law to protect his interest and interests of
the Owner against all perils detailed herein. The form and the limit of such insurance as
defined herein together with the under-writer in each case shall be acceptable to the
Owner. However, i r r e s p e c t i v e of such acceptance, the responsibility to maintain
adequate insurance coverage at all time during the period of Contract shall be of Contractor
alone. The Contractor’s failure in this regard shall not relieve him of any of his contractual
responsibilities and obligations. The insurance covers to be taken by the Contractor shall be
in the joint name of the Owner and the Contractor. The Contractor shall, however, be
authorized to deal directly with Insurance Company or Companies and shall be responsible
in regard to maintenance of all insurance covers. Further the insurance should be in freely
convertible currency.
28.2 Any loss or damage to the equipment during handling, transportation, storage, erection,
putting into satisfactory operation and all activities to be performed till the successful
completion of commissioning of the equipment shall be to the account of the Contractor.
Seal and signature of Contractor
The Contractor shall be responsible for preference of all claims and make good the
damages or loss by way of repairs and/or replacement of the equipment, damaged or lost.
The transfer of title shall not in any way relieve the Contractor of the above responsibilities
during the period of Contract. The Contractor shall provide the Owner with copy of all
insurance policies and documents taken out by him in pursuance of the Contract.
Such copies of documents shall be submitted to the Owner immediately after such
insurance coverage. The Contractor shall also inform the Owner in writing at least
sixty (60) days in advance regarding the expiry/cancellation and/or change in any of
such documents and ensure revalidation, renewal etc., as may be necessary well in time.
28.3 The perils required to be covered under the insurance shall include, but not be limited to
fire and allied risks, miscellaneous accidents (erection risks) workman compensation risks,
loss or damage in transit, theft, pilferage, riot and strikes and malicious damages, civil
commotion, weather conditions, accidents of
all kinds, etc. The scope of such insurance shall be adequate to cover the
replacement/reinstatement cost of the equipment for all risks up to and including delivery of
goods and other costs till the equipment is delivered at Site. The insurance policies to be
taken should be on replacement value basis and/or incorporating escalation clause.
Notwithstanding the extent of insurance cover and the amount of claim available from the
underwriters, the Contractor shall be liable to make good the full replacement/rectification
value of all equipment/materials and to ensure their availability as per project requirements.
28.4 All costs on account of insurance liabilities covered under the Contract will be on
Contractor’s account and will be included in Contract Price, However, the Owner may from
time to time, during the pendency of the Contract, ask the Contractor in writing to limit the
insurance coverage, risks and in such a case, the parties to the Contract will agree for a
mutual settlement, for reduction in Contract price to the extent of reduced premium amount.
The Contractor, while arranging the insurance shall ensure to obtain all discounts on
premium, which may be available for higher volume or for reason of financing arrangement of
28.5 The clause entitled ‘Insurance’ under the section ECC of this Volume-I, covers the additional
insurance requirements for the portion of the works to be performed at the Site.
28.6 Special Conditions of Contract details out the various insurance liabilities.
29.0 LIABILITY FOR ACCIDENTS AND DAMAGES
Under the Contract, the Contractor shall be responsible for loss or damage to the plant until
the successful completion of commissioning as defined elsewhere in the Bid document.
30.0 DELAYS BY OWNER OR HIS AUTHORISED AGENTS
30.1 In case the Contractor’s performance is delayed due to any act of omission on the part of the
Owner or his authorized agents, then the Contractor shall be given due extension of time
for the completion of the Works, to the extent such omission on the part of the Owner
has caused delay in the Contractor’s performance of the Contract.
Regarding reasonableness or otherwise of the extension of time, the decision of the
Engineer shall be final.
30.2 In addition, the Contractor shall be entitled to claim demonstrable and reasonable
compensation if such delays have resulted in any increase in cost. The Owner shall examine
the justification for such a request for claim and if satisfied, the extent of compensation shall
Seal and signature of Contractor
be mutually agreed depending upon the circumstances at the time of such an occurrence.
31.0 FORCE MAJOR
31.1 Force major is herein defined as any cause which is beyond the control of the Contractor or
the Owner as the case may be, which they could not foresee or with a reasonable amount
of diligence could not have foreseen and which substantially affects the performance of the
Contract, such as:
a. Natural phenomena, including but not limited to floods, droughts, earthquakes and
b. Acts of any Government, domestic or foreign, including but not limited to war,
declared or undeclared, priorities, guarantees, and embargoes.
Provided either party shall within fifteen (15) days from the occurrence of such a cause notify
the other in writing of such causes.
31.2 The Contractor or the Owner shall not be liable for delays in performing his obligations
resulting from any force major cause as referred to and/or defined above The date of
completion will, subject to hereinafter provided, be extended by a reasonable time even
though such cause may occur after Contractor’s performance of obligation has been delayed
due to other causes.
32.0 SUSPENSION OF WORK
32.1 The Owner reserves the right to suspend and reinstate execution of the whole or any part
of the Works without invalidating the provisions of the Contract. Orders for suspension or
reinstatement of the Works will be issued by the Engineer to the Contractor in writing. The
time for completion of the works will be extended for a period equal to duration of the
32.2 Any necessary and demonstrable cost incurred by the Contractor as a result of such
suspension of the works will be paid by the Owner, provided such costs are substantiated to
the satisfaction of the Engineer. The Owner shall not be responsible for any liabilities if
suspension or delay is due to some default on the part of the Contractor or his Sub-
33.0 CONTRACTOR`S DEFAULT
33.1 If the Contractor shall neglect to execute the works with due diligence and expedition or shall
refuse or neglect to comply with any reasonable order given to him, in writing by the Engineer in
connection with the works or shall contravene the provisions of the Contract, the Owner may give
notice in writing to the Contractor to make good the failure, neglect or contravention complained
of. Should the Contractor fail to comply with the notice within thirty (30) days from the date of
serving the notice, then and in such case the Owner shall be at liberty to employ other workmen
and forthwith to execute such part of the works as the Contractor may have neglected to do or if
the Owner shall think fit, without prejudice to any other right he may have under the Contract to
take the work wholly or in part out of the Contractor's hands and recontract with any other person
or persons to complete the works or any part thereof and in that event the Owner shall have free
use of all Contractor's equipment that may have been at the time on the Site in connection with
the works without being responsible to the Contractor for fair wear and tear thereof and to the
exclusion of any right of the Contractor over the same, and If the sum that the Contractor is
entitled to be paid plus the costs incurred by the Owner in completinq the works, exceeds the
Seal and signature of Contractor
Contract Price or the entire works i entire works have been com leted or the rice or art o the
works if part of the works have been completed, the Contractor shall be liable for such excess.
If such excess is areater than the sums due to the Contractor, the Contractor shall pay the
balance to the Owner and if such excess is less than the sums due to the Contractor. Owner
shall pay the balance to the Contractor. For facilitatinq such payment, Owner shall encash the
Bank Guarantees of Contractor available with Owner/s and retain such other payments due to
the Contractor under the Contract in question or any other Contract that the Owner/s may have
with the Contractor. Such payment of excess amount shall be independent of the liquidated
damages for delay which the Contractor shall have to pay if the completion of works is delayed.
33.2 In addition, such action by the Owner as aforesaid shall not relieve the Contractor of his
liability to pay liquidated damages for delay in completion of Works as defined in Clause
of this Section.
33.3 Such action by the Owner as aforesaid the termination of the Contract under this clause
shall not entitle the Contractor to reduce the value of the Contract Performance Guarantee
nor the time thereof. The Contract Performance Guarantee shall be valid for the full value
and for the full period of the Contract including guarantee period.
34.0 TERMINATION OF CONTRACT ON OWNER`S INITIATIVE
34.1 The Owner reserves the right to terminate the Contract either in part or in full due to
reasons other than those mentioned under clause entitled ‘Contractor’s Default’. The
Owner shall in such an event give fifteen (15) days notice in writing to the Contractor of his
decision to do so.
34.2 The Contractor upon receipt of such notice shall discontinue the work on the date and
to the extent specified in the notice, make all reasonable efforts to obtain cancellation of all
orders and Contracts to the extent they are related to the work terminated and terms
satisfactory to the Owner, stop all further sub- contracting or purchasing activity related to
the work terminated, and assist Owner in maintenance, protection, and disposition of the
works acquired under the Contract by the Owner.
In the event of such a termination the Contractor shall be paid compensation, equitable and
reasonable, dictated by the circumstances prevalent at the time of termination.
34.3 If the Contractor is an individual or a proprietary concern and the individual or the proprietor
dies and if the Contractor is a partnership concern and one of the partners dies then unless
the Owner is satisfied that the legal representatives of the individual Contractor or of the
proprietor of the propriety concern and in the case of partnership, the surviving partners, are
capable of carrying out and completing the Contract the Owner shall be entitled to cancel
the Contract as to its incomplete part without being in any way liable to payment of any
compensation to the estate of deceased Contractor and/or to the surviving partners of
the Contractor’s firm on account of the cancellation of the Contract. The decision of the
Owner that the legal representatives of the deceased Contractor or surviving partners of the
Contractor’s firm cannot carry out and complete the Contract shall be final and binding on
the parties. In the event of such cancellation the Owner shall not hold the estate of the
deceased Contractor and/or the surviving partners of the estate of the deceased Contractor
and/or the surviving partners of the Contractor’s firm liable to damages for not completing
35.0 FRUSTRATION OF CONTRACT
35.1 In the event of frustration of the Contract because of supervening impossibility in terms of
Section 56 of the Indian Contract Act, parties shall be absolved of their responsibility to
Seal and signature of Contractor
perform the balance portion of the Contract, subject to provisions contained in sub-clause
35.2 In the event of non-availability or suspension of funds for any reasons, whatsoever (except
for reason of willful or flagrant breach by the Owner) and/or Contractor then the works under
the Contract shall be suspended.
Furthermore, if the Owner is unable to make satisfactory alternative arrangements for financing
to the Contractor in accordance with the terms of the Contract within three months of the
event, the parties hereto shall be relieved from carrying out further obligations under the
Contract treating it as frustration of the Contract.
35.3 In the event referred to in sub-clauses 45.1 & 45.2 above the parties shall mutually discuss
to arrive at reasonable settlement on all issues including amounts due to either party for the
work already done on quantum merit basis, which shall be determined by mutual agreement
between the parties.
36.0 GRAFTS AND COMMISSIONS ETC.
Any graft, commission, gift or advantage given, promised or offered by or on behalf of the
Contractor or his partner(s), agent(s), officer(s), director(s), employee(s) or servant(s) or any
one on his or their behalf in relation to the obtaining or to the execution of this or any
other Contract with the Owner, shall in addition to any criminal liability which it may incur,
subject the Contractor to the cancellation of this and all other Contracts and also to
payment of any loss or damage to the Owner resulting from any cancellation. The
Owner shall then be entitled to deduct the amount so payable from any monies
otherwise due to Contractor under the Contract.
RESOLUTION OF DISPUTES
37.0 SETTLEMENT OF DISPUTES
37.1 Any dispute(s) or difference(s) arising out of or in connection with the Contract shall, to
the extent possible, be settled amicably between the parties.
37.2 If any dispute or difference of any kind, whatsoever, shall arise between the Owner and the
Contractor, arising out of the Contract for the performance of the Works whether during the
progress of the Works or after its completion or whether before or after the termination,
abandonment or breach of the Contract, it shall, in the first place, be referred to and settled
by the Engineer, who, within a period of thirty (30) days after being requested by either party
to do so, shall give written notice of his decision to the Owner and the Contractor.
37.3 Save as hereinafter provided, such decision in respect of every matters so referred shall
be final and binding upon the parties until the completion of the Works and shall forthwith
be given effect to by the Contractor who shall proceed with the Works with all due diligence,
whether he or the Owner requires arbitration as hereinafter provided or not.
37.4 If after the Engineer has given written notice of his decision to the parties, no claim to
arbitration has been communicated to him by either party within thirty (30) days from the
receipt of such notice, the said decision shall become final and binding on the parties.
37.5 In the event of the Engineer failing to notify his decision as aforesaid within thirty (30) days
after being requested as aforesaid, or in the event of either the Owner or the Contractor
being dissatisfied with any such decision, or within thirty (30) days after the expiry of the first
mentioned period of thirty days, as the case may be, either party may require that the
matters in dispute be referred to arbitration as hereinafter provided.
Seal and signature of Contractor
38.0 ARBITRATION
38.1 All disputes or differences in respect of which the decision, if any, of the Engineer has not
become final or binding as aforesaid shall be settled by arbitration in the manner hereinafter
38.1.1 The arbitration shall be conducted by three arbitrators, one each to be nominated by the
Contractor and the Owner and the third to be appointed as an umpire by both the arbitrators
in accordance with the Indian Arbitration Act. If either of the parties fails to appoint its
arbitrator within sixty (60) days after receipt of a notice from the other party invoking the
Arbitration clause, the arbitrator appointed by the party invoking the arbitration clause
shall become the sole arbitrator to conduct the arbitration.
38.1.2 The arbitration shall be conducted in accordance with the provisions of the Indian Arbitration
Act, 1940 or any statutory modification thereof. The venue of arbitration shall be Mehsana.
38.2 The decision of the majority of the arbitrators shall be final and binding upon the parties.
The arbitrators may, from time to time with the consent of all the parties enlarge the time for
making the award. In the event of any of the aforesaid arbitrators dying, neglecting,
resigning or being unable to act for any reason, it will be lawful for the party concerned to
nominate another arbitrator in place of the outgoing arbitrator.
38.3 The arbitrator shall have full powers to review and/or revise any decision, opinion, direction,
certification or valuation of the Engineer in accordance with the Contract, and neither party
shall be limited in the proceedings before such arbitrators to the evidence or arguments put
before the Engineer for the purpose of obtaining the said decision.
38.4 No decision given by the Engineer in accordance with the foregoing provisions shall
disqualify him as being called as a witness or giving evidence before the arbitrators on any
matter whatsoever relevant to the dispute or difference referred to the arbitrators as
38.5 During settlement of disputes and arbitration proceedings, both parties shall be obliged to
carry out their respective obligations under the Contract.
39.0 RECONCILIATION OF ACCOUNTS
The Contractor shall prepare and submit every one month, a statement covering payments
claimed and the payments received vis-à-vis the works executed, for reconciliation of
accounts with the Owner. The Contractor shall also prepare and submit a detailed
account of Owner Issue materials received and utilized by him for reconciliation purpose
in a format to be discussed & finalized with the Owner before the award of Contract.
Seal and signature of Contractor
ERECTION CONDITIONS OF CONTRACT
1.1 The following shall supplement the conditions already contained in other parts of these
specifications & document and shall govern the portion of the work of this Contract to be
performed at Site.
1.2 The Contractor upon signing of the Contract shall, nominate a responsible officer as his
representative at Site suitably designated for the purpose of overall responsibility and
coordination of the works to be performed at Site. Such person shall function from the Site
office of the Contractor during the pendency of Contract.
2.0 REGULATION OF LOCAL AUTHORITIES AND STATUTES
2.1 The Contractor shall comply with all the rules and regulations of local authorities during the
performance of his field activities. He shall also comply with the Minimum Wages Act,
1948 and the Payment of Wages Act (both of the Government of India) and the rules made
there under in respect of any employee or workman employed or engaged by him or his Sub-
Contractor. He shall abide by labor laws and others as specified in the special conditions of
2.2 All registration and statutory inspection fees, if any, in respect of his work pursuant to this
Contract shall be to the account of the Contractor. Should any such inspection or registration
need to be re-arranged due to the fault of the Contractor or his Sub Contractor, the
additional fees to such inspection and/or registration also shall be borne by the Contractor.
3.0 OWNER’S LIEN ON EQUIPMENT
The Owner shall have lien on all equipment brought to the Site for the purpose of erection,
testing and commissioning of the equipment to be supplied & erected under the Contract.
The Owner shall continue to hold the lien on all such equipment throughout the period of
Contract. No material brought to the Site shall be removed from the Site by the Contractor
and/or his Sub-Contractors without the prior written approval of the Engineer.
4.0 ACCESS TO SITE AND WORKS ON SITE
4.1 Suitable access to and possession of the Site shall be afforded to the Contractor by
the Owner in reasonable time.
4.2 The works so far as it is carried out on the Owner’s premises, shall be carried out at
such time as the Owner may approve and the Owner shall give the Contractor reasonable
facilities for carrying out the works.
4.3 In the execution of the works, no person other than the Contractor or his duly appointed
representative, Sub- Contractor and workmen, shall be allowed to do work on the Site,
except by the special permission, in writing of the Engineer or his representative.
5.0 CONTRACTOR’S SITE ESTABLISHMENT
The Contractor shall at all times keep posted an authorized representative for the purpose of
the Contract. Any written order or instruction of the Engineer or his duly authorized
representative shall be communicated to the said authorized resident representative of the
Seal and signature of Contractor
Contractor and the representative shall be available at a stated address for this purpose.
6.0 CO-OPERATION WITH OTHER CONTRACTORS
6.1 The Contractor shall co-operate with all other Contractors or tradesmen of the Owner,
who may be performing other works on behalf of the Owner and the workmen who may be
employed by the Owner and doing work in the vicinity of the Works under the Contract. The
Contractor shall also so arrange to perform his work as to minimize, to the maximum extent
possible, interference with the work of other Contractors and their workmen. Any injury or
damage that may be sustained by the employees of the other Contractors and the Owner,
due to the Contractor’s work shall promptly be made good at the Contractor’s own expense.
7.0 DISCIPLINE OF WORKMEN
The Contractor shall adhere to the disciplinary procedure set by the Engineer in respect of
his employees and workmen at Site. The Engineer shall be at liberty to object to the
presence of any representative or employee of the Contractor at the Site, if in the opinion of
the Engineer such employee has misconduct himself or is incompetent or negligent or
otherwise undesirable and then the Contractor shall remove such a person objected to and
provide in his place a competent replacement.
8.0 CONTRACTOR’S FIELD OPERATION
8.1 The Contractor s h a l l keep the Engineer informed in advance regarding his field
activity plans and schedules for carrying-out each part of the works. Any review of such
plan or schedule or method of work by the Engineer shall not relieve the Contractor of any
of his responsibilities towards the field activities. Such reviews shall also not be considered
as an assumption of any risk or liability by the Engineer or the Owner or any of his
representatives and no claim of the Contractor will be entertained because of the failure or
inefficiency of any such plan or schedule or method of work reviewed. The Contractor shall be
solely responsible for the safety, adequacy and efficiency of plant and equipment and his
erection methods.
8.2 The Contractor shall have the complete responsibility for the conditions of the Work-site
including the safety of all persons employed by him or his Sub–Contractor and all the
properties under his custody during the performance of the work. This requirement shall
apply continuously till the completion of the Contract and shall not be limited to normal
9.0 PROGRESS REPORT
9.1 The C ont r act or shall furnish three (3) copies each to the Engineer of progress
including if any, photographs of the work done at Site.
9.2 The monthly progress report detailing-out the progress achieved on all erection activities
shall highlight comparison to the schedules. The report shall also indicate the reasons for
the variance between the scheduled and actual progress and the action proposed for
corrective measures, wherever necessary.
10.0 MAN-POWER REPORT
10.1 The Contractor shall submit to the Engineer, on the first day of every month, a man hours
schedule for the month, detailing the man hours scheduled for the month, skill-wise and area-
Seal and signature of Contractor
11.0 PROTECTION OF WORK
The Contractor shall have total responsibility for protecting his works till it is finally taken
over by the Engineer. No claim will be entertained by the Owner or by the Engineer for any
damage or loss to the Contractor’s works and the Contractor shall be responsible for
complete restoration of the damaged works to original conditions to comply with the
specification and drawings.
12.0 EMPLOYMENT OF LABOR
12.1 The Contractor will be expected to employ on the work only his regular skilled
employees with experience of his particular work. No person below the age of eighteen
years shall be employed.
12.2 All traveling expenses including provisions of necessary transport to and from Site, lodging,
allowances and other payments to the Contractor’s employees shall be the sole responsibility
of the Contractor.
12.3 In case the Owner becomes liable to pay any wages or dues to Labor or any Government
agency under any of the provisions of the Minimum Wages Act, Workmen
Compensation Act, Contract Labor Regulation Abolition Act or any other law due to act of
omission of the Contractor, the Owner may make such payment and shall recover the same
from the Contractor’s bills.
13.0 FACILITIES TO BE PROVIDED BY THE OWNER
Land for Contractor’s Store, Workshop etc.
a) The Engineer shall at his discretion and for the duration of execution of the Contract make
available at site, land for construction of Contractor’s field office, workshop, stores, etc.
required for execution of the Contract. Any such temporary construction shall be done by the
Contractor at his cost.
b) On completion of work the Contractor shall hand over the land duly cleaned to the Engineer.
Until and unless the Contractor has handed over the vacant possession of land allotted to him
for the above purpose, the payment of his final bill shall not be made.
13.2 Electricity: Power Supply
Where power supply is available with the Owner for construction purpose the same will be
provided at the job site at one point of the distribution system as may be decided by Engineer
free of charge for consumption in works. Electricity furnished will be 440 volts, 3 phase,
cycles and 230 volts, 1 phase,50 cycles. Each Contractor shall provide and install all
necessary transformers, switchgears, wiring fixtures, bulbs and other temporary equipment
for further distribution and utilization of energy for power and lighting and shall remove the
same on completion of the work. Should, however, electricity be used in the Contractor’s
Labor/staff colony, the power so consumed shall be charged at the prevailing tariff rate of
the GUVNL as prevalent for that area at the time of award of work; the supply may be
withdrawn if the power is used for purposes other than for the work of the project and the
Contractor shall not be entitled to any claim whatsoever on account of any such action taken
by the Engineer.
14.0 FACILITIES TO BE PROVIDED BY THE CONTRACTOR
14.1 Tools, tackles and scaffoldings
The Contractor shall provide all the construction equipments; tools, tackles and scaffoldings
required for pre-assembly, erection, testing and commissioning of the equipment covered
Seal and signature of Contractor
under the Contract. He shall submit a list of all such materials to the Engineer before the
commencement of work at Site. These tools and tackles shall not be removed from the Site
without the written permission of the Engineer.
The Contractor shall provide necessary first-aid facilities for all his employees,
representatives and workmen working at the Site. Enough number of Contractor’s personnel
shall be trained in administering first-aid.
14.3 Cleanliness
The Contractor shall be responsible for keeping the entire area allotted to him clean and free
from rubbish, debris etc. during the period of Contract. The Contractor shall employ
enough number of personnel to keep the work area clean. Materials and stores shall be so
arranged to permit easy cleaning of the area. In areas where equipment might drip oil and
cause damage to the floor surface, a suitable protective cover of a flame resistant, oil proof
sheet shall be provided to protect the floor from such damage.
15.0 LINES AND GRADES
All the works shall be performed to the lines, grades and elevations indicated on the
drawings. The Contractor shall be responsible to locate and lay-out the works. Basic
horizontal and vertical control points will be established and marked by the Engineer at site
at suitable points. These points shall be used as datum for the works under the Contract.
The Contractor shall inform the Engineer well in advance of the times and places at which
he wishes to do work in the area allotted to him so that suitable datum points may be
established and checked by the Engineer to enable the Contractor to proceed with his
works. Any work done without being properly located may be removed and/or
dismantled by the Engineer at Contractor’s expense.
16.0 FIRE PROTECTION
16.1 The work procedures that are to be used during the erection shall be those, which minimize
fire hazards to the extent practicable. Combustible materials, combustible waste and
rubbish shall be collected and removed from the Site at least once each day. Fuels, oils
and volatile or inflammable materials shall be stored away from the construction and
equipment and materials storage areas.
16.2 All the Contractor’s supervisory personnel and select number of workers shall be trained for fire
fighting. Enough of such trained personnel must be available at the Site during the entire period
of the Contract.
The Contractor shall have total responsibility for all equipment and materials in his
custody/stores, loose, semi-assembled and/or erected by him at Site. The Contractor shall
make suitable security arrangements ensure the protection of all materials, equipment and
works from theft, fire, pilferage and any other damages and loss.
18.0 PRE-COMMISSIONING TRIALS AND INITIAL OPERATIONS
The pre-commissioning trials and initial operations of the equipment erected by the
Contractor shall be carried out in presence of contractor and is deemed considered as part of
the work completion. If it is anticipated that the above test may prolong for a long time, the
Seal and signature of Contractor
Contractor’s workmen required for the above test shall always be present at Site during such
tests and trials.
19.0 MATERIALS HANDLING AND STORAGE
19.1 All the equipment furnished under the Contract and arriving at Site shall be promptly
received, unloaded, transported and stored in the storage spaces by the Contractor.
19.2 Contractor shall be responsible for examining all the shipment and notify the Engineer
immediately of any damages, storage, discrepancy etc, for the purpose of Engineer’s
information only. The Contractor shall submit to the Engineer every week a report detailing
all the receipts during the week. However, the Contractor shall be solely responsible for any
shortages or damages in transit, handling and / or in storage and erection of the equipment
at Site. Any demurrage, wharf age and other such charges claimed by the transporters,
railways etc, shall be to the account of the Contractor.
19.3 The Contractor shall maintain an accurate and exhaustive record detailing out the list of
all equipment materials received by him for the purpose of erection and keep such record
open for the inspection of the Engineer in-charge.
19.4 All equipment shall be handled very carefully to prevent any damage or loss. The equipment
stored shall be properly protected to prevent damage either to the equipment or to the floor
where they are stored. The equipment from the store shall be moved to the actual location
at the appropriate time so as to avoid damage of such equipment at Site.
19.5 All electrical panels, control gears, motors and such other devices shall be properly dried
by heating before they are installed and energized. Motor bearings, slip ring, commutators
and other exposed parts shall be protected against moisture ingress and corrosion during
storage and periodically inspected.
19.6 All the electrical equipment such as motors, generators, etc. shall be tested for insulation
resistance at least once in three months from the date of receipt till the date of
commissioning and a record of such measured insulation values maintained by the
Contractor. Such records shall be opened for inspection by the Engineer.
19.7 The consumable and other supplies likely to deteriorate due to storage must be thoroughly
protected and stored in a suitable manner to prevent damage or deterioration in quality by
19.8 All the materials stored in the open or dusty location must be covered with suitable
weatherproof and flame proof covering material wherever applicable.
19.9 If the materials belonging to the Contractor are stored in areas other than those earmarked
for him, the Engineer will have the right to get it moved to the area earmarked for the
Contractor at the Contractor’s cost.
19.10 The Contractor shall be responsible for making suitable indoor storage facilities to store all
equipment, which require indoor storage. Normally, all the electrical equipment such as
motors, control gears, generators, exciters and consumables like electrodes, lubricants etc.
shall be stored in the closed storage space. The Engineer, in addition, may direct the
Contractor to move certain other materials, which in his opinion will require indoor storage,
to indoor storage areas, which the Contractor shall strictly comply with.
Seal and signature of Contractor
20.0 CONSTRUCTION MANAGEMENT
20.1 The field activities of the Contractors working at Site will be coordinated by the
Engineer and the Engineer’s decision shall be final in resolving any disputes or conflicts
between the Contractor and other Contractors and the tradesmen of the Owner regarding
scheduling and coordination of work. Such decision by the Engineer shall not be a
cause for extra compensation or extension of time for the Contractor.
20.2 The Engineer shall hold weekly meetings of the Contractor at Site, at a time and place to be
designated by the Engineer. The Contractor shall attend such meetings and take notes of
discussions during the meeting and the decision of the Engineer and shall strictly adhere to
those decisions in performing his works. In addition to the above weekly meeting, the
Engineer may call for other meetings either with individual Contractors or with selected
number of Contractors and in such a case the Contractors if called, will also attend such
20.3 Time is the essence of the Contract and the Contractor shall be responsible for performance
of his works in accordance with the specified construction schedule. If at any time, the
Contractor is falling behind the schedule, he shall take necessary action to make good for
such delays by increasing his work force or by working overtime or otherwise accelerate the
progress of the work to comply with the schedule and shall communicate such actions in
writing to the Engineer, satisfying that his action will compensate for the delay. The
Contractor shall not be allowed any extra compensation for such action.
20.4 The Engineer shall, however, not be responsible for provision of additional Labor and/or
materials or supply or any other services to the Contractor except for the coordination
work between various Contractors if any at site.
21.0 FIELD OFFICE RECORDS
The Contractor shall maintain up to date copies of all drawings, specifications and
other Contract Documents and any other supplementary data complete with all the
latest revisions thereto. The Contractor shall also maintain in addition the continuous
record of all changes to the above Contract Documents, drawings, specifications, and
supplementary data, etc. effected at the field and on completion of his total assignment under
the Contract shall incorporate all such changes on the drawings and other Engineering data
to indicate as installed conditions of the equipment furnished and erected under the
Contract. Such drawings and Engineering data shall be submitted to the Engineer in
required number of copies.
22.0 CONTRACTOR’S MATERIALS BROUGHT TO SITE
22.1 The Contractor shall bring to Site all equipment, components, parts, materials, including
construction equipment, tools and tackles for the purpose of the works under intimation to
the Engineer. All such goods shall, from the time of their being brought vest in the Owner,
but may be used for the purpose of the works only and shall not on any account be
removed or taken away by the Contractor without the written permission of the Engineer.
The Contractor shall nevertheless be solely liable and responsible for any loss or destruction
thereof and damage thereto.
22.2 The Owner shall have a lien on such goods for any sum or sums which may at any time be
due or owing to him by the Contractor, under, in respect of or by reasons of the Contract.
After giving a fifteen (15) days notice in writing of his intention to do so, the Owner shall be
at liberty to sell and dispose off any such goods, in such manner as he shall think fit and to
apply the proceeds in or towards the satisfaction of such sum or sums due as aforesaid.
Seal and signature of Contractor
22.3 After the completion of the Works, the Contractor shall remove from the Site under the
direction of the Engineer the materials such as construction equipment, erection tools and
tackles, scaffolding etc. with the written permission of the Engineer.
23.0 PROTECTION OF PROPERTY AND CONTRACTOR’S LIABILITY
23.1 The Contractor shall be responsible for any damage resulting from his operations. He
shall also be responsible for protection of all persons including members of public and
employees of the Owner and the employees of other Contractors and Sub-Contractors and
all public and private property.
24.1 In addition to the conditions covered under the Clause entitled ‘Insurance’ in General
Terms and Conditions of Contract of this Volume-I, the following provisions will also apply to
the portion of works to be done beyond the Contractor’s own or his Sub-Contractor’s
manufacturing Works.
24.2 Workmen’s Compensation Insurance
This insurance shall protect the Contractor against all claims applicable under the
Workmen’s Compensation Act, 1948 (Government of India). This policy shall also cover
the Contractor against claims for injury, disability, disease or death of his or his Sub-
Contractor’s employee, which for any reason are not covered under the Workmen’s
Compensation Act, 1948. The liabilities shall not be less than:
Workmen’s : As per statutory Provisions
Employee’s : As per statutory
Liability Provisions
24.3 Comprehensive General Liability Insurance
The insurance shall protect the Contractor against all claims arising from injuries, disabilities,
disease or death of members of public or damage to property of others, due to any act of
omission on the part of the Contractor, his agents, his employees, his representatives and
Sub-Contractors or from riots, strikes and civil commotion.
2.4.4 The hazards to be covered will pertain to all the works and areas where the
Contractor, his Sub- Contractors, his agents and his employees have to perform work
pursuant to the Contract.
24.5 The above are only illustrative list of insurance covers normally required and it will be the
responsibility of the Contractors to maintain all necessary insurance coverage to the extent
both in time and amount to take care of all his liabilities either direct or indirect, in pursuance
of the Contract.
25.0 UNFAVORABLE WORKING CONDITIONS
The Contractor shall confine all his field operations to those works, which can be
performed without subjecting the equipment and materials to adverse effects during
inclement weather conditions, like monsoon, storms etc. and during other unfavorable
construction conditions. No field activities shall be performed by the Contractor under
Seal and signature of Contractor
conditions, which might adversely affect the quality and efficiency thereof, unless special
precautions or measures are taken by the Contractor in a proper and satisfactory manner in
the performance of such Works and with the concurrence of the Engineer. Such unfavorable
construction conditions will in no way relieve the Contractor of his responsibility to perform
the Works as per the schedule.
26.0 PROTECTION OF MONUMENTS AND REFERENCE POINTS
The Contractor shall ensure that any finds such as relic, antiquity, coins, fossils, etc. which
he may come across during the course of performance of his Works either during excavation
or elsewhere, are properly protected and handed over to the Engineer. Similarly the
Contractor shall ensure that the bench marks, reference points, etc, which are marked either
with the help of Engineer or by the Engineer shall not be disturbed in any way during the
performance of his Works. If any work is to be performed which disturbs such reference
the same shall be done only after these are transferred to other suitable locations under the
direction of the Engineer. The Contractor shall provide all necessary materials and
assistance for such relocation of reference points etc.
27.0 WORK & SAFETY REGULATIONS
27.1 The Contractor shall ensure proper safety of all the workmen, materials, plant and
equipment belonging to him or to or to others, working at the Site. The Contractor shall also
be responsible for provision of all safety notices and safety equipment required both by the
relevant legislations and the Engineer, as he may deem necessary.
27.4 All equipment used in construction and erection by Contractor shall meet
Indian/International Standards and where such standards do not exist, the Contractor
shall ensure these to be absolutely safe. All equipment shall be strictly operated and
maintained by the Contractor in accordance with manufacturer’s Operation Manual and safety
instructions and as per Guidelines/rules of in this regard.
27.5 Periodical examinations and all tests for all lifting/hoisting equipment & tackles shall be
carried-out in accordance with the relevant provisions of Factories Act 1948, Indian Electricity
Act 1910 and associated Laws/Rules in force from time to time. A register of such
examinations and tests shall be properly maintained by the Contractor and will be promptly
produced as and when desired by the Engineer or by the person authorized by him.
27.6 The Contractor shall provide suitable safety equipment of prescribed standard to all
employees and workmen according to the need.
27.8 The Contractor shall provide safe working conditions to all workmen and employees at the
Site including safe means of access, railings, stairs, ladders, scaffoldings etc. The
scaffoldings shall be erected under the
control and supervision of an experienced and competent person. For erection, good and
standard quality of material only shall be used by the Contractor.
27.9 The Contractor shall not interfere or disturb electric fuses, wiring and other
electrical equipment belonging to the Owner or other Contractors under any
circumstances, whatsoever, unless expressly permitted in writing by to handle such fuses,
wiring or electrical equipment
27.10 Before the Contractor connects any electrical appliances to any plug or socket belonging
to the other Contractor or Owner, he shall:
Seal and signature of Contractor
a. Satisfy the Engineer that the appliance is in good working condition;
b. Inform the Engineer of the maximum current rating, voltage and phases of the
c. Obtain permission of the Engineer detailing the sockets to which the
appliances may be connected.
27.11 The Engineer will not grant permission to connect until he is satisfied that;
a. The appliance is in good condition and is fitted with suitable plug;
b. The appliance is fitted with a suitable cable having two earth conductors, one of
which shall be an earthed metal sheath surrounding the cores.
27.12 No electric cable in use by the Contractor/Owner will be disturbed without prior permission.
No weight of any description will be imposed on any cable and no ladder or similar
equipment will rest against or attached to it.
27.13 No repair work shall be carried out on any live equipment. The equipment must be
declared safe by the Engineer and a permit to work shall be issued by the Engineer before
any repair work is carried out by the Contractor. While working on electric lines/equipment,
whether live or dead, suitable type and sufficient quantity of tools will have to he provided by
the Contractor to electricians/workmen/officers.
27.14 In case any accident occurs during the construction/ erection or other associated activities
undertaken by the Contractor thereby causing any minor or major or fatal injury to his
employees due to any reason, whatsoever, it shall be the responsibility of the Contractor to
promptly inform the same to the Engineer in prescribed form and also to all the authorities
envisaged under the applicable laws.
27.15 The Engineer shall have the right at his sole discretion to stop the work, if in his opinion
the work is being carried out in such a way that it may cause accidents and endanger the
safety of the persons and/or property, and/or equipment. In such cases, the Contractor shall
be informed in writing about the nature of hazards and possible injury/accident and he
shall comply to remove shortcomings promptly. The Contractor after stopping the specific
work can, if felt necessary, appeal against the order of stoppage of work to the Engineer
within 3 days of such stoppage of work and decision of the Engineer in this respect shall be
conclusive and binding on the Contractor.
27.16 The Contractor shall not be entitled for any damages/compensation for stoppage of work
due to safety reasons as provided in Para 31.18 above and the period of such stoppage of
work will not be taken as an extension of time for completion of work and will not be the
ground for waiver of levy of liquidated damages.
27.17 It is mandatory for the Contractor to observe during the execution of the works, requirements
of Safety Rules which would generally include but not limited to following
a) Each employee shall be provided with initial indoctrination regarding safety by the
Contractor, so as to enable him to conduct his work in a safe manner.
b) No employee shall be given a new assignment of work unfamiliar to him without proper
introduction as to the hazards incident thereto, both to himself and his fellow employees.
c) Employees must not leave naked fires unattended. Smoking shall not be permitted
Seal and signature of Contractor
around fire prone areas and adequate firefighting equipment shall be provided at crucial
d) There shall be a suitable arrangement at every work site for rendering prompt and
sufficient first aid to the injured.
j) Requirements of ventilation in underwater working to licensed and experienced divers,
use of gum boots for working in slushy or in inundated conditions are essential
requirements to be fulfilled.
27.18 The Contractor shall follow and comply with all Safety Rules, relevant provisions of
applicable laws pertaining to the safety of workmen, employees, plant and equipment as
may be prescribed from time to time without any demur, protest or contest or reservations. In
case of any discrepancy between statutory requirement and Safety Rules referred above,
the latter shall be binding on the Contractor unless the statutory provisions are more
a. Fatal injury or accident Rs. 1, 00,000/- : These are applicable
Causing death per person for death
b. Major injuries or accident causing Rs. 20,000/- : injury to any person,
25% or more permanent disablement per person whosoever.
to Workmen or employees
Permanent disablement shall have same meaning as indicated in Workmen’s Compensation
Act. The compensation mentioned above shall be in addition to the compensation
payable to the workmen/employees under the relevant provisions of the Workmen’s
Compensation Act and rules framed there under or any other applicable laws as applicable
from time to time. In case the Owner is made to pay such compensation then the
Contractor is liable to reimburse the Owner such amount in addition to the compensation
indicated above.
28.0 CODE REQUIREMENTS
The erection requirements and procedures to be followed during the installation of the
equipment shall be in accordance with the relevant Codes and accepted good engineering
practice, the Engineer’s drawings and other applicable Indian recognized codes and laws and
regulation of the Government of India.
Seal and signature of Contractor
SPECIAL CONDITIONS OF CONTRACT
This part of the Bid Document relates to certain specific/special terms and conditions particular
to the Contract. The provisions herein are to be read and understood in conjunction with the
relevant provisions elsewhere in the Instructions to Bidders (ITB), the General Conditions of
Contract (GCC) and Erection Conditions of Contract (ECC). The intent of provisions herein
are specific to this contract and are, in general, supplementary to related provisions under
ITB,GCC and ECC. However, in certain provisions which are contrary to those in ITB, GCC
and ECC, the provisions in these Special Conditions of Contract will prevail.
2.0 Tender Fee:
As per Mentioned in Tender Notice
3.0 Earnest Money Deposit (EMD):
As per Mentioned in Tender Notice
4.0 Declaration by Bidder:
The Bidder shall sign the Declaration enclosed to this SCC & submitted online and not
furnishing the same will make the Bid invalid.
5.0 Qualifying Criteria:
As per Mentioned in Tender Notice
7.0 Price Inclusions (including Taxes & Duties):
7.2 The prices quoted shall be all inclusive of freight, Octroi, transportation, loading, –unloading
& stacking at site of equipment materials received from construction store M e h s a n a
after observing all store formalities of GETCO .
7.3 No extra payment toward any type of templates and erection tools /materials will be made.
7.5 Goods and Service Tax (GST):
The F.O.R. Destination prices are excluding GST and Cess as applicable which will be paid extra
on a given taxable goods and/or services within the original contractual delivery period. The
amount and % of GST and Cess as applicable should clearly be indicated separately. (GST/Cess
means all applicable Tax/Cess under GST Laws. GST Laws means IGST Act, GST
(Compensation to the State for Loss of Revenue) Act, CGST Act, UTGST Act and SGSCT Act,
2017 and all related ancillary legislations).
You shall have to submit a C.A Certificate& duly authorized Signatory of successful bidder,
certifying that you have not claimed Refund of any applicable GST and Cess, charged to
COMPANY or shall not claim any such Refund, on a future date, from the concerned Authorities
and if, any Refund/Credit, in respect of such GST and Cess, is claimed by you, it will be
immediately passed on to the COMPANY, without COMPANY making any specific Claim, for the
same, either from the Department or from you.
Seal and signature of contractor
The offers having price INCLUSIVE OF GST and Cess is likely to be rejected if the rate of GST
and Cess is not mentioned clearly unless the bidder has opted for Composition Scheme under
GST Act, which should be clearly indicated in the price bid. COMPANY may at its discretion
consider such offer with presumption of highest applicable rate of VAT/GST/Cess prevailing
when the price quoted is inclusive of GST and Cess.
If the Supplier/Contractor has opted for the Composition scheme of GST, the same must be
clearly specified with valid Declaration & Certificate from Department. In the event of
withdrawal/cessation of the Supplier from Composition scheme during the tenure of the contract,
the rate mentioned in the price bid shall be final and any additional GST will have to be borne by
the tenderer. In no case additional amount towards tax or otherwise will be paid / reimbursed to
supplier/contractor. Further Statutory Variation clause will not be applicable in case of Supplier /
Contractor has opted for Composition Scheme under GST.
Supplier/Contractor should charge GST in Invoice at the rate as agreed to / mentioned in
acceptance of tender only and any deviation in the same shall not be accepted. Further, any
additional liability of GST (later on due to wrong mentioning of GST rate, mis-interpretation of
HSN/SAC Code, etc.) over and above as charged in the invoice shall be borne by the
Supplier/Contractor. However, any refund received by the supplier / contractor on account of GST
charged from the company; such refund shall have to be passed on to the company, along with
interest if any. Such refund along with interest needs to be passed on suo-moto by the supplier /
Further, the Company has a right to recover the amount of GST along with penal interest at the
rate of 15% per annum if GST charged is not paid / short paid to the government or fail to upload
the details or uploads inaccurate particulars on GSTIN portal by the Supplier / Contractor within
the stipulated time limit.
In case, Govt. revises the rate of GST rate / Code during the tenure of the contract, the provision
of GUVNL’s statutory variation clause shall apply.
Also, please mention separate applicable HSN / SAC Code and rate of GST and Cess as
applicable for each item of Goods/Service. If not specifically mentioned, then COMPANY will
have the option to take the prices as exclusive of taxes and duties at maximum higher slab rates
for the evaluation of the tenders.
Every bidder shall inform their GSTIN No. of the registered place(s) where from the bidder
intends to supply the goods / services, meaning thereby the bidder has to supply the goods /
services from the relevant declared / registered place of supply only.
INPUT TAX CREDIT BENEFIT
In the event of any statutory increase in the rate of Input Tax Credit and / or due to inclusion of
any other additional item of their inputs / input services under the ambit of the Input Tax Credit
provisions under the GST Act, subsequent to the date of submission of the offer, the same should
be passed on to COMPANY and you should inform such changes to COMPANY from time to
GST Compliances:
The GST at the applicable rates will be levied on the total of Schedule-B. GST on the work
executed will be subject to CGST Act, SGST Act, IGST Act, UTGST Act its rules, regulations
and notifications, circulars issued and in force time to time by Government and M/s. GETCO.
Contractors are required to clarify the product and services related HSN codes and SAC
codes respectively.
7.6 Statutory Variations:
Any statutory increase or decrease in the taxes and duties including GST and Cess as applicable
or in the event of introduction of new tax/cess or cessation of existing tax/cess subsequent to
Seal and signature of contractor
suppliers offer if it takes place within the original contractual delivery date will be to COMPANY’s
account subject to the claim being supported by documentary evidence. However, if any
decrease takes place after the contractual delivery date, the advantage will have to be passed on
Statutory Variation clause will not be applicable in case of Supplier / Contractor has opted for
Composition Scheme under GST.
1) As per the Welfare cess Act, the welfare cess @ 1% is applicable on supply and erection
items for supply, erection, testing & commissioning of substation, transmission lines,
EPC/Turnkey projects and civil works.
2) Contractor shall get registered under welfare cess Act before commencement of work. Office
of the factory inspector is authorized at present as a registering authority.
3) GETCO shall pay the welfare cess by way of reimbursing to contractors on production of
documentary evidence of payment.
4) The contacts for which supply or part supply of material are in the scope of GETCO, then
contractors shall deposit welfare cess on estimated cost of supplied items to GETCO
contractor on progressive basis of utilization. As this part of welfare cess is on GETCO
account, the same shall be reimbursed to the contractor on receipt of request letter along with
documentary evidence of payment. For calculation of welfare cess on supply part, valuation
as per MR shall be taken and informed to the contractor for payment. This will be over and
above the A/T value.
The modality of payment/ reimbursement of welfare cess will be as under.
• On receipt of A/T, the contractor / bidder will get them registered under Welfare Cess Act and
submit the documentary evidence to the concern office.
• Before release of payment of first R.A. Bill, the contractor has to submit the documentary
evidence of registration. Only thereafter, the bill will be processed for payment.
• Before release of payment of subsequent R. A. Bills, the contractor has to submit the
documentary evidence of payment of welfare cess of previous R.A.Bill.
• Before release of payment of final bill, the contractor has to submit documentary evidence of
payment of welfare cess of previous R.A. Bill as well as of this final bill.
• If the R.A. Bill happens to be first and final bill, then before release of payment, contractor
has to submit documentary evidence of registration under Welfare Cess Act and evidence of
payment of welfare cess.
• The welfare cess shall be reimbursed to the contractor on submission of copy of
documentary evidence of payment by observing due formalities.
7.18 Income Tax
Income tax at source at the prevailing rate will be deducted from bills in accordance with
the provision of Income-Tax Laws and to that effect a certificate will be issued to the
7.19 TDS under GST:
Tax deduction at source(TDS) under GST at the prevailing rate will be deducted from
bills in accordance with the provision of section 51 of the CGST Act, 2017, and to that
effect a certificate will be issued to the contractor.
8.0 SECURITY DEPOSIT
8.1 The successful bidder has pay security deposit within 10 days of receipt of order.
Seal and signature of contractor
8.2 The 5% of tender value will be required to be paid either in form of Demand Draft in favor of
“Gujarat Energy Transmission Corporation Limited” payable at Mehsana or in form of “Bank
Guarantee” on acceptance of tender as security deposit at Circle Office, Mehsana. The Security
Deposit will be paid within 10 days of receipt of LOI. FDR not accepted as security Deposit. Bank
Guarantee Format will be given from this office.
As per G. R. No. EMD/10/2020/42/DMO dated: 19.10.2020 of Finance Department, Govt. of
Gujarat, Gandhinagar GETCO accepts Bank Guarantee from the bidders for Security Deposit and
Earnest Money Deposit issued by Banks. In this regard, Finance Department, GoG has issued
above referred G.R. resolving that Government Departments and State Government Boards/
Corporations/ PSUs would accept Bank Guarantee towards Security Deposit and Earnest Money
Deposit issued by any mentioned in GR dtd. 19.10.2020.
9.0 GUARANTEE PERIOD:
Total work executed shall be covered under guarantee period against any defect in poor
workmanship etc. for a period of one year from the date of commissioning of substation.
9.0A BAR CHARTS
The Bidder shall furnish along with the bid, the bar charts and project schedules indicating
starting and completion dates of each activity. This is mandatory condition the tenders without
which shall be liable to be rejected.
10.0 PENALTY FOR DELAY:
10.1 The tenderer should note that the completion time allowed for carrying out the work should be
strictly observed. Any delay that may take place in work execution beyond Contractual cut off
date stated as per stipulated delivery period shall be subject to the penalty at the rate of ½ % per
week or part there of on delayed portion of the work subject to ceiling of 10% of total contract
value plus GST as applicable will be imposed.
10.3 In event of failure of the Contractor to pay the amount of Penalty as demanded, the Owner shall
be entitled to deduct the amount of Penalty for delay from the amounts payable to the
Contractors under any bills raised under this contract or anv other amount payable under anv
other contract with the GUVNL and its Subsidiary Companies i.e. GETCO GUVNL GSECL
MGVCL, DGVCL, PGVCL UGVCL. It is permissible for the Owner to adjust the amount of
Penalty of delay against any Bank Guarantee furnished by the Contractor under this contract or
any other contract with GUVNL and/or its subsidiary companies.
10.4 "RIGHTS OF THE OWNER:
Whenever any claim or claims for payment of a sum of money arises out of or under the contract
against the Contractor, the Owner shall be entitled to withhold and also have a lien to retain such
sum or sums in whole or in partfrom the security, if any, deposited by the Contractor andfor the
purpose aforesaid, the Owner shall be entitled to encash and withhold the amount of
Performance Bank Guarantee or other security, if any, furnished as the case may be. The
Owner shall also have a lien over the same pending finalization or adjudication of any such
claim. In the event of the security is insufficient to cover the claimed amount or amounts, the
Owner shall be entitled to withhold and have lien to retain to the extent of the such claimed
amount or amounts referred to above, from any sum or sums found payable or which at any
time-thereafter may become payable to the Contractor under the same contract or any other
contract with the Owner or GUVNL or its subsidiary companies pending finalization or
adjudication of any such claim lien in respect of Claims in other Contracts:
a) Any sum of money due and payable, to the Contractor (including the security deposit) under the
contract may be withheld or retained by way of lien by the Owner against any of its claim in
Seal and signature of contractor
respect of payment of a sum of money arising out of or under any other contract made by the
Contractor with the Owner or GUVNL or any of its subsidiary companies.
b) It is an agreed that the sum of money so withheld or retained under this clause by the Owner
will be kept withheld or retained as such by the Owner till its claim arising out of the same
contract or any other contract is either mutually settled or determined by the arbitrator or
competent court, as the case may be, and the Contractor shall have no claim for interest or
damages whatsoever on this account or on any other ground in respect of any sum of money
withheld or retained under this clause and as may be duly notified to the Contractor.
11.0 COMPLETION PERIOD
11.1 Overall Completion period for this Contract will be as per mentioned in Tender Notice from the
date of commencement for work.
11.2 No mobilization period, idling or stoppage period will be allowed during this period of the
11.3 The completion date will be deemed to be the date on which all works on the Contract are
demonstrated to be complete to the satisfaction of the /Engineer and is complete in all
respects as per the terms and conditions of this Contract.
12.0 Presentation of Bills
12.1 Monthly RA bills for 90% value of the supplied tower material and work executed
including cost of material consumed is to be prepared in triplicate and submitted to Site
Engineers in-charge of the work, for necessary payment. These bills shall be serially
numbered with suffix SE-I.
12.2 Balance 10% payment shall be released only after finalization of material account and
passing of final bill. The contractor has to submit the final bill along with the material
consumption statement and other required data of the work carried out within 3 months from
the date of completion of work. These bills shall be serially numbered with suffix SE-I.
12.3 All the bills in accordance with the above clauses must be submitted with the following
a) Item wise work done during billing period.
b) Item wise cumulative work done.
c) Account for material consumed and balance stock.
12.4 For non-submission or part submission of above information, an additional 5% amount of the
respective RA bill shall be withheld and shall only be released at the time of final bill.
13.0 Terms of Payment
The payment for work done shall be made as under only after execution of the contract
documents/furnishing of Security Deposit and on execution of substation erection work in
scope of work order.
13.1 For erection works.
(i) 90% payment of amount claimed covering various activity such as structure, equipment
erection, earthing installation, control wiring, battery charging etc. works against R.A. bills
duly certified by EIC within 60 days from the date of R.A. bill. OVER AND ABOVE THIS
PAYMENT TERMS MENTIONED ABOVE WILL BE APPLICABLE WHILE RELEASING PAYMENT.
(ii) Balance 10% of erection value shall be paid against completion of work only after
Settlement of material account statement of items used, erected and successful
Commissioning of transmission line the same amount will be release in final bill only
Seal and signature of contractor
and Payment will be made only after passing of final bill.
14.0 TAKING DELIVERY AND INSURANCE:
14.1 The contractor has to take delivery from Mehsana construction store of S/S equipment
and materials and keep in safe custody and transport to the respective sites and will be fully
responsible for any damage to or loss of all materials at any stage during transportation or
erection or taking over of the S/S by GETCO.
14.2 The Contractor has to open site store and ensure for safe custody of all the stored
materials at his own cost.
14.3 The Contractor shall have total responsibility for the entire materials stored, loose, semi
assembled and/or erected by him at site in his custody. The Contractor shall make suitable
security arrangements at his own cost to ensure the protection of all materials, equipment
and works from theft, fire pilferage and any other damages and loss. It shall be the
responsibility of the contractor to arrange for security till the works are finally taken over by the
14.4 MARINE-CUM-ERECTION INSURANCE:-
The contractor shall take suitable storage-cum-erection insurance cover at his cost to the extent of
100% cost of cost of sub-station / line materials, which are required to complete the sub-station /
line. Bidder shall have to take the comprehensive Marine Cum Erection (MCE) insurance policy
against any loss, damage, theft, pilferage, fire etc. for the complete period of storage, erection and
commissioning up to the time of taking over of the sub-station / line by GETCO. However, if the
work is not completed within stipulated time limit as mentioned into work order, the MCE shall be
extended by the contractor up to the work completion and taking over of line or SS by GETCO.
Moreover, the change for extension of insurance shall be borne by contractor if the delay is
attributed to the contractor. The charge for extension of insurance shall be reimbursed by GETCO
to the contractor on production of proof for extension of MCE if the delay is attributed on the part of
The contractor shall deal directly and pursue the claim with the insurance company and shall be
responsible in regard to maintenance of all insurance coverage as well as for settlement of claim.
The proof of insurance policy taken by the contractor shall be furnished / submitted to engineer-in-
charge of GETCO.
No material shall be issued to bidder/erection agency in absence of such insurance policy. The
risk shall be covered for lifting of materials from store to final handing over to GETCO. Further, in
absence of the above insurance policy, R.A. bill payment will be withheld.
14.5 In the event of any damage, theft, loss, pilferage, fire etc., Contractor will be responsible to
lodge, pursue and settle all the claims with the Insurance Company for all items,
materials and the shall be kept informed about it. Contractor shall replace the lost /
damaged materials / items promptly irrespective of the settlement of the claims by
underwriter and ensure that the work progress is as per agreed schedule. The loss, if any,
such replacement will have to be borne by the Contractor and will not entertain any claim
/ representation in this regard. However it will be contractor's responsibility to insure the
entire project till the S/S is taken over by the GETCO.
15.0 LABOR LAWS:
15.0.1 Labour below the age of 18 years shall not be employed for the work. No female worker
shall be employed in the night shift between 07.00 p.m. and 06.00 a.m. next day.
15.0.2 Contractor shall maintain a valid labor license under the contract Labor (Regulation and
abolition) Act for employing necessary manpower required by him. In the absence of such
license, the contract shall be liable to be terminated without assigning any reason thereof.
Seal and signature of contractor
15.0.3 The Contractor shall at his own expenses comply with all labor laws and keep the
indemnified in respect thereof. Some of the major liabilities under various labor and industrial
laws which the Contractor shall comply as under:
i) Payment of contribution by way of Employer’s Contribution towards provident Fund,
Family Pension Scheme, Deposit Linked Insurance Scheme, Administrative
charges, etc. at the rates made applicable from time to time by the Government of
Gujarat / Government of India or other Statutory Authority.
ii) Payment of deposit in respect of each contract labor at the rate of Rs. 30/- or later
prevailing rate with the Office of Commissioner of Labor as per the Contract Labor
(Regulation and Abolition) Act.
iii) License fee as prescribed under the Contract Labor (Regulation and Abolition) Act
and Rules framed there under depending upon the number of workmen.
iv) Paid leave facility and wages as per the provision of the Factories Act at the rate of
one day for every 20 days of working.
v) Identity cards as prescribed under the Factories Act with photo affixed thereto, for
identification.
vi) Payment of retrenchment compensation, Notice Pay and other liabilities as per
Industrial Dispute Act. Any payment to the Contractor’s employee arising out of any
claim of disputes under the Industrial Disputes Act 1947 or any other Labor Laws.
vii) Payment of compensation in case of accidental injury.
viii) Provision of crèche if the female laborers employed are more than
ix) Maternity Leave as per the provisions of the Maternity Benefit Act.
The above are some of the major liabilities of the Contractor in addition to other liabilities
prescribed under the various Labor laws, in force from time to time, from Statutory
Authorities like State Government/ Government o India, which the Contractor shall have to
15.1 PROVIDENT FUND AND FAMILY PENSION SCHEME:
The Contractor shall submit along with his bills (month wise) a statement regarding deduction
against employees Provident Fund and Family Pension Scheme in respect of each
concerned employee. Provident Fund and Family pension Scheme at the rate of 18% (or at
the rate made applicable by the Government from time to time of the wages. The Contractor’s
contribution and his workers contribution towards Provident Fund and Family Pension
Scheme shall be deposited by the Contractor with Regional Provident Fund Commissioner,
15.2 DEPOSIT LINKED INSURANCE SCHEME
The contractor shall have to deposit ½ % of the wages in respect of employees who is a
member of the Provident Fund, as the contribution to the Deposit Linked Insurance
Scheme with Regional Provident Fund Commissioner, Ahmedabad.
15.3 ADMINISTRATIVE CHARGES:
Administrative c h a r g e s for maintaining Provident Fund Account shall be deposited by the
Contractor with Regional Provident Fund Commissioner, Ahmedabad at the rates applicable.
15.4 PAID LEAVE FACILITY:
Paid Leave Facility at the rate of one day for every twenty days worked by the Contract
Labor, shall be provided by the Contractor to his workers. He shall maintain Leave Records,
Leave Cards, for individual laborer, which shall be duly verified, approved and certified by the
Seal and signature of contractor
authorized Officer of the GETCO.
15.5 WORKMAN’S COMPENSATION FUND AND EMPLOYER’S LIABILITY INSURANCE:
The contractor shall cover all his employees under workmen’s compensation fund and under
the liability insurance. The purchaser shall not be responsible for any payments of
compensation to the workers/supervisor of the contractor for fatal or non-fatal accidents during
the pendency of the contract.
15.6 The contractor shall employ adequate number of experienced skilled at site for daily
supervision and for maintenance of various registers and records required under the law
and contract. No payment f or supervision shall be admissible
15.7 CONTRCTOR TO INDEMNIFY THE GETCO:
The Contractor shall Indemnify the GETCO and every member officer and employees of
the GETCO also, Engineer-in-Charge and his staff against all actions, proceedings,
claims, demands, costs and expenses whatsoever, arising out of or in connection with the
matters referred herein above elsewhere and against all actions, proceedings, claims,
demands, costs and expenses which may be made against the GETCO or Government for
or in respect of performance of his obligation under the contract documents. The GETCO
shall not be liable for intervention of authority Government for or in respect of performance of
his obligation under the contract documents. The GETCO shall not be liable for or in respect
of or in consequence o f any accident or injury to any workman or other person in the
employment of the Contractor or his Sub-Contractor and the contractor shall indemnify and
keep indemnified the GETCO against all claims, demands, proceedings, cost, charges and
expenses whatsoever in respect thereof or in relation thereto.
15.8 WORKMEN’S COMPENSATION AND EMPLOYER’S LIABILITY INSURANCE
Insurance shall be affected for all the Contractor’s employee engages in the performance of
this contract. If any of the work is sublet, the Contractor shall required the Sub-Contractor
to provide workmen’s
employer’s liability insurance for the latter’s employees, such employees shall be covered
Contractor’s Insurance.
15.9 WAGES TO BE PAID & TIME OF PAYMENT ETC. BY THE CONTRACTOR
a) The Contractor shall pay minimum wages per day to his Labors/ Workers as per rates fixed
under the minimum wages act. The wages of every Contract Labor employed by him under
this contract shall also be paid by him before the expiry of 7th day of the last day of the month
in respect of the wages are payable (i.e. wages of a month have to be paid by him in the
first week of the next
month). Any default will result in cancellation of contract forthwith or else the contractor shall
be punishable to the extent of Rs. 100/- per each day or as per the prevailing rules of Labor
b) The Contractor shall give his Telephone Number and Address to the GETCO, so that, in
case of Labor trouble etc. the Contractor can be contacted. The Contractor shall arrange to
have his office outside the factory work premises and the Contractor shall arrange to have
his office outside the factory work premises and the Contractor shall keep himself present
throughout the working hours.
15.10 REGISTRATION WITH PROVIDENT FUND OFFICE
I) The separate P.F. code issued from P.F. commissioner is required to be taken by
Seal and signature of contractor
ii) If the contractor does not possess separate P.F. code number of RPFC, his tender
will not be considered for acceptance.
iii) The contractor should mention separate P.F. code number allotted by PPFC, along
with the tender.
15.11 Termination of Contract:
In case of contractor fails to deliver the stocks or any consignment thereof within
contractual period of delivery or in case the stores are found not in accordance with
prescribed specification and/or the approved sample, the shall exercise its discretionary
15.11.1 To recover, from the contractor as agreed, by way of penalty clause above, or
15.11.2 To purchase from elsewhere after giving due notice to the contractor on account and at
the risk of the contractor for such stores not so delivered or other similar description
without canceling the contract in respect of the consignment not yet due for delivery or
15.12 To cancel the contract.
In the event of the risk purchase of stores of similar description, the opinion of the
GETCO shall be final. In the event of action taken under clause (A) or (B) above, the
contractor shall be liable to pay for any loss which GETCO may sustain on that account,
but the contractor shall not be entitled to have any saving on such purchases made
against default.
The decision of the GETCO shall be final as regards to the acceptability of stores supplied
by the contractor and the GETCO shall not be required to give any reason in writing or
otherwise at any time for rejection of the stores.
15.12.1 MATCHING OF END COST:
In case the GETCO decides to award contract on matching end-cost basis, the bidder has
to reduce all the quoted rates proportionately. The reduction on overall basis will not be
accepted (i.e. all unit rates o f erection schedule shall be reduced proportionately by
difference in percentage). The confirmation for matching end cost shall be given within
(seven) days from the letter form.
16.0 VENDOR REGISTRATION: REGISTRATION AS A CONTRACTOR:
Registration with Mehsana or any other GETCO office is pre requisite for
participating in tender. It is required to furnish documents of registration along with
offer in Technical bid and the details at appropriate place in confirmation of details of
bidder shall be given by the contractor.
Seal and signature of contractor
TENDER NO. MTC/062026/n-41
Sub. : Erection of structure, equipment, control wiring, yard Lighting, Control-
Room & Staff-Quarter Electrification etc. at 66 KV Dediyasan GIDC Sub Station Ta:
Mehsana, Dist: Mehsana.
In connection with above subject, I / we confirm the following:
a) I/ we, the undersigned, have read and understand the Tender Specification For Work of
Erection of structure, equipment, control wiring, yard Lighting, Control-Room &
Staff-Quarter Electrification etc. at 66 KV Dediyasan GIDC Sub Station Ta: Mehsana,
Dist: Mehsana. Complete with the entire tender Terms and Conditions.
b) The price in the bid is firm prices in line with Tender Specifications and shall stand valid till
completion of the Contract, if awarded.
c) I/We declare that our bid is strictly in line with Tender Specifications and there is no deviation.
Further, I / we also agree that additional conditions / deviations, if any found in bid, the
offer shall be out rightly rejected without assigning any reason thereof.
Signature of Authorized
representative of Company / Agency
Seal and signature of contractor
CONFIRMATION OF DETAILS OF BIDDER
Bidders are required to furnish following information specifying YES / NO
1) Whether the Bid is on percentage basis as called for. Yes / No
2) Whether rebate furnished is in percentage for. Yes / No
basis as called
3) Whether the Bid is submitted by RPAD. Yes / No
4) Whether all pages of Bid Specifications are Yes / No
sealed and signed by the Bidder.
5) a) Whether the Bidder is registered with for Yes / No
b) In case of “Yes”, please furnish
following details:
i) Registration Letter No. &
date. ii) Class of Registration
c) Whether Bidder is having PF Code No. Yes / No
6) a) Whether EMD paid. ( DD / BG ) Yes / No
b) In case “Yes”, furnish details
7) Whether following documents as specified are submitted.
a) Human Resources detail. Yes / No
b) Availability of tools, equipments etc. Yes / No
c) Details of orders executed / on hand Yes / No
d) Financial capability. Yes / No
e) Experience as specified. Yes / No
f) Latest Income-tax certificate Yes / No
g) Company's Articles Of Association Yes / No
h) Details Of Partners / Directors Yes / No
i) B.R./P.A. Authorizing Person Yes / No
j) Power of Attorney of Consortium Members Yes / No.
Signature of Authorized Representative of
Name of tendering
Seal and signature of contractor
Part II – GENERAL INFORMATION
1.1. SCOPE OF WORK
This specification covers the storage and handling at site, erection, testing, commissioning
and handing over in ready to switch on condition to GETCO of complete equipment /
accessories. of Erection of structure, equipment, control wiring, yard Lighting,
Control-Room & Staff-Quarter Electrification etc. at 66 KV Dediyasan GIDC Sub
Station Ta: Mehsana, Dist: Mehsana etc., as per the Schedule-B and as per approved
2.0 INSTRUCTIONS TO THE BIDDER (TECHNICAL) :
2.1. CODES, STANDARDS & REGULATION
2.2. DOCUMENTS REQUIRED FOR APPROVAL:
2.3. FOR REFERENCE
2.4. AS- BUILT DRAWINGS
The successful bidder will give guarantee for the equipments for its workmanship as per
2.6. FUNCTIONAL AND COMPOSITE TESTING
Following test shall be conducted on equipment after completion of erection in the presence of
-in-charge from point of view of completeness in the presence of’s Authorized Representative.
1 Visual inspection of total system.
2 Verification and measurement of earthing resistance.
3 Checking of cable terminations and laying, dressing etc. in the equipment kiosk and
control panels.
4 Checking of safe accessibility of components.
2.7. BAR CHARTS
The Bidder shall furnish along with the bid, the bar charts and project schedules indicating starting
and completion dates of each activity.
Seal and signature of contractor
TECHNICAL PARTICULARS FOR
Erection of structure, equipment, control wiring, yard Lighting, Control-Room & Staff-
Quarter Electrification etc. at 66 KV Dediyasan GIDC Sub Station Ta: Mehsana, Dist:
3.1.1 The scope for erection works covered under this section consist of :
i) Taking delivery of equipments and other material from the GETCO’s stores,
checking them, transporting to site's stores and keeping in safe custody by
ii) To take suitable storage-cum-erection insurance of equipments/materials
issued by the GETCO.
iii) Distribution of all materials to erection site.
iv) Structure/Equipment erection including fixing of attachments, accessories
and tack-welding of structures.,
v) Stringing of ACSR/AAAC T w i n M o o s e / Z e b r a conductor bus with fixing of
insulators, Hardware, dampers, spacers etc.
vi) Workmanship guarantee of all the activities carried out from (i) to (v).
3.1.2 The successful Contractor shall carry out all addition/alteration required to complete
the substation for commissioning.
3.1.3 The GETCO will supply equipments, structure materials, bolts-nuts, structure accessories
/ attachments, insulators, insulator-hard wares, conductor, accessories, ground
wire, ground wire accessories, GI Earthing strip, Control cable etc. required for
erection of equipments and other associated works.
3.1.4 All works shall be carried out in accordance with the revised and latest Provisions under
Indian Electricity Act and Rules made hereunder.
3.1.5 The contractor at his own cost shall arrange all the erection tools required
during execution of work. The Contractor solely is responsible for any damage and /
or loss of his erection tools.
3.1.6 The Contractor shall be fully responsible for completing all the above works till
the complete substation is taken over by the GETCO, and thereafter up till guarantee
3.1.7 The methods of erection are not dealt with in detail but are left to the Contractor who
shall exercise his own judgment with regards to actual handling of equipments &
materials and in deciding upon the best methods to be adopted for all the erection
3.1.8 The successful bidder shall carryout all the erection works in accordance with structural
drawings, and other erection drawings etc. provided by the GETCO.
3.2.0 LAYOUT OF SUB STATION
3..2.1 The proposed layout of the substation is available with concerned field office. The
bidders are presumed to have acquainted themselves with the site before submitting
3.2.2 The successful bidder has to collect from concerned field office the detailed layout
drawing along with the following drawings for the substation duly approved by the
GETCO immediately on receipt of the Order. He shall also arrange visit of proposed site
Seal and signature of contractor
jointly with GETCO’s representative for important marks coming across the scope of
works under the contract. Structural drawings of 66 KV Structures listed at Schedule –B
3.3.0 TECHNICAL INSTRUCTIONS TO THE BIDDER
3.3.1. The works shall be carried out strictly as per the erection manuals and shall fully
comply with the relevant Indian Standard. The IE rules and Acts in force from time to
time shall also be applicable during pendency of the contract.
3.4.0 ERECTION AND COMMISSIONING TOOLS & TACKLES.
3.4.1 The contractor shall provide all tools/tackles jigs and fixtures winches, alignment
tools, welding sets, breaker handling devices all consumable items and construction
equipment as required to install the equipments and to complete the work in all
respects and shall necessarily include (but not limited to ) bolts, nuts, rivets, welding
rods, shims, wedges, packing sheets, packing compounds, oil installation and
protection of individual equipment in storage and during erection.
3.4.2 This shall also cover proper alignment, tack welding tagging, laying marking of and
connection of cables, fabrication supply and installation of all support structures for
installation of various electrical equipment and cables
3.4.3 Provision of cable glands, ferrules, and cable lugs tags sealing kit (for HT cables)
shall also be arranged by the contractor.
3.4.4. Erection of various equipment shall be done strictly as per manufacturer's instructions
3.4.6 All additional iron framework erected to put the equipment in operational condition
shall be provided with two coats of primer and two topcoats of finish paint.
3.4.7 Special care shall be taken to make the enclosed equipment protected against
entry of rates, lizard, and creeping reptiles, which may create electrical short circuits.
3.5.0. COMPLETION OF ERECTION (GENERAL)
3.5.1. Equipment shall be considered to have been completely erected when the
following activities have been completed.
3.5.2 Moving of all equipments to the respective foundations
3.5.3. Fixing of anchor bolts or tack welding as required.
3.5.4 Leveling and alignment of equipment.
3.5.5 Assembling of all accessories such as relays, CTs, PTs, meters instruments etc.
as described in the job specifications.
3.5.6. Drying of equipment as required and testing of oil for dielectric strength.
3.5.7 Filtration and filling of oil as required.
3.5.8. Cable laying, termination with continuity checks.
3.5.9. Applying of finishing coat of pain wherever required.
3.5.10. Mounting of lighting fixtures & connections.
3.511. Testing of all system with operation of all protection system.
3.60 ERECTION OF SWITCHYARD STRUCTURES.
Seal and signature of contractor
3.6.1. Erection o f s w i t c h y a r d s t r u c t u r e s h a l l m e a n e r e c t i o n o f g a n t r y
c o l u m n , beams, equipment support structure and lighting mast, VHF
masts, watch and ward observation posts if any.
3.6.2 The foundation work of switchyard structure is not in the scope of this tender.
The foundation with concreted anchor bolts shall be made available by well in
time to enable the contractor of this work to get a clear working front.
3.6.3. The switchyard structure shall be made available to the contractor in the knocked
down condition either at site or from any other store of in the radius of 100 KMs.
Small parts like cleat, plate fasteners step bolts and other accessories (if any) shall
also be supplied as above separately
3.6.4. Before commencement of the erection work, the contractor shall check
cast foundations and anchor bolts for their individual and mutual distances and also
for the correctness of concreted bolts in terms of number and verticality. In case of
any disagreement with the lay out drawing, the matter may be referred to
Engineer in charge for remedial measures who in turn will arrange such
remedial measures. However, the contractor shall also render necessary assistance
3.6.5. The erection of structure shall be done strictly as per the approved set of
structural drawings to be given by the . The erected column for bringing the
structure in alignment or bringing the structure in plumb shall be allowed.
3.6.6. The erection of column/beams shall be done in phased manner on already
erected column. The elevation faces of the beam should be first fastened to the
column one by one and thereafter plan bracings should provide one by one to
complete the beam geocentric Pre-stressing of beam member for alignment
should be avoided. In case of difficulty in fabricated material or otherwise, the
Engineer in charge should be contacted for remedial measures who in turn will
take necessary action. However the contractor shall also render necessary
assistance in this work to Engineer in charge for speedy completion of work. The
load point’s rings bracing shall also be provided as per drawings.
3.6.7. The Cross-connected beams should be perfectly at right angle and matching
with respective faces of the column. No column or beam shall be erected with
missing members.
3.6.8. The method of erection is not being dealt with in detail here. However, while
making the rigging arrangement, it should be ensured that no column beam or
part thereof is damaged due to misjudgment. All the members, plates, cleats, bolts,
buts and other accessories should be fitted to the column, beam support structure
as per the approved drawing.
3.6.9. After the erection of beam and column, the bolt nuts should be properly tightened
and center punched. The thread protruding bolt should be dented in the contact
surface of nut at 3 point 120 degrees apart to eliminate loosening of bolt due to
vibration. The stringing of bus bar conductor be done only after getting certificate
from Engineer. in charge that all bolts &nuts are provided as per approved drawings
3.6.10. The equipment support structure should also be erected like gantry column.
They should well be in plumb with all members fitted as per approved drawings
and bolt nuts properly tightened. The contractor shall also take care to see that the
alignment of foundation of equipment support structure is well done. The
equipment support structures shall be erected as per the approved drawings.
3.6.12 CABLE TERMINATION BOX :
1. Cable termination box for gantry structure shall be completely weather proof confirming to ISW
55 and provided with lockable door and HRC fuse mounted on fuse carrier and fuse base
assembly. The terminal shall be stud type and suitable for two Nos. 4mm2 cable necessary
arrangements for glanding cable along with supply of gland are included in tender scope.
Seal and signature of contractor
2. The bolts nuts and screw required for erection is to be supplied by the contractor at his own
3. Outside and inside the cable terminal boxes will be furnished in two coats light grey colours.
4. Finished painted appearance on equipment shall aesthetically pleasing appearance free from
dots and uneven surfaces.
5. Touch up paint at site shall have to be done if necessary.
3.8.0 ERECTION OF SECONDARY EQUIPMENTS.
3. 8.1. The secondary equipments like PI, CT, CVT, PT, LA (Surge arrestors) wave trap
etc. shall be procured by the contractor from the site store centre or other store
centers of the and transported to the site at the cost of contractor. The contractor
shall also do loading and unloading of the equipment.
3.8.2 After the arrival of equipment at site, packing shall be gently removed without
causing any damage to the equipment. The equipment shall be checked for its
correctness of dimension, make etc. as per the approved drawing. The
equipment then shall be cleaned by a piece of cloth and made ready for erection.
3.8.3. The equipment shall be mounte3d on the ready pedestal (of masonry) or steel
structure as the case may be and checked the same for its verticality.
Construction of masonry pedestal is not in the scope of this work.
3.8.5. In case of CT, PT and CVT, the junction box or terminal box of the equipment shall
be opened, cleaned and all their connections should be checked.
3.8.6 The arcing horns or corona control rings shall be provided as per the
approved drawing. Similarly all fittings etc. shall also be provided as per the
approved drawings
3.8.7. The electrical connection of the equipments through jumpers or through 4"
aluminum pipe shall be carried out along with the cable connection of respective
equipment to the marshalling kiosk or to the control relay panels. The
connection of high voltage terminal of equipment shall not be resorted to, unless
secondary connection or cabling work to control equipment is over. Testing of
equipment shall also be done to ensure the correct wiring sequence of the
equipment and continuity before energizing equipment by EHV
3.8.8. Polarity of the equipment to be connected on HV side should be checked
prior to erection. The oil level( if any) of the equipment should be checked for its
totality. If level is found to be inadequate, topping filling of oil should be resorted
. The willl supply the quantity of oil required.
3.8.9. Fuse, links, etc provided in the secondary box of the equipment shall be
checked for their position and continuity and any lacuna observed will be set right
before taking the equipment for commercial use.
3.9.0 ERECTION OF CIRCUIT BREAKER :
3.9.2. The circuit breaker shall be taken delivery from the site/other stores of and
transported to the work place well in time on loading/unloading. The crates
containing the insulators and important parts and accessories shall be opened
carefully keeping them in their proper position. Insulator parts and other
accessories shall be thoroughly cleaned for any deposits of dust or other particles.
3.12.3 The breaker shall be brought on the pedestal of masonry or steel frame as the
case may be) in upright position without any inclination. The main parts of the
equipments shall be assembled as per approved drawing to be submitted by the
GETCO to arrange Service of commissioning engineer of circuit breaker
manufacturer. However, the contractor will not remain contended with the
instruction and guidelines given by the commissioning engineer and shall also use
his own judgment in better erection of commissioning practice of circuit breaker.
3.12.4 After the placement of circuit breaker in position the kiosk of the breaker shall
Seal and signature of contractor
be thoroughly inspected and any lacuna found shall be reported to the Engineer in
charge of the work. The HT terminal connection shall be done only after the
terminals of the equipment kiosk are made to the marshalling kiosk and or to the
control/relay panels.
Polarity of the equipments shall also be ensured before physical erection.
3.12.5. The method of erection of breaker is not dealt with in details; however, it
is recommended that breaker poles shall be erected only by using telescopic
crane or other suitable mechanical arrangement. The rigging should be tool proof.
3.12.6. The operating mechanism in the breaker Kiosk and contacts as well as the
power supply circuits (AC/DC) shall be properly checked for its operation
worthiness. All piping for gas/air shall be laid as per the approved drawing.
The air receiver or compressor shall be positioned as per the relevant
drawing. Minor fittings and fabrication or grouting work required to place these
articles or accessories shall be done by the contractor without any extra cost to the
purchaser. In case of breakers with spring mechanism the trials of the mechanism
by actuating should be done to ensure its' line worthiness.
3.12.7 EHV side of the breaker should be aligned to a incoming and outgoing bus conductor.
While erecting the breaker, the operating mechanism without the porcelain
insulator should be laid perfectly to avoid any mal functioning of the breaker.
3.12.8. Earthing points of the breaker as well as attached Kiosk shall be connected to earth
grid by means of risers already available nearby the equipment. Any other erection
checks and pre-cautions indicated in the Manual furnished by the respective supplier
of the equipment shall be studied well by the contractor and the provisions there of
shall be implemented as far as possible.
3.14.0 ERECTION OF ISOLATORS.
3.14.1 Isolators of the switchyard shall be with or without earth blade type. centre breaks type
etc.The isolators shall be procured by the contractor from the site stores of the and
transported to the work site. All the spare parts shall be properly unpacked cleaned and made
ready for erection.
3.14.2 Before erection, the contractor shall obtained copies of approved drawing of
respective equipments. The isolators shall be erected on the ready galvanized
structures. However, foundation for them will be available readily the respective points in the
3.14.3 The contractor shall check the erected support structure for their alignment vertically
and tightness of fasteners before mounting the isolators parts on them. The contractor
shall also verify the mounting arrangement for the operating mechanism on this structure
and suitable for the same. In case of any shortcoming the matter may be reported to engineer
in charge. Any modification of trivial nature for the structure of fixtures shall be carried out
3.14.4 The parts of the isolators, fixed and moving contacts earthing rode etc. shall be handled very
carefully to avoid breakage or distortions. The erection shall be carried out using mechanized
erection tools. The polarity of the isolator polls shall be properly identified and also the
direction of the opening should be pre-determined. It should be ensured that in the entire
switchyard the isolator open and close uniformly (direction point)
3.14.5 The operating mechanism for the line contacts shall be thoroughly checked for their
accessories as per approved drawing and it should be ensured that all the
connection fuses links dehumidifiers lighting sockets electric motors are in their proper
position. Any deviation from the approved drawing should be got sat right with the help of
engineer in charge. Position. Any deviation from the approved drawing should be got set
right with the help of Engineer-in- Charge.
3.14.6 While erecting the isolator, it should be ensured that it should be properly aligned with
respect to bus conductors or line conductor bus provided in the switchyard: The erected
Seal and signature of contractor
Isolator shall be within the plumb. The operating mechanism rods, pole and rotating
insulators shall be checked for their proper function. The testing of the wiring to the kiosk
should also be done to ensure its operation worthiness. The final commissioning of the
isolator should be done only after connection to control panel is affected. However
prior to that it should be ensured that the physical movement of the fixed and moving
contacts and reach of them is within the prescribed limit.
3.15.0 ERECTION OF CONTROL AND RELAY PANELS.
3.15.1 The contractor shall procure the control and relay panel from site store or any other
stores of the GETCO and transport the same to the erection site. The cases containing the
panel shall be unpacked carefully and shall be nicely cleaned. In case any of external
damage is observed, same shall be brought to the notice of Engineer In charge. The
panel shall be unpacked in upside up position. After an external visual inspection, the
panel door shall be opened and checked for the circuit connection, terminal connector,
dehumidifier, power connection etc.
3.15.2 A front side of the panel shall be checked for any damage to the meter indicator, hooter,
and semaphore indicators
3.15.3 Any lacuna in the equipments, circuits, fittings, dimensions etc. observed shall be brought
to the notice of Engineer in charge who will try to impose remedial measures
3.15.4 The relay panel should also be checked for type, of schemes adopted for protection, internal
connection, fascia indicator etc. Any difference observed should be brought to the notice of
Engineer in charge who will take necessary action.
3.15.5 The panel shall be erected along cut outs provided in the slab concrete, in the order,
it is decided, by Engineer in charge or which is approved by authorized drawing.
3.15.6 The size and number of cores of cables be brought from the equipment to control panel,
control panel to relay panel and back to equipment shall be pre-determined by study.
3.15.8 After the erection of control panel and relay, panel, all the equipments, accessories
indicators etc. along with the internal wiring and other accessories provided with the kiosk of
3.16.0 LAYING OF CONTROL CABLES AND TERMINATIONS THEREOF
3.16.1 Laying and termination of control Cable work shall generally Includes following:
a) Control and power cable from individual equipments kiosk to the field kiosk.
b) Laying and termination of Control and L.T power cable from field -kiosk to control
room equipment (i.e. LT switchgear, DC battery and control panel/relay panel.)
c) Laying and termination of Cable from the transformer kiosk to transformer panel and up
to AC/DC supply source.
d) Laying & termination of Control cables from control panel to relay panel and vice a versa.
e) Laying & Termination of cable from DC/AC source, battery room L/T switch gear room
to control/relay panel.
g) Laying & termination of cable from 11KV/400 V Distribution transformer to LT switch gear
Seal and signature of contractor
h) Laying & termination of cables from Station transformer to distribution transformer in
the switchyard as well as in the residential. Quarter area.
I) Laying & termination of LT power cable from station transformer to fire protection system
kiosk (If required).
3.16.2 GETCO will provide the cable schedule for the various control schemes, protection
schemes and metering scheme as well as communication, scheme etc.
3.16.3 ‘The contractor shall procure’ the required size of control and power cable from the
purchaser’s site store to any other stores from where the same allotted and transport it to its
3.16.4 The control cables shall be terminated using correct type of lugs and further prodded
with ferules giving the identification number of various cores of the cable. Correct type of
tools for termination shall be used to secure a rigid connection of the cable tray along with
the cable trenches. Normally mild steel, racks and cable trays are provided in the cable
trench. However, the purchaser may it its’ own discretion prefer to utilize fiber reinforced
poly propylene (FRP) cable racks and trays. In such an event, the racks and trays will be
supplied by the Purchaser to the contractor in a knocked down condition. The contractor
shall assemble the rack and provide trays on them as per the approved drawing given by
the purchaser. If FRP trays and racks are to be utilized, the contractor will have to take
extra care while laying the cable through different layer and racks to avoid any
displacement or distortion of the FRP racks. However, if the laying of pre-fabricated FRP
racks and trays fall in the scope or FRP rack/tray supplier, the contractor shills co-ordinate
and synchronize his cable laying activities with respective supplier of FRP rack/trays.
3.16.5 Utmost care shall be taken by the contractor to prevent damage to outer insulation
and the armors of the cables. No joint to the cable shall be permitted. Unless situation so
warrants and Engineer in charge permits the same.
3.16.6 After .laying, all the power and control cable shall be properly identified giving the both
a number and details of end connections.
3.18.1 The Contractor shall ensure that at the end of each sub-activity the
Surplus materials are immediately removed from the work-site and the surplus
excavated earth is spreader around to avoid loss or injury to the
public/equipments.
3.18.2 The Contractor has to return all surplus materials after reconciliation of
material account in good and useable condition. The contractor shall settle the
final bill including signature on all relevant papers required for passing of final
bill, excess/saving statement and time limit extension proposal. If any within
three months from the date of charging/commissioning or taking over by the
GETCO of the Sub Station.
3.18.3. Most of all equipments should be erected in presence of the concerned
engineer from OEM/GETCO Engineer.
3.18.4. After complete erection and operation, contractor's supervisor should attend
the site whenever called from GETCO for further testing commissioning of
equipments/panels etc.
3.16 MAINTENANCE FREE TREATED EARTHPIT
Seal & Signature of Bidder - 69 -
Seal and signature of contractor
The bidder shall have to do the entire work of earth pits required for equipment earthing and
for the pits at the corners of earth mat.
The product and the equipment covered by this specification shall, unless otherwise
specifiedbe in line with the requirement of any of the latest applicable standards and will
apply in order of priority as listed below:-
a) Indian Standards
c) ANSI (American National Standards)
d) BS (British Standards)
All the Earth Pit shall be with special Ground electrodes supplied by Reputed Manufacturer.
These special electrodes are provided with Ground enhancement material.
A. EARTHING PRODUCT COMPONENT SPECS
- The Earthing System should be based on use of Copper Bonded Earth Rods / Pipe electrode/PIP
electrode (for corrosion resistance) and Ground Enhancement Material (to reduce Soil Resistivity).
- It should be capable of providing any ohmic value as specified by the client, by interconnection of
ground rods to form a Grid.
- The system shall be totally maintenance free and require no periodic or scheduled maintenance
for a period of at least 30 years.
- There shall be no requirement to add water or any other chemical any time after initial
- There should be no requirement to have a inspection/maintenance chamber. The system shall
provide constant low ohmic value for entire life cycle without any consideration for moisture or
temperature conditions.
- The system shall be in use world wide for a period of at least 20 years.
- The manufacturer shall be a company of international repute engaged in the field of Facility
Electrical Protection work.
(1) COPPER BONDED EARTH RODS
- The Earth Rods shall have a nominal (actual) dia of 20mm (Min.) and length of 3 M.
- The Rods shall have a steel core with molecular bonding of 250 micron of copper as per
international standards.
- A nickel layer is applied to steel core (and subsequently copper) by an electrolytic process
forming a metallurgical bond between the three.
- The copper used shall be type DHP alloy No. 122 CDA and rated at 99.95% copper. The
thickness of copper layer shall be uniform 250 micron.
- The Rods should be manufactured by a company of high repute to ensure quality of
Copper Bonding.
- The Rods should have been subjected to long term study to verify the claims of corrosion
resistivity made by the manufacturers
(2) PIPE or PIP (Pipe-In-Pipe) ELECTRODE
- It shall be capable to carry out the fault current as per GETCO standard considerations.
- It should have been subjected to long term study to verify the claims of corrosion resistivity
made by the manufacturers.
C. GROUND ENHANCE MENT MATERIAL / BACK FILL / GROUNDING
- Ground Enhancement Material/ Backfill / Grounding compound shall be permanent and
maintenance free. (No re- charging with salts or any other chemicals) and shall maintain its
earth resistance with time.
- Ground Enhancement Material/ Backfill / Grounding compound shall confirm IEEE 80-
2000 Clause No.14.5 (d)
- It must set up firmly and not dissolve or decompose or otherwise pollute the soil or the local
Seal and signature of contractor
Seal & Signature of Bidder - 70 -- It shall be suitable for use in dry form or slurry form.
- The Ground Enhancement Material/ Backfill / Grounding compound shall not depend on
the continuous presence of water to maintain its conductivity.
- Ground Enhancement Material/ Backfill / Grounding compound in its set form shall have a
resistivity of not more than 0.12 ohm-m.
- The material should have been subjected to long term study to verify the claims made by
manufacturers about its soil resistivity reducing qualities.
- The material shall have been tested in a reputed laboratory for not containing any
hazardous chemicals as per EPA Chapter-7.
- The material shall be carbon based conductive concrete and shall not contain bentonite in
- The bottom 300 mm of the bore hole shall be filled with good quality preferably black
cotton soil. The balance length of the bore shall be filled entirely with the backfill
compound in pure form without mixing with soil. The compound shall bond tightly with the
electrode and become a solid mass.
- Each Earth Rod/pipe must be provided with a suitable clamp to facilitate Inter-connection
of rods and connection to Equipment Earth Bar using appropriate copper/GI strip or
The product shall be guaranteed for trouble free operation for a period of 30 years from date
of commission or arrival at site which ever is later. Any defect discovered during this period
shall be rectified free of charge. The pits shall be drawn with the help of a boring machine,
an auger or any other means as required by site conditions and nature of ground strata.
Drawing No. GETCO/E/STD/P-021 (1 of 2 & 2 of 2), DTD.30.07.14 shall be used for
Important Note:
Terms “CI Pipe Electrode” and “Treated Electrode” shall be replaced by “Maintenance
free Treated Earth pit” wherever written in Earthing Philosophy as well as applicable
equipment earthing drawings.
3.17.1 The Contractor shall ensure that at the end of each sub-activity the
Surplus materials are immediately removed from the work-site and the surplus
excavated earth is spreaded around to avoid loss or injury to the
public/equipments.
3.17.2 The Contractor has to return all surplus materials after reconciliation of material
account in good and useable condition. The contractor shall settle the final bill
including signature on all relevant papers required for passing of final bill,
excess/saving statement and time limit extension proposal. If any within three
months from the date of charging/commissioning or taking over by the GETCO
of the Sub Station.
3.17.3. Most of all equipments should be erected in presence of the concerned engineer
from OEM/GEB engineer.
Seal & Signature of Bidder - 71 -
3.17.4. After complete erection and operation, contractor's supervisor should attend the
site whenever called from GETCO for further testing commissioning of
equipments/panels etc.
3. 18.0 WASTGES:
3. 18.1 The contractor shall make every effort to minimize the breakages, losses and
wastages of line material etc. supplied “ Free of cost “ by the GETCO for line
3.18.2 The maximum ceiling for wastages permitted is as under:
Seal and signature of contractor
The maximum ceiling for wastages permitted is as under:
Sr no Item % Wastages permitted (Max.)
1 conductor & earth wire 1/2 % (for jumpering & sag)
2 conductor & earth wire 1/2% ( for credit s scarp of cut
(from 10 mtrs up to 30 mtrs)
3 conductor & earth wire 2 % ( for credit in pieces s good
from > 30 mtrs up to 100 mtrs)
4 Insulators 1/4 %
Seal and signature of contractor
Following material will be supplied b y GETCO “free of cost” for “ Erection of structure,
equipment, control wiring, yard Lighting, Control-Room & Staff-Quarter Electrification
etc. at 66 KV Dediyasan GIDC Sub Station Ta: Mehsana, Dist: Mehsana”
1) G I Structures, accessories, attachments bolts-nuts, Angle, channel etc.
2) Conductor, conductor accessories, earth wire, earth wire accessories.
3) Insulators, insulator hardware’s.
4) 66 KV /11KV/LT equipments with accessories and control and relay panels
5) Various sizes of armored control cables for control wiring of equipments.
6) Earthing materials like GI Strips. Galvanized wire etc.
7) 11KV Power Cable.
8) 11KV Indoor Cable Termination Kits if available with GETCO.
9) MS Girder, Channel, Angle sections for fabrication of various supports as included in
respective items.
10) If available than 11KV single phasing switches, 11KV GO switches, 11KV LA, 11KV DO
Following materials / equipments will be procured / arranged by the contractor activities
for Erection of structure, equipment, control wiring, yard Lighting, Control-Room &
Staff-Quarter Electrification etc. at 66 KV Dediyasan GIDC Sub Station Ta: Mehsana,
1) Tools tackles required for Sub-Station erection activities and stringing.
2) Earthing materials filter machine, hydraulic crane and hydraulic jointing
machine/welding machines. GI pipe, coal, salt etc.
3) Wherever necessary cement, sand, metal, water for concreting works.
4) All required material for Colony & Yard Lighting, Control-Room Industrial Electrification
and Staff-Quarter Residential Electrification work except GI angle required for fabrication for
fixing of ICTPN.
Seal and signature of contractor
Sus-Station Equipment/Material will be issued from following Store Centers.
Sr. Name of Sub Station. Store Centers for issue of
No. S/s materials.
1 Erection of structure, equipment, Mehsana/R&M store
control wiring, yard Lighting, Control- Soja and any store of
Room & Staff-Quarter Electrification the GETCO or as per
etc. at 66 KV Dediyasan GIDC Sub instruction of
Station Ta: Mehsana, Dist: Mehsana. Engineer-in- charge.
Note: 1)Generally all required materials will be issued form above store centers. In case of
non-availability of some items, contractor shall have to collect from other nearby store
centers without extra cost to the GETCO.
2) Bidder shall be note that material/equipment shall be issued from Mehsana/R&M store
Soja and Bidder shall arrange loading, unloading, transportation from Mehsana/R&M
store Soja to work site.
Seal and signature of contractor
GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED
TRANSMISSION CIRCLE OFFICE, MEHSANA.
To create environment where Business confidence is built though best business practices and is
fostered in an atmosphere of trust and respect between providers of goods and services and their
users for the ultimate benefit of society the nation.
GETCO COMMITEMNT PARTY’S COMMITEMENT
To maintain the highest ethical Not to bring pressure
standards in business and recommendations outside GETCO to
professional influence its decision.
Ensure maximum transparency to the Not to use intimidation, threat,
satisfaction of stakeholders. inducement or pressure of any kind on
GETCO or any of its employees under
any circumstances.
To ensure to fulfill the terms of To be prompt and reasonable in
agreement / contract and to consider fulfilling the contract, agreement, legal
objectively the viewpoint of parties. obligations.
To ensure regular and timely release To provide goods and / or services
of 9payment on due dates for work timely as per agreed quality and
done. specifications at minimum cost of
To ensure that no improper demand is To abide by the general discipline to
made by employees or by anyone on be maintained in our dealings.
To give maximum possible assistance To be true and honest in furnishing
to all the Vendors / Suppliers / Service information including payment to
provider and other to enable them to agents / sub-agent.
complete the contract in time.
To provide all information to suppliers / Not to divulge any information,
contractors relating to contract / Job business details available during the
which facilitate him to complete the course of business relationship to
contract / job successfully in time others without the written consent of
To ensure minimum hurdles to Not to enter into carter / syndicate /
Vendors / suppliers / contractors in understanding whether formal / non
complete of agreement / contract / formal so as to influence the price.
Seal & Signature Seal & Signature
(GETCO Authorized Signatory) (Party’s Authorized Person)
Seal and signature of contractor
Safety Penalty Clause:
1. In case if any safety related fatal Elect. / Mech. accident occurred to any employee
of agency or outsider due to negligence or non-compliance of GETCO safety
norms then in addition to the compensation and liability as per statutory requirement,
contractor / agency shall be penalized as under:
Sr. No Amount of Contract in Penalty amount
1 Up to -71 Lac Rs.5000
2 Above 1 Lac to -7 10 Lacs Rs.25000
2.1 The contractor shall inform concerned Ex. Engineer Const/TR in writing within
24 hours of fatal/Non-fatal accident occurred to human being.
2.2 The GETCO investigating officer findings in to accident shall be final and binding to the
contractor /Agency.
3. Safety Requirement:
3.1 Kick off Meeting exclusively for safety shall be done in each contract in presence of
contractor’s site in charge and supervisor. Safety document shall be handed over and
vital safety norms and key points of safety related to project shall be explained and
recorded for commitment by erection contractor. Such records are mandatory for clearing
first erection bill.
3.2 During site visit by GETCO official of Executive Engineer and above rank, the
following checks during execution of work shall be covered.
3.21 Safety equipments available and utilize.
(b) Safety belt. (c)
(d) Live line Voltage detector
3.2 2 Safety procedures adopted.
a) Permit to work
(b) Earthing at the place of work.
(c) Adequate supervision.
3.23 T & P physical Check. (Healthiness and Quality)
(b) Wire rope and sling.
(c) Earthing rod
Seal and signature of contractor
3.3 If above-mentioned safety requirements found violated in any of the above three
conditions shall attract penalty of Rs. 1000/-per occasion. (Max.Rs.3000/--for violation of
three conditions)
3.4 During subsequent visit, if violation is found, then double penalty shall be deducted
from the bill of the Contractor/Agency.
Seal and signature of contractor
CONTRACT AGREEMENT
(To be submitting after Awarding of Contract)
(Non judicial stamp paper of Rs. 300/-)
This agreement is made at ________, on the _________________day of __________in the Christian year
referred to as “THE CONTRACTOR” which expression shall unless excluded by or repugnant to context
include its successors or permitted assigns) of the one part and the Gujarat Energy Transmission
Corporation Limited, having their ______ Office at __________, (hereinafter called “Corporation” which
expression shall unless excluded by or repugnant to the context include its successors or assigns) of the
“WHEREAS” the aforesaid Corporation has accepted the tender of the aforesaid contractors for
_____________________________________________ as per Corporation’s Order No.
____________________________________ hereinafter called “The works” and more particularly
described enumerated or referred to in the specification, terms and conditions prescribed in the order
letter, covering letter arid other letters and schedule of price which for the purpose of identification have
been signed by Shri ________________________________________ on behalf of the Contractors and by
__________________________________________on behalf of the Corporation, a list where of is made
out in the schedule hereunder written and all of which said documents are deemed to form part of this
contract and included in the expression ‘The Works” wherever herein used, upon the terms and subject to
the conditions hereinafter mentioned. AND WHEREAS THE GETCO has accepted the tender of the
contractor for the work of ______________________________________________. of Gujarat State for
the sum of Rs. _______________(Rupees_______________________________) upon the terms and
subject to the conditions herein mentioned.
NOW THIS AGREEMENT WITNESSES AND IT IS HEREBY AGREED AND DECLARED THAT:
1. The contractors shall do and perform all works and things in this contract mentioned and described
or which are implied therein or there from respectively or are reasonably necessary for the completion of
the works as mentioned and at the times, in the manner and subject to the terms conditions and
stipulations contained in this contract, and in consideration of the due provision, executions, construction
and completion of the works agreed to by the contractors as aforesaid, the Corporation doth hereby
covenant with the contractor to pay all the sums of money as and when they become due and payable to
the contractors under the provisions of the contract. Such payment to be made at such times and in such
manner as is provided by the contract.
2. The conditions and covenants stipulated hereinbefore in this contract, are subject to and without
prejudice to the rights of the Corporation to enforce penalty for delays and / or any other rights whatsoever
including the right to reject and cancel on default or breach by the contractors of the conditions and the
covenants as stipulated in the general conditions, specifications, forms, or tender schedule, drawing, etc.
attached with Corporation’s Order No.___________________________.
The contract value, extent of works / supply, completion / delivery dates, specifications and other relevant
matters may be altered by mutual agreement and if so altered shall not be deemed or construed to mean
or apply to affect or alter other terms and conditions of the contract and the general conditions and the
contract so altered or revised shall be and shall always be deemed to have been subject to and without
prejudice to said stipulation.
In witness whereof the parties here to have set their hands and seals this day and month year first above
Seal and signature of contractor
Signed, Sealed and Delivered by
In the presence of, signature with names and
Signed, Sealed and Delivered by
for and on behalf of Gujarat Energy Transmission Corporation Limited,
In the presence of, signature with names and
Seal and signature of contractor
SAFETY CUM INDEMNITY BOND
(On Non-judicial Stamp paper of value not less than Rs. 300.00)
KNOW ALL MEN BY THESE PRESENTS that we, by this SAFETY CUM
INDEMNITY BOND Executed on this _ Day of 2013. I/We Having
Registered Office (herein after called “THE CONTRACTOR”
which expression shall mean and includes my /our heirs, executors, administrators and legal
representatives, successors and permitted assigns) do hereby binds myself/ourselves and also
our company/firms after having the power to bind by this promise and undertaking in favour of
the Gujarat Energy Transmission Corporation Limited (GETCO), Mehsana a State Transmission
Utility under The Electricity Act, 2003 having its registered office at Sardar Patel Vidyut
Bhavan, Race course, Mehsana.( hereinafter called as GETCO, which expression shall
mean and include its legal representative, administrators assigns) has agreed under the terms
and conditions of the contract no. dated made between and for
the contract of the value of Rs. _ interalia on production of Safety
Cum Indemnity Bond.
We do hereby undertake and agree to Indemnify and keep Indemnified GETCO from time to
time to the extent of Rs. Rupees only against any losses or damages, costs,
charges and expenses caused to or suffered by reason of the CONTRACTOR while Project,
R&M, O&M work including work carried out by outsourcing agency, failing to take proper care
or not complying the guidelines given hereunder as per Annexure-A and instructions which
may be given from time to time during the continuance of the contract and we further undertake
to unconditionally pay the amount claimed by the GETCO on demand and without demur to the
extent aforesaid.
Whereas the CONTRACTOR has/have been awarded to execute the job/works under order no.
, dated for issued by the GETCO after having observing necessary formalities,
the details of which is described in the order no. dated and whereas the said
job/works will be /likely to be done in places covered under Employees’ State Insurance
Act,1948 (ESI) and /or the Workmen Compensation Act,1923 and /or other laws relating to the
Labour Management and Welfare Act. (Respective Amendments)
And whereas according to the condition of the Contract the CONTRACTOR is under
obligation to execute this Safety cum Indemnity Bond before the commencement of actual
execution of work
Now the indenture witnesses that I/We the CONTRACTOR do hereby undertake to follow the
guidelines as per Annexure-A prepared by the GETCO.
Further we the CONTRACTOR agree that the GETCO shall be sole judge of and as to whether
there has been any breach of the guidelines as per Annexure-A of this bond and as to the
extent of the loss, damages, costs, charges and expenses caused to or suffered by the GETCO.
Seal and signature of contractor
We the CONTRACTOR further agree that our liability under this bond shall not be discharged
because of the change in the constitution of the GETCO or for the extension of the time limit
or for any other reason.
We the CONTRACTOR further agrees to the given terms and conditions:
a. That the CONTRACTOR undertakes /undertake to indemnify and keep harmless the
GETCO from all claims, actions, proceedings and risk, damage danger to any person
whether belonging or not belonging to the. CONTRACTOR.
b. That the CONTRACTOR shall keep harmless the GETCO from all claims, compensation,
damages any proceedings in respect of any of its employee / workmen under the Workmen
Compensation Act or any other laws for the time being in force.
c. That, if during the course of execution of work as stated in the contract order
mentioned hereinabove issued by the OBLIGEE, it is found that the CONTRACTOR has not
complied with guidelines as per Annexure-A or terms and conditions / formalities within the
meaning of Employees’ State Insurance Act,1948 (ESI) or Workmen Compensation Act
or any other laws relating to the Labour Welfare for the time being in force, and also has not
observed the safety norms in accordance with the law prevailing at the place of work/job to the
satisfaction of the GETCO, the GETCO shall have the right to stop the execution of work/job
and the period of such stoppage shall not be taken into account for the calculation of the total
period of completion of work for which the CONTRACTOR is responsible to complete the
work/job and it will be deemed that discontinuance was due to default of the CONTRACTOR .
d. That, if any time, due to exigency, GETCO as the Principle Employer, becomes liable to pay
any such compensation mentioned hereinabove, whether on
failure of the CONTRACTOR or for any other reason, the GETCO shall have the right to
recover the said amount from any amount receivable by GETCO or any bank guarantee
deposited or anything payable whether in connection with this contract or other contract by the
CONTRACTOR to the OBLIGEE.
e. That the CONTRACTOR is/are aware and accept that for the persistent or
repeated violation of any guidelines as per Annexure-A and terms and conditions mentioned in
this Safety cum Indemnity Bond, GETCO shall have right to terminate the contract of work
issued to the CONTRACTOR .
f. In case if any safety related fatal Electrical / Mechanical accident occurred to any employee of
agency or outsider due to negligence or non-compliance of GETCO safety norms then in
addition to the compensation and liability as per statutory requirement, contractor / agency is
hereby agreed to pay the penalty amount as given below:
Sr. Amount of Contract in
1 Up to -71 Lac Rs.5000/-
Above1 Lac to -7 10 Lacs
4 > 100 Lacs 1.0 % of contract value
Seal and signature of contractor
g. I/We the CONTRACTOR hereby confirm that in case of any dispute/difference for
settlement of claims under this Safety Cum Indemnity bond the courts in Gujarat State
wherever job/work is performed or as per GETCO norms shall have the jurisdiction to decide
the rights & liabilities of the parties while adjudicating the matter of claims under this Safety
Cum Indemnity Bond.
h. This Safety cum Indemnity Bond shall continue and hold good until it is released by the
GETCO in Writing on the Contractor’s application after the
Contractor has discharged all his obligations under the order mentioned hereinabove and
submitted a “NO DEMAND CERTIFICATE” from the GETCO under the said order. The
Safety cum Indemnity Bond shall be valid for a CONTRACT PERIOD and renewable thereof
(Claim Period).
i. This Safety cum Indemnity Bond and the guidelines as per Annexure-A herein
contained are in addition to And not by way of limitation or substitution for any other
guarantee, indemnities Hereto before given to the GETCO by the CONTRACTOR and this
indemnity does not Revoke or limit such indemnities or guarantees. IN WITNESS WHEREOF
the Parties hereto have executed this indenture the day the year First hereinabove written.
(Signature with seal of The CONTRACTOR)
In the presence of:
Seal and signature of contractor
OUR ENDEVOUR Safety a habit
To create environment where Business Confidence is built through Best Business Practices and is fostered
in an atmosphere of trust and respect between providers of goods and services and their users for the
ultimate benefit of society a the nation, safety guidelines are agreed upon by the agency as under.
Safety is our prime concern and zero accident is our goal. In order to prevent the accident, while execution
of works in indoor and outdoor systems of GETCO, the following guideline and preventive measures are
Indoor safety precaution Outdoor safety precaution
The method of work required T&P and manpower The method of work required T&P and manpower
should be discussed between GETCO should be discussed between GETCO supervisor,
supervisor, contractor’s supervisor and gang leaders.
contractor’s supervisor and gang leaders.
Prior to execution of work a joint survey must be Prior to execution of work a joint survey must be
conducted by GETCO supervisor and contractor’s conducted by GETCO supervisor, contractor’s
supervisor for risk assessment supervisor and DISCOM line man in order to
•Clearly identify the work location, to distinguish identify the following :
between the equipment that is dead and other a. HT/LT line or tap line crossing under each span of
equipment / part that may be live. line of the work.
•Disconnect equipment from supply. b. Isolation point of each line crossing.
•Protect against other live parts. c. Each line crossing & isolation point under each
•Take special precautions when close to bare span must be discussed and noted in maintenance
conductors / Bus bar. register with sketch.
Following safety guidelines are mandatory for all Contractor’s supervisor and GETCO Supervisor
contractors operating in GETCO premises for must ensure all isolations physically with adequate
Electrical, non electrical & civil works. earthing technically prior to give clearance to gang
1. The contractors must provide advance planning leader for taking up job.
of work to concerned incharge of substation in While execution of stringing work, the identified line
writing. crossing must be isolated / deenergized and written
2. Before starting any work whether switch yard, clearance should be obtained from concerned
“permit to allow to work” must be taken from controlDISCOM supervisor.
room incharge. The isolation of Tap line must be physically seen
1. Utilizing Electrical / nonelectrical equipments,
and verified by Contractor and GETCO supervisor.
safety rules must be implemented. At D.O. fuse junction contractors person should be
2. If the work is to be carried out on Sunday orposted to ensure that no person restore D.O. supply
Public holiday, the necessary permission must be while work is under execution
taken in advance, requesting in writing. Contractor’s supervisor must ensure that concern
3. Unwanted person including children of labours officer take LCP for EHV line and power line crossing.
will not be allowed at working site/ in the switchyard
and in the prohibited area.
4. Any electrical work or electrical connections to
equipment for any other work must be carried out by
Sign & Seal of Contractor Page
electrician/wiremen with adequate size of wire
through MCB as per I.E. Rule.
-Live penal area / bus bar must be isolated and
sealed / bifurcated with red colour tape for visible
warning. Display Board must hang on LCP panel.
-Transformer must be switched off whenever and
wherever contractor and line workers are not
satisfied with isolation, earthing or any equipment
performance of GETCO, it will be pointed out and
work shall begin only after resolution. Contractor
shall not take up job in absence of GETCO
authorized person. All wire temporary connection &
material whenever erection activity has any
connection and disconnection work of bus bar,
All workers / labour of contractor & All workers / labour of contractor &
supervisors must use personal protective supervisors must use personal protective
equipment (PPE) during the work like equipment (PPE) during the work like
gloves, safety belt, Safety shoes, Helmet, gloves, safety belt, Safety shoes, Helmet,
earthing rods, etc, duly approved by earthing rods, Live line detector etc, duly
GETCO. approved by GETCO.
The local earthing must be done at the The local earthing must be done at the place
place of work before execution of any work. of work before execution of any work.
11 kV breaker in panel must be switched Circuit breaker opening is not an isolation
off and racked out only after ensuring no and isolator on either side must be opened.
voltage in breaker and without door No work during rains and cloudy weather
opening. condition.
Transmission line activities.
1) Used of Voltage detector to ensure
2) Earthing at three point, local, left &
right side of bus bar / string bus.
3) Match line colour code with colour of
Local earthing of electrical equipments like
filter M/c, welding machine, testing kits etc.
Crane shall only be used for material
handling and erection. Working platform
shall only be used for work in switchyard.
Sign & Seal of Contractor Page
FORM OF BANKER'S UNDERTAKING
[For Performance Guarantee (PBG) towards Guarantee/ Warranty Period
as per commercial terms and conditions of tender]
We, ___________________ (Name of the Bank and Address of the Branch giving the Bank Guarantee)
registered address at __________________________________________ (Address of Registered office)
hereby give this Bank Guarantee No. _______________dated ____________ and hereby agree
Unequivocally and Unconditionally to pay immediately on demand in writing from the Beneficiary Company
GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED, MEHSANA (subsidiary Company of
Gujarat Urja Vikas Nigam Ltd.) or any officer authorized by it in this behalf any amount up to not exceeding
Rs. ___________/- (Amount of Performance Guarantee towards Execution/Supply period) (Rs.
__________________________________________________ (in words) to the said GUJARAT ENERGY
TRANSMISSION CORPORATION LIMITED (GUVNL/ Subsidiary Company) on behalf of M/s
____ who have entered into a contract for the supply/works specified below:
This agreement shall be valid and binding no this Bank up to and inclusive of _______________(Date of
validity of the Bank Guarantee) and shall not be terminable by notice or by change in the constitution of the
Bank or the firm of Contractors/ Suppliers or by any other reasons whatsoever and our liability hereunder
shall not be impaired discharged by any extension of time or variations or alterations made, given
conceded or agreed, with or without our knowledge or consent, by or between parties to the said within
written contract.
Notwithstanding anything contrary contained in any law for the time being in force or banking practice, this
Guarantee shall not be assignable, transferable by the Beneficiary GUJARAT ENERGY TRANSMISSION
CORPORATION LIMITED, MEHSANA (i.e. GUVNL or Subsidiaries). Notice or invocation by any person
such as assignee, transferee or agent of beneficiary shall not be entertained by the Bank. Any invocation of
the Guarantee can be made only by the beneficiary directly.
NOTWITHSTANDING anything contained herein before, our liability under this guarantee is restricted to
exceeding Rs. _______/- (Rs. _____________________________________ Only). Our guarantee shall
remain in force until ___________ (Date of validity of the Bank Guarantee). Unless demands or claims
under this Bank Guarantee are made to us in writing on or before _________ (Date of validity of the Bank
Guarantee), all rights of Beneficiary under this Bank Guarantee shall be forfeited and we shall be released
and discharged from all liabilities there under.
Complete Postal Address of the Bank Signature of the Bank’s Authorised Officials
with Branch Code, Telephone & Fax No. with their Code Nos. & Round Seal
Sign & Seal of Contractor Page
BIDDER’S DETAILS OF PERSONNEL
Firm Type (Proprietary/
Partnership/Corporate )
Contact Person Name and
5 Qualification
6 Professional Experience
9 Contract Details
Note: All the correspondence, queries etc., will be asked on above E-Mail only. Bidder is
responsible to check and operation of e-mail ID.
Sign & Seal of Contractor Page
Sub. : As above Mention
In connection with above subject, I / we confirm the following:
a) I/ we, the undersigned, have read and understand the Tender Specification for Work Complete with the
entire tender Terms and Conditions.
b) The price in the bid is firm prices in line with Tender Specifications and shall stand valid till completion of
the Contract, if awarded.
c) I/We declare that our bid is strictly in line with Tender Specifications and there is no deviation. Further, I
/ we also agree that additional conditions / deviations, if any found in bid, the offer shall be out rightly
rejected without assigning any reason thereof.
Company / Agency
NAME: STATUS: Name of
tendering Company
Sign & Seal of Contractor Page
CONFIRMATION OF DETAILS OF BIDDER
Bidders are required to furnish following information specifying YES / NO
1) Whether the Bid is on percentage basis as called for. Yes / No
2) Whether rebate furnished is in percentage basis as called for. Yes / No
3) Whether the Bid is submitted by RPAD. Yes / No
4) Whether a l l pages of Bid Specifications are sealed and signed by the Bidder.
5) a) Whether the Bidder is registered with for Getco
b) In case of “Yes”, please furnish following details:
i) Registration Letter No. &date.
ii) Class of Registration
c) Whether Bidder is having PF Code No. Yes / No
6) a) Whether EMD/Tender fees paid. ( DD / BG ) Yes/no
7) Whether following documents as specified are submitted.
a) Human Resources detail. Yes / No
b) Availability of tools, equipment’s etc. Yes / No
c) Details of orders executed / on hand Yes / No
d) Financial capability. Yes / No
e) Experience as specified. Yes / No
f) Company's Articles Of Association Yes / No
g) Details Of Partners / Directors Yes / No
h) B.R./P.A. Authorizing Person Yes / No
i) Power of Attorney of Consortium Members Yes / No.
J) Pan card Yes/No
K) GST Registration Yes/No
L) Electrical Contractor registration Yes/No
M) Solvency certificate Yes /No
8) Price: [FIRM ONLY] Yes/No
9) Security terms agreed Yes/no
10) Penalty terms agreed Yes/No
11) Terms agreed: Yes/no
12) Validity of the offer for 180 days from the date of
opening of the technical bid: agreed Yes/No
13 payment terms agreed:
Company / Agency
NAME: STATUS: Name of
tendering Company
Sign & Seal of Contractor Page
1) DETAILS OF WORK ORDERS EXECUTED BY THE BIDDER OF VARIOUS SIMILAR
Sr. Order Description of Order Order Name of Order
No. No./Date work Qty.(Bay/ss) Amount placing authority
Completion date as Date of commencement of ual completion of work
2) SATISFACTORY WORK COMPLETION CERTIFICATE
Sr. Description Certificate No Date Order Certificate issuing
No. Amount authority
3) WORKS TENDERED / IN HAND
Details of other Works, tendered for & in hand, as on the date of the Submission of this tender [Tenderers
shall submit the information in the Format detailed here under]
Name Of Work and Anticipate
Location Order Value date of Remarks
No Quantity(Bay/SS)
Signature of Authorized Representative
Company / Agency
NAME: STATUS: Name of
tendering Company
Sign & Seal of Contractor Page
FINANCIAL CAPABILITY
Sr. Details Amount Rs. In lacks Remarks
1. Solvency A scheduled Banker’s
Certificate of present
solvency be attached.
2. Price of the biggest job
3 Average Turnover of Last
Signature of Authorized Representative
Company / Agency
NAME: STATUS: Name of
tendering Company
Sign & Seal of Contractor Page
1) ERECTION CAPACITY
Based on available men power, tools-tackles, machinery and financial resources, our erection
capacity is as under:
Sr. Name of activity Unit Capacity per No. of Persons per
No. Annum per gang gang.
2) TENDERER’S DETAILS OF PERSONNEL
The List of Technical Personnel intended to be placed at the Work by the Contractor.
[Tenderers shall submit in the Format detailed here under]
Sr. Description Name Qualification Professional Remarks
No. &Details Experience
of position & details of
Contractor’s Representative legible signature: ______________________
Seal of the company
Seal and signature of contractor
This is to declare that none of the Proprietors/ Partners/ Directors are having any relatives employed or
working with Gujarat Energy Transmission Corporation Ltd at any of its offices or its parent Department
Signature of Authorized Representative
Company / Agency
NAME: STATUS: Name of
tendering Company
Seal and signature of contractor
(UNDERTAKING IN REGARD TO STOP DEAL/BANNED FOR BUSINESS DEALING /BLACK LIST
SUB: Undertaking in regard to stop deal/Banned for Business dealing /Black list thereof)
Ref: Tender no:
All bidders will have to furnish the following undertaking duly filled in, Signed and stamped for each
quoted item of the tender along with the technical bid.
Authorized signatory of M/s _______________________________________________ here by certified
That M/S_____________________________________________________ and their proprietor/any
partner /any director of the firm is not stop deal and/or banned for business dealing and/or black listed
by GUVNL and/or their any subsidiary company viz. GSECL/GETCO/DGVCL/MGVCL/UGVCL/PGVCL.
Seal of Firm Signature of renderer
Seal and signature of contractor
QUALIFICATION REQUIREMENT.
Contractor must fill up below details & should place at the top of the Technical Bid.
Sr No: List of Documents
1 Registration(No, Class)
3 Partnership deed/Proprietor/AOA/MOA
(Notarized copy)
4 Power of Attorney (Notarized copy)
5 Bl. Sheet / P&L A/C, last three years.
6 Latest Solvency certificate.
8 GST registration No
9 Experience certificate As per QR
10 Electrical contractor Certificate valid up
11 Man and tolls and tackle detail
Signature of Tenderer Company’s Round Seal
Seal and signature of contractor
GUJARAT ENERGY TRANSMISSION CORPORATION LTD.
CIRCLE OFFICE, MEHSANA
TENDER SPECIFICATION
“Erection of structure, equipment, control wiring, yard Lighting, Control-Room & Staff-
Quarter Electrification etc. at 66 KV Dediyasan GIDC Sub Station Ta: Mehsana, Dist:
TENDER NO. MTC/062026/n-41
(TO BE SUBMITTED ONLINE – N-Code Only)
Seal and signature of contractor
GUJARAT ENERGY TRANSMISSION CORPORATION LTD.
TRANSMISSION CIRCLE OFFICE, MEHSANA
Name of Work :- Erection of 66KV equipments, structures, control wiring, yard Lighting and Control-Room etc at
66kV Dediyasan GIDC SS.
SCHEDULE B-1: MAIN ERECTION
Sr Description of work/Supply Unit Qty Rate Amount
1 Erection of 66 Kv Breaker equipment’s of any type / make Set of 3 4 5535.00
with required all spares as per supplier's manual & FQP, Pole
including individual & interpole wiring for all mentioned
voltage class switchyard (as per respective technical
specifications & relevant special conditions) suitable for all
type of bus configurations. Scope includes the dragging
/loading / unloading of same from site store to erection
2 Erection of 66 Kv CT/PT/CVT on it's Erected structure Phase 18 623.00
including complete dragging/ loading/ unloading of same
with crane only from site store to erection site and fixing
of required clamps, connectors & accessories as per
instructions of Engineer-in-charge.
3 Erection of 66 Kv LA / Surge arrester with counter on Phase 12 415.00
erected structure including complete dragging/loading/
unloading of the same with crane only from site store to
erection site and fixing of required clamps, connectors
instructions of Engineer-in-charge.
4 Erection of 66 KV Double break isolator (All make) with Set of 3 2 3459.00
earth blade on its erected structure consisting of 3 base Pole
channels with solid core porcelain insulator including
interconnected piping with operating mechanism and
accessories with final adjustment for simultaneous
mechanical & electrical operating fro opening & closing.
The rates are inclusive of dragging / loading / unloading of
the same from site store to erection site as per instruction
of Engineer-in-charge
5 - - DO - - as above but without earth blade complete. Set of 3 7 2491.00
6 Erection of 66 Kv Solid Core porcelain /composite No 9 277.00
polymer Bus post insulator on its erected structure
complete, fixing of accessories and shifting of same
including loading/ unloading from its site store to erection
7 Laying of any size of 11/22KV XLPE cable including Mtr 250 138.00
excavation of trench 300 mm wide & 600 mm deep
including laying and filling up sand of 100mm layer from
bottom & bricks on three side of cable & refilling the
trench with Murram/soil & ramming etc. Required bricks,
sand, power cable marker/C.I./G.I. plate etc. will have to
be supplied by the contractor. Rates are inclusive of
shifting of cable drum to the site from S/S site store.
Drum should be handled only by jacking to avoid damage
Seal and signature of contractor
8 Laying of any size of 11/22 KV XLPE cable in ready made Mtr 600 63.00
cable trench or in open space. Rates are inclusive of
shifting of cable drum to the site from S/S site store.
Drum should be handled only by jacking to avoid damage
9 Erection of 66 Kv S/S & Equipment structure, VHF, LM etc MT 25 2491.00
structure.. including punching of nut bolts. Rates are
inclusive of shifting of same up to erection site from its s/s
11 Erection of 66/22KV or 66/11KV, class Power Transformer
with complete mounting of all the accessories i.e.
bushings, radiators, conservator tank etc. as per OEM
approved drawing including laying of cable between all
accessories mounted on the transformer/ marshalling
KIOSK. Filling and filtration of oil with filter machine as per
direction of Engineer-in-charge, manufacturer Engineer or
as per instruction manual of the equipment. All necessary
tools, tackles, required for transformer erection shall be
provided by the contractor. Filtration of the oil will be in
the scope of the contractor for the transformer.
12 Stringing of Single ACSR Moose/Zebra Bus complete in all Rmtr 200 63.00
respect with fixing of all fitting, insulators sag Per
compensating plate / spring and all accessories as per the Phase
instruction of Engineer-in-charge.
13 Preparing and fixing of required length of jumpers of Rmtr 400 16.00
single Moose/Zebra/Panther Jumpers in the switchyard Per
on respective Bus & equipment’s, tensioning & dressing of Phase
jumpers complete as per instruction of Engineer-in-charge.
Seal and signature of contractor
14 Installation of Earthing Strips / MS Round Bar in any kind
of soil expects Rocky(HR/SR) as per earthing philosophy of
GETCO Earthing Grid.
1) Including digging of 600 mm depth and 450 mm Wide
2) Cutting, bending, laying and fixing of Earthing grid
3) 75×10 mm / 50×6 mm GI strips: Fixing of two bolt at
each straight joints and lap welding, removing oxide films
formed during welding, applying two coats of red oxide
and black powder after welding and applying Zinc Rich
Paint on welded joints.
4)25/32/36/40MM dia MS Rod: Lap welding at each
straight & cross joints, removing oxide films formed during
welding, applying two coats of red oxide and black powder
after welding and applying Zinc Rich Paint on welded
Including supply of red oxide, black powder, HDGI nuts &
bolts, as per specification.
6)Back filling of the trench with yellow / Normal soil.
Structure and Equipment earthing:
1) Including digging of 600 mm depth and 450 mm Wide
2) Cutting, bending as per required shape, laying and fixing
of risers from Grid to structure and Equipment’s.
3) Lap welding, removing oxide films formed during
welding, applying two coats of red oxide and black powder
after welding and applying Zinc Rich Paint on welded joints
including supply of HDGI nuts & bolts for all connections
including supporting to structures etc as per specification.
4) Back filling of the trench with yellow / Normal soil.
(b)50 X 6 mm GI Strip Mtr 3500 43.00
15 Installation of 20/32/40 mm dia., 3 mtr Long verticle No 40 158.00
spike for mesh type earthing. (Round bar will be provided
16 Supply ,Installation Testing and Commissioning of No 39 13893.00
Maintenance free treated earth electrodes suitable for
Normal Soil as per drawing no GETCO /E/STD/P-021(1 OF
2) R3 DT 29.0.2020 and technical specification
GETCO/E/TS-maintenance free earth pits/R1 dated
04.06.2015 for 66/11 kv substation with ground
enhancement material/back fill/grounding compound as
per IEEE 80-2000 Clause 14.5(d) and as per part-7 of IEC
62561 using copper bounded earth electrode(with
micron copper coating)having 38 mm (mim) and 3000 mm
length which shall be capable of handling STC of 40 KA-1
sec. Work also include providing BB masonry inspection
chamber(manhole) incl. light type CI cover
Seal and signature of contractor
17 Providing and fixing inspection chember of precast No 4 700.00
cement Hume pipe of size 600mm diameter, 600mm
length and 50mm Thick with 50mm thick cover having
100mm hole for watering to pit including excavation up to
300mm depth in any kind strata, the pipe will be 300mm
above ground after fixing two coats of white wash with
painting of pit number complete as per instruction of EIC.
18 Erection of 66KV Control Panel, Relay panel or C/R panel No 6 691.00
or RTCC panel including grouting of panel, jointing with
adjoining panels including required fabrication for entry of
control cables and complete vermin proofing. Job includes
supply of required bolts, nuts etc. and shifting of panel
from S/S site store to work site
19 Erection of 11 kV CB Panel of any make including grouting, Per No 10 2076.00
jointing with adjoining panel and Horizontal , Vertical
levelling including required fabrication in control panel or
required stone cutting in flooring for entry of Power Cable,
Control Cable including interpanel wiring and complete
vermin proofing, job includes supply of required bolts,
nuts etc and shifting of panel from SS Site store to work
20 -DO- but Erection of LT panel board & battery charger of No 2 968.00
any make as per manufacturers instruction manual
including grouting, vermin proofing etc.
21 Erection of 100/250 AH, 110 V D.C. Battery Set on Set 1 6227.00
wooden stand as per instruction manual of supplier,
including first filling of battery electrolyte, proper
connection of cells and applying, charging/discharging
cycles as per manufacturer's instruction manual and
instruction of EIC
22 Erection of station transformer of 22KV or 11KV/430V, No 1 2214.00
63/100KVA on its plinth/DP Structure ,grouting of
foundation bolts, fixing of channels.., D.O. fuse by
fabricating str.& its painting, danger board etc. including
connection with power cable LV cable terminations
including shifting from S/S site store to plinth as per
Engineer-in-charge.
23 Fabrication for erection of any Equipment/Structure/panel L.S. 1 4992.00
or anywhere in s/s & F.B. at other endas per Inst. Of E.I.C. (Max.)
24 Erection of supporting structure for Station transformer as No. 1 2196.00
per GETCO drawing no : GETCO/E/06S-STD/11KV STR A3-
03. 1) Necessary
wooden clamp with required nut-bolt-washers & HDPE
rubber piece for packing etc. as per drawing shall be
supplied by contractor.
2) Job also include erection of required 11kV LA and D.O
fuse and any minor fabrication if required as per
instruction of E.I.C. 3)
Material for supporting structures, D.O. Fuse and 11kV LA
and will be supplied by GETCO free of cost.
Seal and signature of contractor
25 Erection of supporting structure for 11kv Power cable No. 2 998.00
termination at 11kv bushing of 10/15/20 MVA transformer
as per DRG. No. GETCO/E/06S-STD/11KVSTR-A2-02
1) Material for supporting structure will be supplied free
of cost by GETCO.
2) Necessary wooden clamp with required nut-bolt-
washers & HDPE rubber piece for packing etc. as per
drawing shall be supplied by contractor.
3) Job also include minor fabrication if required as per
instruction of E.I.C.
26 Providing & fixing of Set of following Items on erected Set 2 27303.00
11KV support structure system for power cable 66/11 KV
Transformer as per DRG. No. GETCO/E/06S-STD/11KVSTR-
A2-02 and instruction of E.I.C.
1) Alluminium Alloy Bus Bar of size 100X20X2000 mm.
with heat shrinkable anti tracking tubing: 03 Nos.
2) 11KV SRI of PCD 127 mm - 12 No
3) Copper laminated fusion welded flexible jumper of size
100 X 10 X 600 mm having 2000 Amp capacity: 03 Nos.
4) BiMetalic Plate (Al/Cu): 03 Nos.
5) 11KV heat shrinkable anti tracking Sleeve on Al Bus bar
of all three phase: 06 mtrs.
6) Including required GI/SS nut-bolt and washers of Good
Quality for fitting support structure.
7) All live parts shall be covered with heat shrinkable MV
insulated tape / sleeve.
27 Erection of 11KV D.P. Structure as per GETCO Drawing No 5 2196.00
No.: GETCO/E/06S-STD/11KV STR A1-01.
1) Job includes erection of 11KV A/B switches, 11 KV PI,
jumpering between 11kv cable to 11kv Bus etc. on erected
structures. 2) Material
for DP structures, A/B switches, PI and conductor for
jumper will be supplied by GETCO free of cost.
3) Necessary wooden clamp with required nut-bolt-
washers & HDPE rubber piece for packing etc. as per
drawing shall be supplied by contractor.
4) Job also include minor fabrication if required as per
instruction of E.I.C.
28 Erection of 11KV D.P. Structure as per GETCO Drawing No 5 2196.00
No.: GETCO/E/06S-STD/11KV STR A4-04.
1) Job includes erection of 11KV A/B switches, 11 KV PI,
jumpering between 11kv cable to 11kv Bus etc. on erected
structures. 2) Material
for DP structures, A/B switches, PI and conductor for
jumper will be supplied by GETCO free of cost.
3) Necessary wooden clamp with required nut-bolt-
washers & HDPE rubber piece for packing etc. as per
drawing shall be supplied by contractor.
4) Job also include minor fabrication if required as per
instruction of E.I.C.
Seal and signature of contractor
29 Stringing of Single ACSR DOG Bus between 11KV DP Set of 3 5 4786.00
structure (A1) to cross boundary structure (A4) in all Phase
respect. 1) Job
includes fixing of all fittings and accessaries on erected DP
structure. 2) Single tension
hardware suitable for ACSR Dog conducture- 6 Set shall be
supplied by contractor. 3) Necessary ACSR dog
conductor, 11 Kv Insulators will be supplied by GETCO free
30 Providing of M15 Grade Concrete for various equipment Cmt 15 5276.00
structure, Guy, 11kv DP, M.K. Box, Neutral channels, cable
support channel, grouting of Pole/ Flood light structure
with cement, sand & metal in proportion of 1:2:4
respectively. 1)
Work includes muffing with smooth cement mortar (1:6)
2) Necessary sand, metal, water and cement shall be
supplied by the contractor.
31 Excavation in Hard Rock for excavation of Earthing Cmt 0 525.00
Pits/trenchs, Yard Light Poles etc.
32 Loading, Transporting & Unloading of all material for 66 Job 1 51720
KV substation like Structure, indoor & out door
Equipment’s, DP Structures, earthing materials, Battery
set, fire wedge, GI/MS Scrap, all other required materials,
etc in all respect for Substation & opposite end feeder bay
from Store(Any store either Const. div. or R & M Store
within respective Zone) to Sub Station Site.
This job also includes crediting balance materials at
respective construction division store at no extra cost.
33 Supply & laying of 1 Core X 25mm2, Armroured Copper Mtr 45 199.00
Cable multi-strand flexible of approved make ISI marked in
ready made trench or PVC pipe from Battery Charger to
Battery Set including termination at both side as per inst.
34 Providing and fixing of various type of sign Board, sticker, Job Work 1 24957.00
Big Sign Board, earthing pit board, earthing pit Board &
Single line diagram etc as per instruction of IEC. Sticker of
red, white, black Letters are to be utilised for various sign
Earthing Pit Board Size:- 6" x 6" -30 Nos.
Safety Slogan Board, Hard Sheet board size 2' x 2'and 4mm
thick (Gujarati Language)- 02 Nos.
Safety Slogan Board, Hard Sheet board size 3' x 2'and 4mm
thick (Gujarati Language) with red and Yellow colour.-03
Single line diagram size 5' x 3' Digital with Alluminium
frame with fitting and as per approved diagram given by
Big sign board size 5' x 4' and 2mm thickness indicating
sub station name digital with S.S. rod with hole & as per
approved symbol with fitting charge.- 01 No.
Seal and signature of contractor
Switch yard sign Board 12" X 6" with 2 mm Thickness black
& white Gujarati language.-25 Nos.
Safety Slogen Board size 2" x 6" in side control room.-05
Various type of control room equipment sticker size-24
cms x 5cms.--18 Nos.
Safety picture board size :- 3' x 3' (Laminated for O/D use)-
Name plate board of transformer size :- 2' x 1'- 04 Nos.
Cable marker size:- 6" x 6", Radium, fixed on 750mm long
M.S.Rod for fixing arrengement.- 30 Nos.
35 P&F Radium sticker for outdoor and Indoor equipments Sq.inch 5000 2
identification like LA,Isolator,Circuit
breaker,Transformer,CT,PT,MK box,C&R panels,11kv Panel
board, Control board etc.
36 Providing and Fixing of fire stand from 75mm Gl pipe A Job 1 4992.00
Class ISI mark heavy duty having 5ft width and 4ft height
as per inst of Engr. In charge
1) Work includes cutting ,drilling, welding of pipe as
required. Fabrication and supply of 16mm dia meter hook
size required for buckets.
2) 4 Nos.of fire buckets are to be provided by the
contractor. 3) Fire
stand should grouted with excavation of pit size 300mm x
300mm-2 Nos. of 600mm depth with 1:3:6 mix muffing
300mm in height including leveling of stand.
4) The fire stand is to be painted with post box red colour
of approval quality as per instruction of EIC.
5) All required approved material including cement, sand,
metal etc are to be provided by contractor.
37 Providing, Fabrication and erection of VHF set entena Job 1 1498.00
support pipe on control room by providing 25mm dia. GI
pipe of length 20 feet.including providing & fixing of 4 nos.
of guy from GI wire 10 SWG. This job includes painting of
GI pipe by good quality paint white and red alterlatively.
38 Labour charge for fixing of 11KV XLPE Indoor / outdoor No 24 748.00
cable kit of any make for 11KV, 3C× 95 to 300 sq. mm.
XLPE power cable. Cable kit provided by GETCO.
39 Providing & Fixing of RAYCEM/MSEAL/CABSEAL or No 2 6139.00
equivalent GETCO approved make heat shrinkable type
11KV XLPE indoor/Outdoor cable Termination kit suitable
for 11KV, 3C x 95 sqmm to 300 sq.mm XLPE power cable.
Seal and signature of contractor
40 Providing & Fixing of Aquaguard Total Reviva Water R.O. No 1 6889.00
Plant including Commissioning & Testing and also with
required peripherals for installation of plant as per site
(1) Dimension: 320 X 275 X 410 mm
(2) Weight : 8 KG
(3) Water flow : 8 to 12 LPH
(4) Input power : 230V AC
(5) RO membrence : TFC spiral
You have to provide guarantee for the 12 month from the
41 Providing and fixing of ISI mark Rubber Matting sheet sq.mtr 25 4492.00
Suitable for 11KV Class As per following
specification.Reference IS:15652-2006 with latest
amendment.Suitable for Voltage Class :B Max Use Voltage
: 11KVAC proof voltage : 22KVDielectric strength :
45KVLeakage current : < 10 micro ampereColur
RED/BLUEMake : Vardhman or equivelent ( Rubberhouse
India)Width :1 mtr.Thickness :2.5 mm.Surface :Chequred
on one side and other side plain.NOTE:Contractor has to
supply Rubber Matting sheet as per IS:15652-2006 with
latest amendment specification and shall submit test
certificate for routine test as per relevant IS.
42 Providing & fixing of reputed make ISI mark Fire
Extinguisher with latest amendment in standards as per
following capacity . Note: Contractor shall submit Test
certificate for routine test as per relevant IS.
a) Chemical Powder 9 Kg No 2 6301.00
b) CO2 type - 6.5 Kg No 2 7047.00
c) CO2 Type : 22.5 Kg No 2 17817.00
d) Mechanical Foam Type : 50 Ltr No 1 14499.00
43 Providing & fixing of all weather proof, cold rolled sheet No 1 20650.00
floor mounted fixed type sinle door grey color main AC
Dist Box having size 900X600X250 MM with door closing
arrangement rubber gasket.
Contractor has to supply following materials with box
along with necessary mounting and wiring.
(1) L&T/Anchor/Havells Make 100A, 4P MCCB - 1 Nos.
(2) L&T/Anchor/Havells Make 63A, 4P MCCB - 2 Nos.
(3)100A Copper Bus-bar link length 6 inch & 25X3mm -
nos. (4) Tinned Earth Bus 25 X 3 MM
length -32 Inch-1No. (5) 25 & 16 sqmm
Cu. Flexible cable 4 & 8 mter respectively. (6)
Required nos. of Cu. Lugs etc. as per instruction of EIC.
Seal and signature of contractor
44 Providing & fixing of all weather proof, cold rolled sheet No 1 24732.00
steeYard AC Dist box having
(1) one No 63A,4P MCB as main I/C
(2) 09 Nos of 32A, 4P, MCB as O/G feeders
(3) 6 Nos of 32A, DP, MCB as O/G feeders
as per drawing enclosed. Any one Make
L&T/ANCHOR/MDS /HAVELLS & Required out going
cables of standard make like MDS/HAVELLS & stud type
connector of standard make like Connectwell.
TOTAL - 1 ( SCHEDULE B - 1 )
SCHEDULE B - 2 : CONTROL WIRING
45 Preparing of complete Schedule of wiring for line/ Bay 4 1996
transformer/PT bay for 66KV bays in triplicate. necessary
drawing will be provided by the GETCO. Schedule should
be approved by EE. or DE in charge.
46 Laying of 1.1KV PVC, armored copper/ aluminum control
cable inside hume pipe/cable trench including binding /
clamping of cable with GI wire or saddles as per the
requirement including the supply and fixing of
identification tags at both ends and at distance of every
mtr of following size.(Cable will be supplied by GETCO at
mm2, 4C × 4 mm2 Copper control cable or any equivalent
size of all LT cable.
mm2, 27C × 2.5 mm2, Copper control cable 3.5 C or 4 C ×
10 mm2, 70 mm2 alluminium armoured or unarmoured LT
47 Laying of 1.1KV PVC, armored copper/ aluminum cable in
ground by digging trench of suitable width and 450 mm
depth in any type of soil including supply and fixing of
identification tags at both ends and at distance of every
mtr of following size.
mm2, 4C × 4 mm2 Copper control cable or any equivalent
size of all LT cable.
mm2, 27C × 2.5 mm2, Copper control cable 3.5 C or 4 C ×
10 mm2, 70 mm2 alluminium armoured or unarmoured LT
48 Providing and fixing 'B' class G.I. pipes of following size for
cable protection including fixing with the structures.( Non
SOR) including required 'L' & 'T' band, coupling for CT,PT,
Transformer, M.K.Box cabling on structure including
required fabrication.
{a} 40mm dia (weight of pipe-3.2kg/meter) Mtr 130 255
{b} 50mm dia (weight of pipe-5.1kg/meter) Mtr 70 284
Seal and signature of contractor
49 Providing and Fixing of Finolex brand or equivalent rigid 4 Mtr 80 155
KG/CM2 PVC pipe for cable protection in free space
beyond cable trench upto foundation top including
making holes in cable trench with necessary finishing after
provision of pipe including necessary fittings like
bends,shoe,cowl etc. & fixing the pipes to the wall in
plumb by means of GI clamps of 18 guage sheet with 1 to
1.5 meter distance & by excavation upto 450 mm depth
and refilling the trenches in any type of soil , filling the
joints with approved solution complete as directed by E.I.C
[B] 165 mm dia. O.D PVC Pipe
50 Termination of Control Cable at Panel / M.K./ Equipment’s
including supply of required size of double compression
type metal glands, lugs, ferrules, PVC Binding Tape,
Buttons, Cable ties etc for following size of cables.
a) Up to 7 Core Control cables End 170 199
b) As above but Above 7 Core Control Cable., End 88 349
51 Providing & Installation and Commissioning of Remote Job 1 6489
Control switch Board for ON/OFF control of all 11kv Panel
from operator's table with supply of good quality metal
sheet box ( 18 SWG )size 450 x 450 x 125 mm with door,
20 nos standard ISI make and rating industrial push
botton, indication lamp(LED)with installing accept/reset
arrangement with required ISI marked copper flexible wire
size 2.5 Sq. mm including complete wiring in PVC pipe and
fixing on wall or on floor as per inst. of EIC.only 19/27 core
x 2.5 sqmm cable supply by GETCO. Job includes Supply of
required nos. of Disconnecting Type Terminal for wiring at
11 kV Panel Board end
52 Providing and fixing of all weather proof, cold rolled sheet No 6 21549.00
steel junction box for CVT & PT, CT terminations with
Nos. of disconnecting type, 'Elmex' make CATDM 4 or
equivalent type connectos and required No of fuses, links
etc.as per instruction of Engineer-in-charge,as per
approved schedule of cable.
TOTAL - 2 ( SCHEDULE B - 2 )
SCHEDULE B - 3 : YARD LIGHTING
Seal and signature of contractor
53 Providing & fixing of all weather proof, cold rolled sheet No 1 24732.00
steel AC Panel - 2 for Yard-Light AC supply having
(1) 63A 4P MCB : 01 NO
(2) MCX-12A contactor : 01 NO
(3) Digital Timer : 01 NO
(4) 20A TPN MCB : 06 NOS
(5) Indication lamp " 03 NOS
(6) Push Butten : 02 NOS
(7) Terminal Connector as per site requierment
and other detail as per drawing enclosed including
grouting & Necessary fabrication of GI Angle or fixing on GI
Structure and earthing with main grid as per instruction of
EIC.as per drawing enclosed.All MCB are Only Following
Any one Make L&T/ANCHOR/MDS/HAVELLS & Required
out going cables of standard make like
Avocab/Torrent/Polycab/Havells & stud type connector
of standard make like Connectwell.
54 Supplying & laying of Avocab/Torrent/Polycab/Havells Mtr 150 292.00
make following size Control/L.T power cable in readymade
cable trench or by excavating in any type of soil cable
trench size 1 ft. wide 2.5 ft. depth and refilling the same as
per the direction of EIC. Item Includes the cable laying
upto termination box with clamps & proper clamping of
cable on gantries by GI pipe & glands as per direction. Item
includes providing & supply of bricks, sand as per
requirement. The L.T power cable is to be provided by
contractor as per IS:1554 (Part-I). 3.5 Core x 50 mm2
Alluminium, Armoured cable from distribution X'mer to
Main Distribution Board near dist. X'mer and from MDB to
indoor LT panel board (LTPB) - both 2 runs including
termination at both end with supply of required materials.
55 Supplying & laying of Avocab/Torrent /Polycab /Havells/ Mtr 200 175.00
Finolex make following size Control/LT power cable in
readymade cable trench or by excavating in any type of
soil cable trench size 300mm wide and 600mm depth and
refilling the same as per the direction of EIC. Item Includes
the cable laying up to termination box with clamps &
proper clamping of cable on gantries by GI pipe & glands
as per direction. Item includes providing & fixing of bricks,
sand as per requirement to protect cables . The L.T power
cable is to be provided by contractor as per IS:1554 (Part-
I). 4 Core x 25 mm2 Aluminum armoured cable from LT
panel board (LTPB) to Yard Light AC MK (AC Panel-2) and
yard AC Box including termination at both end with supply
of required materials
Seal and signature of contractor
56 Laying of 4C x 4mm2, 4C/7C x 2.5mm2 Armoured, from Mtr 600 19.00
yard-light AC panel-2 to all yard-light fixture junction
boxes on LM & street light pole & Station transformer to
Colony & LT panel to watchman cabin.
Note: Cable laying work either in ready made cable trench
or by excavating in any type of soil if required.(Only laying.
Cable will be supplied by GETCO)
57 Providing & fixing of 'B' class Asian/Jindal/TATA make GI. Mtr 60 180.00
Pipe of 32/40 mm dia for cable looping & road crossing
with necessary elbo/band for each pole & J.Box for yard
lighting & for control-room flud lights wiring work with
fixing on wall with shadles if required as per inst. Of EIC.
(Min 3.25 Mtr/Kg)
58 Providing & erection of 7.0 Mtr. long swaged type welded No 7 9983.00
GI tubular street light poleon the foundation in any type of
soil as per inst. Of E.I.C. confirming to relevant IS and as
per attached Drawing No. GETCO/E/STD/LTG. POLE-R2 Dt.
59 Providing & erection of 4.5 Mtr. long swaged type welded No 7 6988.00
GI tubular street light poleon the foundation in any type of
soil as per inst. Of E.I.C. confirming to relevant IS and as
per attached Drawing No. GETCO/E/STD/LTG. POLE-R2 Dt.
60 Supply and fixing of Pole/Wall/Structure mounted FRP No 30 748.00
junction box standard make of required size with clamp,
providing 1 SPN MCB G class of 16 A having short ckt
breaking capacity of 10KA peak of standard ISI make like
L&T/ANCHOR/MDS /HAVELLS & 2 Nos. of stud type
connector of standard make like Connect well. The cable
glands & lugs are included for both incoming & out going
cables. MCBs shall be of standard make like MDS/HAVELLS
61 Earthing to tubular pole/luminaries,by coil type earthing No 10 400.00
at 10 SWG, GI wire in earth pit of 1.5 mtr. Depth in any
type of solil by using salt/ coke (charcole) 16 kgs each &
remaining filling with BC soil & clamping the earth wire
with pole & Junction box.
62 Providing and fixing of 1 x 250-Watt LED luminaries - No 16 11576.00
Energy Efficient flood light withcomplete allied accessories
having features like powder coated, aluminium
housing,heat resistant toughened glass provided with
gasket(Philips/CGL/Bajaj/GE/Osram/Wipro or equivalent
make). Luminaries to be fixed onswaged pole / GI
structure by providing required fabrications & 4 core
sqmm doubleinsulated flexible stranded wire should be
used from fittings to approved SMC typejunction box as
per inst. of E.I.C.
Seal and signature of contractor
63 Providing & fixing of LED Street Light Fixtures (1x120w) No 7 9593.00
(CGL Cat No. LSTO-120/CDL 120w or Equivalent under cat-
II or above as per R & B SOR) 4-core 2.5mm2 double
insulated flexible stranded wire should be used from
control gear fitting to approved SMC type junction box as
per inst. of EIC.
64 Providing & fixing of 1X 40 W LED Post Top Lantern No 7 7556.00
Fixtures (CGL Cat No. LSTO-40/CDL 40w or Equivalant
under cat- II or above as per R & B SOR) complete fitting in
all respect and 4 core x 2.5 mm2 double PVC flexible
copper cable from control gear fitting to SMC junction box
as per instruction of EIC. ( 4 No are to be provided on
Main gate & 3 No are to be provided on 4.5 Mtr Tubular
TOTAL - 3 ( SCHEDULE B - 3 )
SCHEDULE B - 4 : CONTROL ROOM INDUSTRIAL ELECTRIFICATION
65 Providing and fixing of DBS as AC Panel - 1 for CR, Powder No 1 6738.00
coated Pearl DBS of ivory color, wall mounting, Double
door Distribution board of L&T, Schnieder, Heggar or
higher make reputed ISI(600mm x 600/450mm size) fitted
with 63Amp Phase Bus bar, Earth / Neutral Bars and inter
connecting wires with removable bottom gland plates for
all power cable entry from bottom with DIN Channel
,incoming contact and 1No - 63Amp TPN MCB 'C' Series
,6Nos-20A SP MCB 'C' Series and 15No -10A SP MCB 'C'
Series All MCBs are L&T/ANCHOR/MDS /HAVELLS make
only. Complete in all respect and as per instruction of EIC.
66 Supplying & laying of following size Control/L.T power Mtr 15 175.00
cable of Avocab/Torrent/Polycab/Havells make in
readymade cable trench or by excavating in any type of
soil cable trench size 300mm wide and 600mm depth and
refilling the same as per the direction of EIC. Item Includes
the cable laying up to termination box with clamps &
proper clamping of cable on gantries by GI pipe &
termination on both sides including all materials as per
direction. Item includes providing & fixing of bricks, sand
as per requirement to protect cables . The L.T power cable
to be provided by contractor as under :As per ISI
(Part-I). 4 Core x 25 mm2 Aluminum cable -Armored, from
LT panel board (LTPB) to AC Panel-1 in Control Room
67 Supplying & Laying Sub-main lines of 3X2.5 mm2 ( two for Rmtr 300 125.00
P & N and one for Earthing)copper PVC insulated wier of
ISI brand in suitable standard make steel conduit pipe
having minimum 1.5 mm thickness of approved brand with
ISI brand with clmpes with it's associated accessories for
various circuits emanating from AC panel 1.as per inst. of
Seal and signature of contractor
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Documents for 66KV Dediyasan GIDCSS.pdf
Download all tender documents and submit your bid