Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Eligible as per NIT |
| 2 | Accepted-Technical BANIKHET NAVEEN KUMAR BANIKHET CHAMBA HIMACHAL PRADESH 176303 | CHAMBA | HIMACHAL PRADESH | 176303 | Accepted-Technical Eligible as per NIT |
| 3 | Accepted-Technical | Accepted-Technical Eligible as per NIT |
| 4 | Accepted-Technical | Accepted-Technical Eligible as per NIT |
Tender Value
₹6 L
EMD Value
₹12,000
Closing Date
17 Sept 2026, 5:00 pmClosed
EE JSD CTR
EE JSD CTR
Restoration of rain damages to LWSS Dhuril Samon Kothi in Tehsil Joginder Nagar District Mandi HP SH Replacement of centrifugal pump pump 40 HP set No.1
2026_HPIPH_143039_2
No.-EE-JSV-TA-7463-7572 dated 08.09.2026
Open Tender
Pumps/Motors
Item Rate
90 days
Lad Bharol
Please refer Tender documents.
7 documents required · 7 mandatory
₹350
EE CHAUNTRA
₹12,000
13 Oct 2026
8 Sept 2026
18 Sept 2026
8 Sept 2026
17 Sept 2026
8 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply and errection of horizontal spindle, horizontal split casing/end sucons (back pull out arrangement) single/double/multistage centrifugal pumps or combination of pumps in series/parallel of Mather and Plant/KSB/KIRLOSKAR or JSV approved make conforming to BIS 1520-1980 pump (latest with up to date ammendments) read with BIS:9137-1978 (latest edition) suitable for lifting clear water of under mentioned characteristics with bronze/ suitable alloy. priming funnels, casing ring and shaft motor of bronze, shaft of steel grade EN-8 with cast iron casing coupled directly through a flexible coupling on a common MS/Cast steel plate (Base plate from the principal manufacturer of pumping set) to coupling 3 phase squirrel cage electric induction motor (already present on site) of standar make such as kirloskear/ Ngef/Crompton or JSV approved make conforming to IS12615-2018 (only pump is to be replaced, motor is already present at site) and should be energy efficient minimum IE2 compliant and totally enclosed fan cooled (TEFC) type (latest with upto date ammendments) it should include the cost of bearings, nuts and bolts, painting etc and shall be suitable for operation on the data given below: | 40 | 1 Set of 30 HP | - | - |
| 1.01 | SITE CONDITIONS
Location of Site :- 30 km from Chuantra Division
The altitude of place in which the motor is intended to work in ordinary service if it exceeds 1000 mtr
Humidity :- Weather generally remains humid during monsoon season.
Nature of atmosphere :- As normally encounterd in Shivalik Range
Detail of quality of water :- Clear cold water
Water free from sand or not :- Yes
Water corosive or not :- Not
Turbidity (if any) :- Clear cold water
NPSH available Mts Postive suction
Any other information or requirement
OPERATING CONDITIONS
Type of current :- AC three phase
Operating frequency :- 50 HZ
Rated voltage :- 415 (+/-) 10% volts
System of earthing if any to be adopted :- Double loop earthing as per BIS 3043-1987 latest with upto date ammendments
No. of working hours per day :- 8 hours
Speed of revolution in RPM :- To be quoted by tenderer
Direction of rotation : - To be quoted by tenderer
The max. Temp. of cooling air & water in the place in which the motor is intented to work in ordinary service : - 25 Degree Centigrade | - | - | - | - |
| 1.02 | MOTOR
Ref to BIS code : - BIS 325-1978 read with BIS 900-1992 (latest with upto date ammendments)
Type of enclosure of motor :- TEFC (latest with upto date ammendments)
Type of duty :- Continuous
Mechanical out put in KW :- Suitable for driving centrifugal pumps required for duties specified against pumps.To avoid overloading of motor a margin of about 15-20% may be kept in the rated out put of prime mover.
Class of insulation :- B
Max.permissible temp.rise of motor reqd. if different from given in B(viii) above :- ----- ---
Particulars of test reqd. & where they are to be conducted. :- As per terms & conditions
Particulars as to whether voltage limiting device will be employed :- ATS/star delta starter oil immersed,fully automatic to be installed between bus bar & motor.
Shunt capacitor is also proposed to be installed for improving the power factor at site.
NOTE:- Star delta starter upto 37.5 KW, ATS between 37.5 KW to 50 KW & Stator rotor starter with slip ring motor beyond 50KW Motor whether squirrel cage or slipring :- Squirrel cage
Details of shaft extension reqd. :- Just sufficient to provide direct drive by flexible coupling to pump.
Type of slip ring gear whether continouly rated or for starting purposes only & whether to be fitted with brush lifting or short circuiting arrangements or both if interlocks are rquired. :- Continouslly rated for Squirrel cage/
Breakway torque in terms of rated load torque & the corresponding breakway starting current which may be taken from the supply with the starting apparatus in circuit. :- Breakway torque to be given by the tenderer but the starting current should not exceed 2.5 times of the full load current.
Nature of load & any information regarding the driven machine which has a bearing upon the torque reqd. during the accelerated period, the kinetic energy of the moving parts to be accelrated & No.of starts during a specified period. :- To work the pump offered Where possible fault capacity of the system to which the motor is connected. :- The motor should be able to withstand initial current of 2.5 times the rated current for two minutes without suffering damages or permanent deformations. | - | - | - | - |
| 1.03 | PUMP (BIS 1520-1980 ) read with BIS 9137-1978 both latest with up to date ammendments
Nos of pumps reqd. :- 2 no. pumps one will act as stand bye.
Spare parts required :- For Two years normal maintenance as recommended by manufacturer.
Optional fittings reqd. :- Air cock for exahausting air from each stage
PUMP OPERATING CONDITIONS
Capacity :- 6.78 lps for each pump.
Total head in Mts. :- 233.40 mts
If total head is not known then following details be provided:-
i) Static head 207.30 mts
ii) Minimum depth of water -- Postive suction
iii) Variation in water level -- mts
iv) Ground level to max. water level mts
v) Ground level to delivery point mts
vi) Pressure in the suction tank ____ Kg/cm^2
vii) Pressure in the delivery tank ....... Kg/cm^2
Length of R/Main 1500 mts
Dia of R/Main 100 mm
Drive arrangement Direct through flexible coupling on a common base plate
Drive type Electric driven
NPSH reqd. To be quoted by the tenderer
Limits of total head in which the pump is reqd. to operate. (-) 15% to (+) 10% of total head.
Suction/delivery size of pump To be specified by the tenderer
Efficiency of pump at To be specified by the tenderer
a) duty head b) (+)10 % head c) (-)15 % head
Material of construction :- To be specified by the tenderer (manufacturer~s certficate to be appended) | - | - | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.35 MB
02Form6.pdf
Tender Documents • 0.19 MB
03Form8.pdf
Tender Documents • 1.37 MB
condition.pdf
Tender Documents • 0.41 MB
BOQ_212453.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .