Tender Value
₹5.5 Cr
EMD Value
₹11 L
Closing Date
25 Aug 2026, 6:00 pm
DCE (Z, Melting, EPC, U and SR)
O/o General Manager (M-Zr, Utilities and SR), 1st Floor, PD and Utilities Building, Nuclear Fuel Complex, Hyderabad-500062.
Engineering, Procurement and Commissioning of a Demineralized Water Treatment Plant including allied Mechanical, Electrical and Instrumentation Works at NFC, Hyderabad
2026_NFC_915907_1
NFC/UTLS/EPC-DMP/NIT/2026/01
Open Tender
Machineries/ Mechanical Engg Items
548 days
NFC, Hyderabad
As per NIT PART A
7 documents required · 7 mandatory
₹0
₹11 L
NFC, Hyderabad
6 Jul 2026
6 Jul 2026
1 Sept 2026
6 Jul 2026
25 Aug 2026
7 Jul 2026
7 Jul 2026 - 28 Jul 2026
30 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1MECHANICAL COMPONENTS AS SPECIFIED IN SECTION B1 OF NIT-PART B (Excluding Instrumentation) | |||||
| 1.01 | Design, fabrication, factory testing, supply, unloading at site, erection, site testing and commissioning of a complete Demineralized (DM) Water Treatment Plant, including all mechanical components, fixing and grouting of foundation bolts along with necessary pre-commissioning activities such as flushing, initial filling of ion exchange resins and filtration media, dosing of regeneration chemicals, trial operation and Performance Guarantee (PG) Testing. The scope also includes documentation, training and final acceptance in accordance with Sections C and D of NIT – Part B. The DM Water Treatment Plant shall include, but not be limited to, the following major components and any other items necessary to ensure complete erection and reliable operation of the system as required under Section D Clause B of NIT – Part B:
(a) Multi Grade Sand Filter (MGSF) conforming to Clause B1.3 – 1 No.
(b) Activated Carbon Filter (ACF) conforming to Clause B1.4 – 1 No.
(c) Air Scouring Blower (ASB) conforming to Clause B1.5 – 2 Nos.
(d) Strong Acid Cation (SAC) Exchanger conforming to Clause B1.6 – 1 No.
(e) Acid Measuring Cum Dilution Tank for SAC (ACT-SAC) conforming to Clause B1.7 – 1 No.
(f) Degasser Tower (DGT) conforming to Clause B1.8 – 1 No.
(g) Degasser Tower Air Blowers (DGTABs) conforming to Clause B1.9 – 2 Nos.
(h) Degassed Water Storage Tank (DGWST) conforming to Clause B1.10 – 1 No.
(i) Degassed Water Transfer Pumps (DGWPs) conforming to Clause B1.11 – 2 Nos.
(j) Strong Base Anion (SBA) Exchanger conforming to Clause B1.12 – 1 No.
(k) Alkali Measuring Cum Dilution Tank for SBA (ALT-SBA) conforming to Clause B1.13 – 1 No.
(l) Mixed Bed Unit–1 (MB-1) conforming to Clause B1.14 – 1 No.
(m) Mixed Bed Unit–2 (MB-2) conforming to Clause B1.14 – 1 No.
(n) Common Acid Measuring Cum Dilution Tank for MB-1 & MB-2 (CACT-MB) conforming to Clause B1.15 – 1 No.
(o) Common Alkali Measuring Cum Dilution Tank for MB-1 & MB-2 (CALT-MB) conforming to Clause B1.16 – 1 No.
(p) Mixed Bed Units Air Blowers (MBUAB) conforming to Clause B1.17 – 2 Nos.
(q) DM Water Regeneration Pumps (DMWRPs) conforming to Clause B1.18 – 2 Nos.
(r) Acid Measuring Tank for Neutralization Pit (ACT-NPT) conforming to Clause B1.19 – 1 No.
(s) Alkali Measuring Tank for Neutralization Pit (ALT-NPT) conforming to Clause B1.20 – 1 No.
(t) Interconnecting Piping, Valves & Fittings of DM Plant conforming to Clause B1.27 – 1 Lot. | 1 | Lot | - | - |
| 1.02 | Design, fabrication, factory testing, supply, unloading at site, erection, site testing, and commissioning of the Raw Water Storage Tank (RWST) - 75 kl - Mild Steel, including foundation bolts, grouting, and any other items necessary for complete installation and operation, as per site conditions and conforming to the technical requirements specified in Section B1.1. The scope also includes documentation and final acceptance in accordance with Sections C and D of NIT – PART B. | 1 | No | - | - |
| 1.03 | Design, fabrication, factory testing, supply, unloading at site, erection, site testing, and commissioning of Raw Water Pumps (RWPs), including baseplates, couplings, alignment, foundation bolts, grouting, and any other items necessary for complete installation and operation, as per site conditions and in conformity with the technical requirements specified in Section B1.2. The scope also includes trial operation, performance guarantee (PG) testing, documentation, and final acceptance in accordance with Sections C and D of NIT – PART B. | 2 | Nos | - | - |
| 1.04 | Design, fabrication, factory testing, supply, unloading at site, erection, site testing, and commissioning of the Bulk Acid Storage Tank (BACST) - 25 kl - XLPE, including foundation bolts, grouting, and any other items necessary for complete installation and operation, as per site conditions and conforming to the technical requirements specified in Section B1.21. The scope also includes documentation and final acceptance in accordance with Sections C and D of NIT – PART B. | 1 | No | - | - |
| 1.05 | Design, fabrication, factory testing, supply, unloading at site, erection, site testing, and commissioning of the Bulk Alkali Storage Tank (BALST) - 25 kl - XLPE, including foundation bolts, grouting, and any other items necessary for complete installation and operation, as per site conditions and conforming to the technical requirements specified in Section B1.22. The scope also includes documentation and final acceptance in accordance with Sections C and D of NIT – PART B. | 1 | No | - | - |
| 1.06 | Design, fabrication, factory testing, supply, unloading at site, erection, site testing, and commissioning of Acid Unloading Pumps (ACUP) - 200 LPM - 10 MLC - PVDF, including baseplates, couplings, alignment, foundation bolts, grouting, and any other items necessary for complete installation and operation, as per site conditions and in conformity with the technical requirements specified in Section B1.23. The scope also includes trial operation, performance guarantee (PG) testing, documentation, and final acceptance in accordance with Sections C and D of NIT – PART B. | 2 | Nos | - | - |
| 1.07 | Design, fabrication, factory testing, supply, unloading at site, erection, site testing, and commissioning of Alkali Unloading Pumps (ALUP) - 200 LPM - 10 MLC - PVDF, including baseplates, couplings, alignment, foundations, foundation bolts, grouting, and any other items necessary for complete installation and operation, as per site conditions and in conformity with the technical requirements specified in Section B1.24. The scope also includes trial operation, performance guarantee (PG) testing, documentation, and final acceptance in accordance with Sections C and D of NIT – PART B. | 2 | Nos | - | - |
| 1.08 | Design, fabrication, factory testing, supply, unloading at site, erection, site testing, and commissioning of the DM Water Storage Tank (DMWST) - 75 kl - SS 304, including foundation bolts, grouting, and any other items necessary for complete installation and operation, as per site conditions and conforming to the technical requirements specified in Section B1.25. The scope also includes documentation and final acceptance in accordance with Sections C and D of NIT – PART B. | 1 | No | - | - |
| 1.09 | Design, fabrication, factory testing, supply, unloading at site, erection, site testing, and commissioning of DM Water Supply Pumps (DMWSPs) - 50 m3/h - 40 MLC - SS 316, including baseplates, couplings, alignment, foundation bolts, grouting, and any other items necessary for complete installation and operation, as per site conditions and in conformity with the technical requirements specified in Section B1.26. The scope also includes trial operation, performance guarantee (PG) testing, documentation, and final acceptance in accordance with Sections C and D of NIT – PART B. | 4 | Nos | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.97 MB
Tendernotice_2.pdf
PDF • 1.70 MB
NITPARTB.pdf
Tender Documents • 1.68 MB
TES.xls
Tender Documents • 0.06 MB
BOQ_962555.xls
BOQ • 0.34 MB
AERBSAFETYGUIDELINES.pdf
Additional Documents • 0.28 MB
Download all tender documents and submit your bid