| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.7 LAccepted-AOC WARD NO 5 THIRIYA NIZAWAT KHAN BAREILLY 243123 UP | BAREILLY | BAREILLY | UTTAR PRADESH | 243123 | L1 | Accepted-AOC Over all rates are reasonable and lowest. | |
| 2 | L2₹22.6 L+₹59,655 (2.71%)Rejected-Finance | L2 | Rejected-Finance Over all rates are higher than L-1. | |
| 3 | L3₹22.8 L+₹78,285 (3.55%)Rejected-Finance C 3 SHAHDANA COLONY BAREILLY 243005 | BAREILLY | BAREILLY | UTTAR PRADESH | 243005 | L3 | Rejected-Finance Over all rates are higher than L-1. | |
| 4 | L4₹24.3 L+₹2.3 L (10.2%)Rejected-Finance | L4 | Rejected-Finance Over all rates are higher than L-1. | |
| 5 | L5₹24.5 L+₹2.5 L (11.2%)Rejected-Finance | L5 | Rejected-Finance Over all rates are higher than L-1. |
| Sl No | Description | Qty | Unit | multiple alliance enterprises L9 | JAI SRI RAM ASSOCIATE L2 | SHRI BALA JI STORE L7 | RIYASAT ALI KHAN L1 | hardeep singh enterprises L3 | novell engineers L8 | M/S Alam Construction Co L4 | M/S HAMZA CONSTRUCTION L5 | M J ENTERPRISES L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of brick work built in cement mortar complete all as specified and directed. | 52 | Cum | 490 ₹25,480 | 300 ₹15,600 | 100 ₹5,200 | 100 ₹5,200 | 250 ₹13,000 | 60 ₹3,120 | 100 ₹5,200 | 50 ₹2,600 Lowest | 200 ₹10,400 |
| 2.00 | Demolition cement concrete (un reinforced)in ground floor and packing n exc 15 cm thickness (bellower above ground level) complete all as specified and directed. | 50 | Cum | 490 ₹24,500 | 250 ₹12,500 | 150 ₹7,500 | 100 ₹5,000 | 250 ₹12,500 | 80 ₹4,000 | 100 ₹5,000 | 60 ₹3,000 Lowest | 250 ₹12,500 |
| 3.00 | Demolition of cement concrete (reinforced) Roof,floors (Other than ground floors ) beams,Staircase ,landing chajja, and similar suspended work in cement concrete is reinforforced (reinforcement cut as required to facilotate demolition complete all as specified and directed. | 1.5 | Cum | 850 ₹1,275 | 500 ₹750 | 150 ₹225 | 150 ₹225 | 400 ₹600 | 100 ₹150 | 500 ₹750 | 50 ₹75 Lowest | 150 ₹225 |
| 4.00 | Taking down cement plaster from brick wall including racking out joints hacking for key and scrubbing down with water upto 12.00 m ht. complete all as specified and directed. | 1,200 | Sqm | 15 ₹18,000 | 20 ₹24,000 | 20 ₹24,000 | 10 ₹12,000 | 8 ₹9,600 Lowest | 10 ₹12,000 | 10 ₹12,000 | 16 ₹19,200 | 10 ₹12,000 |
| 5.00 | Dismantling asbestos cement (corrugated,semi corrugated etec ) sheets in roof covering complete all as specified and directed. | 335 | Sqm | 10 ₹3,350 | 40 ₹13,400 | 15 ₹5,025 | 30 ₹10,050 | 10 ₹3,350 | 8 ₹2,680 | 7 ₹2,345 Lowest | 15 ₹5,025 | 10 ₹3,350 |
| 6.00 | Dismantling wrought iron or mild steel work of any description not otherwise provided for complete all as specified and directed. | 2.4 | Qtl | 240 ₹576 | 1,000 ₹2,400 | 200 ₹480 | 200 ₹480 | 200 ₹480 | 50 ₹120 Lowest | 200 ₹480 | 50 ₹120 Lowest | 300 ₹720 |
| 7.00 | M & L for brick work with sub class ‘B’ brick straight or curved on plan exc 6 Mtr mean radius built in CM (1:6) complete all as specified and directed. | 35 | Cum | 4,500 ₹1,57,500 | 2,750 ₹96,250 | 3,500 ₹1,22,500 | 2,350 ₹82,250 | 2,250 ₹78,750 | 3,000 ₹1,05,000 | 2,200 ₹77,000 | 2,000 ₹70,000 Lowest | 4,200 ₹1,47,000 |
| 8.00 | Removing Cement mortar or cement lime mortarr from and cleaning bricks, stacking for measurement including all extra handling and removal and disposing off rubbish complete all as specified and directed. | 6.8 | 1000 Nos | 500 ₹3,400 | 1,000 ₹6,800 | 1,000 ₹6,800 | 500 ₹3,400 | 600 ₹4,080 | 500 ₹3,400 | 500 ₹3,400 | 250 ₹1,700 Lowest | 800 ₹5,440 |
| 9.00 | All as per item no 8 above but expect bricks complete all as specified and directed. | 17 | Cum | 2,200 ₹37,400 | 1,400 ₹23,800 | 1,500 ₹25,500 | 1,500 ₹25,500 | 1,500 ₹25,500 | 1,500 ₹25,500 | 2,000 ₹34,000 | 250 ₹4,250 Lowest | 1,800 ₹30,600 |
| 10.00 | M & L in repairs Galvalised mild steel wire netting of chicken wire mesh 0.46 mm nominal dia of wire & 10 mm mesh size all as spd fixed to walls roof etc & directed by Engr-in-charge. | 15 | Sqm | 630 ₹9,450 | 350 ₹5,250 | 200 ₹3,000 Lowest | 350 ₹5,250 | 240 ₹3,600 | 400 ₹6,000 | 360 ₹5,400 | 500 ₹7,500 | 350 ₹5,250 |
Tender Value
₹35 L
EMD Value
₹70,000
Closing Date
24 Sept 2025, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE (West) Bareilly
GE (West) Bareilly
REPAIR TO ROOF SHEET, PARAPET WALLS, PLASTERING WORKS RAIN WATER PIPE LINES, PLINTH PROTECTION AND BRICK WORK IN ZONE VI AND VII UNDER AGE BR-I UNDER GE(WEST) BAREILLY
2025_MES_728233_1
8281/C/E8
Open Tender
Civil Works
Item Rate
180 days
GE (West) Bareilly
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE (West) Bareilly
₹70,000
Yes
21 Nov 2025
28 Aug 2025
26 Sept 2025
28 Aug 2025
24 Sept 2025
12 Sept 2025
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .