Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹55.9 LAccepted-Finance AT PO BAURIMUNDA PS SADAR SUNDARGARH DIST SUNDARGARH | BAURIMUNDA | SUNDARGARH | ODISHA | ₹55.9 L | 1 | Accepted-Finance ADMITTED TO LOTTERY ON THE BASIS OF QUOTED AMOUNT |
| 2 | 1₹55.9 LAccepted-Finance | ₹55.9 L | 1 | Accepted-Finance ADMITTED TO LOTTERY ON THE BASIS OF QUOTED AMOUNT |
| 3 | 1₹55.9 LAccepted-Finance AT GUNDIADIHI P O DANDPANI PS KINJIRKELA DIST SUNDARGARH ODISHA PIN 770012 | KINJIRKELA | SUNDARGARH | ODISHA | 770012 | ₹55.9 L | 1 | Accepted-Finance ADMITTED TO LOTTERY ON THE BASIS OF QUOTED AMOUNT |
| 4 | 1₹55.9 LAccepted-Finance | ₹55.9 L | 1 | Accepted-Finance ADMITTED TO LOTTERY ON THE BASIS OF QUOTED AMOUNT |
| 5 | 1₹55.9 LAccepted-Finance JHARGAON JHARGAON LEPHRIPADA SUNDARGARH ODISHA 770002 | SUNDARGARH | ODISHA | 770002 | ₹55.9 L | 1 | Accepted-Finance ADMITTED TO LOTTERY ON THE BASIS OF QUOTED AMOUNT |
Tender Value
₹55.9 L
EMD Value
₹55,930
Closing Date
20 May 2026, 5:00 pmClosed
BDO , SUBDEGA
SUBDEGA
Improvement of Rajamunda Tank at Kukiridihi,Block subdega
2026_PRZSU_129269_6
1/PSS/2026-27
Open Tender
Civil Works - Others
180 days
SUBDEGA
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
BDO SUBDEGA
₹55,930
21 May 2026
14 May 2026
21 May 2026
14 May 2026
20 May 2026
14 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | E/W of any approved type soil in approved borrow area by mechanical means loading into and transportation by mechanical means and unloading the soil. | 16,980 | Cum. | 83.53 | ₹14,18,339.4 | BI01010001010000000000000515BI0100001114 |
| 2 | Earth work in excavation of foundation in hard soil or gravelly soil including dressing and leveling the bed. | 215.37 | Cum. | 282.9 | ₹60,928.17 | BI01010001010000000000000515BI0100001115 |
| 3 | Filling F & P with sand, well watered and rammed with cost, carriage and royalty etc. complete | - | Cum. | 596.3 | - | BI01010001010000000000000515BI0100001116 |
| 4 | Cement Concrete in (1:3:6) using 40mm. Size CBHG metal including laying compacting, Curing with cost, carriage and royalty etc. complete | 209.09 | Cum. | 6,644.1 | ₹13,89,214.87 | BI01010001010000000000000515BI0100001117 |
| 5 | C.C. (1:2:4) with 12mm and down grade C.B. chips including cost, carriage, royalty, cost of all labour T.&P. etc complete and as directed by E.I.C. | 46.22 | Cum. | 8,242.9 | ₹3,80,986.84 | BI01010001010000000000000515BI0100001118 |
| 6 | Rough stone Dry packing in approns and revetments with hard granite stones | - | Sqm | 2,760.7 | - | BI01010001010000000000000515BI0100001119 |
| 7 | Grouting approns and revetment 15 cm deep with cement concrete (1:4:8) with 2.5 cm broken granite metal per Sqm | - | Sqm | 230.6 | - | BI01010001010000000000000515BI0100001120 |
| 8 | P/F 60 mm thick factory made C.C interlocking paver Block of M-30 grade made by block making machine over and i/c 50 mm thick bed of C. sand, filling the joints. | - | Sqm. | 490.1 | - | BI01010001010000000000000515BI0100001121 |
| 9 | Rigid and smooth centering and shuttering for R.C.C. work and dismantling then after casting including cost of all materials complete-Mass Concrete | 865.14 | Sqm. | - | - | BI01010001010000000000000515BI0100001122 |
| 10 | Cost of Transperancy Board | - | unit | 4,000 | - | BI01010001010000000000000515BI0100001123 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.59 MB
DTCN.pdf
Tender Documents • 1.67 MB
BOQ_591279.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid