Executive Engineer (O&M)
Tender for ARC of Erection of HT/LT line,T/C work & Maintenance & U/G Work coastal and or other scheme for HANSOT SDN UNDER Ankleshwar (O&M) Division.
338739
E-29(2026-27)
Open
Power/Energy Projects/Products/Services
Works
Bharuch
15 documents required · 14 mandatory · 1 optional
₹2,360
DGVCL
₹45,000
25 Aug 2026
25 Aug 2026
25 Aug 2026
2 Sept 2026
25 Aug 2026
3. DESCRIPTION OF WORK: As mentioned in the Schedule ‘B’.
The quantities mentioned in the accompanying Schedule are only approximate. Actual quantities may increase or
decrease according to the requirements. The company reserves the right to revising or deleting any of the quantities
actually executed by the contractor will be calculated and paid at the rate given in contract schedule of rates.
5. PERIOD OF CONTRACT:
The contract will remain in force for 1 Year. The contractor shall on completion of the work, prepare and render the
final detailed material account of the material received by him from the company store within one month from the
date of completion of work. If however, the contractor does not render the material account, Regd. A.D. Notice will
be issued to the contractor to render the material account within 10 days from the date of Notice, failing which the
material account, will be finalized and recoveries will be made as per the company’s procedure which shall have to
be accepted by the contractor and dispute if any raised shall not be entertained.
For delay in work the contractor will be liable for penalty at a rate of 1/2% per week (7 Days a week) subject to
maximum 10% of value of uncompleted work.
In case of Damage to government/Utility assets due to Non-Usage of CBUD Application before execution of any
excavation/digging activity recovery and penalties must be imposed on the contractor/agency.
7. JURISDICTION: For any disputes the jurisdiction shall be circle office and the decision of CEO & SE (RURAL)
shall be final.
8. SECURITY DEPOSIT:
The successful tenderer will have to pay security deposit equivalent of 5% of the order value. This amount will be
payable either in cash or through demand draft on any Schedule bank drawn in favor of DGVCL. This amount will be
refundable after completion of work and/upon submission of NOC of engineer-in-charge. Order will be issued to
successful bidder after payment of security deposit.
If during 12 calendar months from the date of handing over charge after completion of work, the erected lines are
found defective in any way the same should be made good by the contractor free of cost.
10. INDEMNITY BOND:
The contractor will have to execute an indemnity bond on stamp paper of Rs.300/- at his cost before commencement
of work stating that for any accident to the contractor’s staff/equipment of any person or any other fatal or non-fatal
due to non-observing of safety measures, DGVCL shall not be held responsible.
11. SOLVENCY CERTIFICATE:
He shall have to produce the solvency certificate as per the company’s rules if the order value exceed Rs.15000/-.
The contractor will also have to execute an agreement on a non-judicial stamp paper ofRs.300/300/ Revenue stamp
affixed on it, in line of acceptance of contract.
13. CONTRACTOR’S LIABILITY:
For any accident either fatal or non-fatal to the workers due to non-observance of the safety measures and line
clearance procedure, company shall not be held responsible.
14. GENERAL TERMS & CONDITION OF THE CONTRACT:
All other terms & condition as specified in tender & contract booklet of DGVCL shall be binding to the contractor.
15. UNDERTAKING BY CONTRACTOR:
Should this tender be accepted I/We hereby agree to abide by and fulfill all the terms and conditions/provisions of
the ‘Tender’ and contract for works as applicable and in default thereof to forfeit and payable to the company the
sum/s of money as may become due.
16. INCOME TAX:
Income tax will be deducted from contractor’s bills.
GST is applicable as per the finance Act-2017 or latest revision. The registration with government for GST is
must. Otherwise it is mandatory to submit letter head on which bidder has to clearly mention whether GST to
be paid is eligible or not.
The bidder shall quote in the appropriate schedule of bid form on item rate / % above or below basis. However,
the financial evaluation will be done as per commercial clause 4.2. Prices quoted should be FIRM and Total Unit End
Cost with GST and Cess as applicable stating the Unit Ex- works price, freight, packing & forwarding charges,
Insurance Charges, GST and Cess as applicable Separately in price bid, which is a must.
If the Supplier/Contractor has opted for the Composition scheme of GST, the same must be clearly specified with
valid declaration & self-certified Certificate from Department. In the event of withdrawal/cessation of the Supplier
from Composition scheme during the tenure of the contract, the rate (i.e. Price) mentioned in the price bid shall be
final and any additional GST will have to be borne by the Bidder himself. In no case additional amount towards GST
or otherwise will be paid / reimbursed to supplier/contractor. Further Statutory Variation clause will not be applicable
in case of Supplier / Contractor has opted for Composition Scheme under GST.
Also, please mention separate applicable HSN / SAC Code and rate of GST and Cess as applicable for each item of
Goods/Service. If not specifically mentioned, then COMPANY will have the option to take the prices as exclusive of
taxes and duties at maximum higher slab rates for the evaluation of the Bids.
The offered prices to be indicated in online mode of Bid in the format given (i.e. Schedule). The price bid submitted
in physical mode shall not be considered.
The Bidder should invariably indicate the total unit end cost price considering all their costs / calculations in the Price
bid itself for each item and all sub-items if any. This is a must. Cost components hidden / furnished elsewhere will
not be considered and will be ignored out rightly.
19 DELAYED AND LATE BIDS
No Bid shall be accepted/opened in any case which are received after due date and time of the receipt of Bid
irrespective of delay due to postal services of any other reasons and company shall not assume any responsibility
for late receipt of Bid. Any correspondence in the matter will not be entertained.
20 REJECTION OF BID
The Bidders is expected to examine all instructions, terms, conditions, schedules and other details called for in this
specification and keep himself fully informed about all which may, in any way, affect the work, or cost thereof. Failure
to furnish the required information or submission of Bid not as per the specification will be at the Bidders risk may
result in rejection.
The offer is liable summarily rejected if it contains:
Deviation / Addition / Alternations / Omissions in bidding schedules.
Deviation and contradictions to the terms and conditions specified in this Bid.
21 DGVCL’S RIGHT
The DGVCL reserves the right to terminate this contract or part thereof at any time during its tendency without giving
notice of Termination or the reasons thereof.
The Bidders shall specifically note that any over writing or corrections or manuscript in the bid shall be ignored and
will not be considered authentic unless same are signed with Bidder's Stamp/Seal
DGVCL reserves the right to split the contract into two or more bidders. In such cases, the term for completion period
will be negotiated and reduced proportionate to the order quantity/value.
In case of any doubt or interpretation of the terms and condition, the decision of the SUPERINTENDING ENGINEER,
CIRCLE OFFICE, DGVCL will be final and binding upon the Bidders and no dispute in this regard will be entertained.
DGVCL reserves the right to accept any bid or reject any or all Bids or cancel /withdraw RE INVITATION to bid
without assigning any reason. Such decision of the DGVCL shall not be subject to question by any Bidders and the
DGVCL shall bear no liability whatsoever for such decision.
The Contractor shall guarantee in accordance with the Contract documents and free from defects in
material/equipment supplied by contractor like Indoor / Outdoor / Joint kits, HDPE Pipes etc. and workmanship for
a period of twelve (12) calendar months from date of completion of sub work order by contractor. For the same,
sticker must be provided incorporating Date of Installation and due date of guarantee on materials used by Successful
23 COMPLETION PERIOD
The execution of this contract shall be completed within 12/18/24/36 months after commencement period of 30 days
from the date of letter of acceptance (LOA).
The concern field office of Ankleshwar Rural Division / Bharuch Circle will issue sub work order as a part of Contract
as per requirement. The work completion period of each sub work order will be decided by concern Engineer-in-
Charge from the date of issue of sub work order.
The work completion period of all sub work orders cannot exceed the total period of original work order.
The completion date will be deemed to be the date on which all works of the sub work orders are demonstrated to
be completed in all respects as per the terms and conditions of this contract to the satisfaction of the DGVCL /
Successful bidder has to submit technical utilize actually.
24 Underground works
During excavation if existing underground network are noticed and the same is needed to be removed / relocated,
the cost of removal / relocation shall be determined by the Engineer-in-Charge, on the basis of awarded rate of
contract or SOR rate of DGVCL / State Government / Central Government Utilities and reimbursed to the contractor
after getting approval of AT as per DOP of DGVCL. Other than power utility, Engineer – in – Charge shall inform
concerned stakeholders for relocating the same.
The Contractor shall be liable for and shall indemnify the Employer against all losses, expenses or claims arising in
connection with the death of or injury to any person employed of the Contractor or his sub- Contractors for the
purposes of the Works.
26 TERMINATION OF CONTRACT ON OWNER`S INITIATIVE
The Owner reserves the right to terminate the Contract either in part or in full due to reasons other than those
mentioned under clause entitled ‘Contractor’s Default’. The Owner shall in such an event give fifteen (15) days’ notice
in writing to the Contractor of his decision to do so.
The Contractor upon receipt of such notice shall discontinue the work on the date and to the extent specified in the
notice, make all reasonable efforts to obtain cancellation of all orders and Contracts to the extent they are related
to the work terminated and terms satisfactory to the Owner, stop all further sub-contracting or purchasing activity
related to the work terminated, and assist Owner in maintenance, protection, and disposition of the works acquired
under the Contract by the Owner. In the event of such a termination the Contractor shall be paid compensation,
equitable and reasonable, dictated by the circumstances prevalent at the time of termination.
If the Contractor is an individual or a proprietary concern and the individual or the proprietor dies and if the Contractor
is a partnership concern and one of the partners dies then unless the Owner is satisfied that the legal representatives
of the individual Contractor or of the proprietor of the propriety concern and in the case of partnership, the surviving
partners, are capable of carrying out and completing the Contract the Owner shall be entitled to cancel the Contract
as to its in completed part without being in any way liable to payment of any compensation to the estate of deceased
Contractor and/or to the surviving partners of the Contractor’s firm on account of the cancellation of the Contract.
The decision of the Owner that the legal representatives of the deceased Contractor or surviving partners of the
Contractor’s firm cannot carry out and complete the Contract shall be final and binding on the parties. In the event
of such cancellation the Owner shall not hold the estate of the deceased Contractor and/or the surviving partners of
the estate of the deceased Contractor and/or the surviving partners of the Contractor’s firm liable to damages for
not completing the Contract.
27 RESOLUTION OF DISPUTES, SETTLEMENT OF DISPUTES
a. Any dispute(s) or difference(s) arising out of or in connection with the Contract shall, to the extent possible, be
settled amicably between the parties.
b. If any dispute or difference of any kind, whatsoever, shall arise between the Owner and the Contractor, arising
out of the Contract for the performance of the Works whether during the progress of the Works or after its
completion or whether before or after the termination, abandonment or breach of the Contract, it shall, in the
first place, be referred to and settled by the Engineer, who, within a period of thirty (30) days after being
requested by either party to do so, shall give written notice of his decision to the Owner and the Contractor.
c. Save as hereinafter provided, such decision in respect of every matters so referred shall be final and binding
upon the parties until the completion of the Works and shall forthwith be given effect to by the Contractor who
shall proceed with the Works with all due diligence, whether he or the Owner requires arbitration as hereinafter
provided or not.
If after the Engineer has given written notice of his decision to the parties, no claim to arbitration has been
communicated to him by either party within thirty (30) days from the receipt of such notice, the said decision shall
become final and binding on the parties.
28 EMPLOYMENT OF LABOUR
Persons below the age of 18 years shall not be employed for the work. No female worker shall be employed in the
night shift between 07.00 p.m. and 06.00 a.m. next day.
Contractor shall maintain a valid labour license under the Contract Labour (Regulation and Abolition) Act for
employing necessary manpower required by him. In the absence of such a license, the contract shall be liable to be
terminated without assigning any reason thereof. Contractor should also employ qualified and experiences persons
as per requirement of Electricity Act and rules for carrying out supply and erection work under this contract.
In case Ankleshwar Rural Division becomes liable to pay any wages or dues to labour or any Government agency
under any of the provisions of the Minimum Wages Act, Payment of Wages Act, Employee Compensation Act,
Contract Labour Regulation Abolition Act, Employee Provident Fund or any other law due to act of omission of the
Contractor, Ankleshwar Rural Division may make such payment and shall recover the same from the Contractor’s
29 PENALTY FOR DELAY
29.1 The time limit allowed for carrying out the work as entered in Bid shall strictly observed by the contractor. The
work shall throughout the stipulated period of contract proceeds with due diligence (time being essence of
29.2 The execution of this contract shall be completed within 12/24/36 months after commencement period of
days from the date of letter of acceptance (LOA).
29.3 If the work is not completed within the scheduled period as prescribed in Sub Work Order,
penalty shall be @ 0.5% per Week or part thereof plus applicable tax (if any) subject to ceiling of
10% plus applicable tax (if any) of the Sub Order Value with GST and Cess as applicable rates. This
will be deducted from the bills payable either against this contract or any bank guarantee or any
other amount payable under any contract with the DGVCL.
29.4 For calculating delayed portion, start date of sub work order for penalty calculation will
be the Day / Date on which the first material is issued against the Sub work order and final
date of actual completion of work shall be consider. The penalty will be invariably deducted from the
bill of the contractor and no refund will be given unless the competent authority approved the waiver/
reduction in penalty. In case of material supplied late by Ankleshwar Rural Division to the contractor, clause
no. 32.13 shall be applicable.
29.5 The concern field office of Ankleshwar Rural Division /Bharuch Circle will issue sub work order as a part of
contract as per requirement. The work completion period of each sub work order will be decided by concern
Engineer-in-Charge from the date of issue of sub work order. The delay of commissioning is liable for penalty.
29.6 Penalty for non-submission of bills timely: Sub work order wise bill along with excess material credited
to store to be submitted by contractor within 30 days from the date of work completion. If the bill for the
work, after reconciling inventory given to contractor and depositing back the surplus material to respective
RSO / Divisional Stores, is not submitted within three months from the work completion date as per work
completion date, then penalty @ Rs. 500 per week or part thereof plus applicable GST subject to maximum
of 10% of order value plus applicable GST will be deducted.
29.7 Penalty for violating safety rules: During the execution of Work, if Contractor/Labour are found violating
the Safety rules and Regulations, then Engineer-in-Charge will serve the warning Notice on first Instance.
On second Instance the amount of Fine will be Rs. 500.00 or 0.1 % of amount of SWO (Whichever is higher)
with GST and cess. Even If after above two instances, still Contractor found violating Safety Rules and
Regulations then Procedures for Stop dealing shall be initiated against him as per rules and regulations.
29.8 In case of Damage to government/Utility assets due to Non-Usage of CBUD Application before
execution of any excavation/digging activity recovery and penalties must be imposed on the
contractor/agency.
30. MINOR CIVIL WORKS:
During the installation / erection of the outdoor equipments /materials or any other erection activity as per
the scope of tender, any civil structure / slab, wall, road, Indoor or Outdoor cable trench etc. which may
need to be altered / modified or damaged shall be rectified / made it good by the successful bidder at no
extra cost to the DGVCL within stipulated time period. No deviation in the time limit of work would be
considered on account of the above repairing/modification of civil work.
Bidder/Contractor shall be put under Stop Deal due to following reasons.
32 Has submitted fake, false or forged documents/certificates.
33 Has revised/withdrawn price bid after opening of Techno: commercial bid, until and unless it is sought
34 Has tampered with the stipulated tendering process.
35 Has refused to accept Letter of Acceptance/Purchase Order/Work Order after the same is issued by the
Company within the validity period and as per agreed terms and conditions.
36 Has committed breach of contract or has failed to perform a contract or has abandoned the contract.
37 Has failed to provide suitable expertise for the work as per prescheduled program
38 Has failed to submit all the necessary Test reports/documents within time schedule / as per Company's
time limit, as mentioned in the LOA, if the Letter of Acceptance (LOA) is placed subject to submission
of type reports / documents to the firm.
39 Has indulged in construction and erection of defective works.
40 Has supplied inferior quality / defective materials and refused to replace with stipulated time frame, as
specified by the company.
41 Has substituted materials In lieu of materials supplied by the Company or has not returned or has short
returned or has unauthorized disposed of materials/ documents/ drawings/ tools or plants or equipment
supplied by the Company
42 Has involved in malpractices such as bribery, corruption, fraud, canvassing and pilferage
43 Has unauthorized obtained official company information or copies of documents, in relation to the
Tender/Contract
44 Has failed to follow the stipulated mode of communication, if specified by the tendering authority/
45 Any other ground for which in the opinion of the Company makes it undesirable to deal with the Firm,
46 In case the State Government directs the Company to place a firm in stop dealing/ banned for business
dealing/ blacklisting
47 The firm, stop deal and/or banned for business dealing and/ or blacklist by GUVNL or any subsidiary
Companies of GUVNL shall be considered as a stop deal and/ or banned for business dealing and/ or
blacklisting for all Companies.
48 Effect of putting a proprietor/firm for Stop dealing/Banned for business dealing are as below:
48.1 The proprietor/all the partners/directors of the stop deal/ banned for business dealing/ blacklisting firm
shall also be considered for stop deal/ banned for business dealing.
48.2 Once the name of the firm and/ or proprietor/ partner/ director of the firm appears in the list of Stop
dealing / Banned for business dealing in any Company of GUVNL and its Subsidiary Companies,
I. No enquiry shall be issued to a firm.
II. No bids / tender shall be considered for evaluation and the bid submitted by the Firm shall be
48.3 Action to be taken, when a Firm and/or proprietor/ partner/ director of the firm is put on Stop dealing/
Banned for business dealing by GUVNL or any of its subsidiary Companies, during tender process: -
I. Before opening Technical bids, the bid submitted by the Firm will be treated as “Disqualified Bid”
and automatically stand as “Rejected Bid” at the time of scrutiny of Preliminary / Technical Bid.
II. After opening Technical bid but before opening the price bid, the price bid of the Firm should not
be opened and the bid submitted by the Firm will be treated as “Disqualified Bid” and
automatically stand as “Rejected Bid” at the time of scrutiny of Technical Bid.
III. After opening of price bid, the offer of the Firm should be ignored and will not be further
evaluated. The Firm will not be considered for issue of order even if its price is the lowest. In this
situation, the next lowest bidder shall be considered as L1.
IV. The BG/EMD submitted by the Firm with tender should be returned after obtaining confirmation
from GUVNL and its other subsidiary Companies that there are no outstanding dues recoverable
48.4 If a Firm is put on Stop dealing / Banned for business dealing in one Company and is already executing
work and/ or Letter of Acceptance/ purchase order awarded to them by another Company, then the firm
should be allowed to complete such awarded work / supply.
48.5 The amount of EMD/SD/ any payment against supply withheld at the instance of GUVNL or any of its
subsidiary Companies shall be appropriated against the dues recoverable from the firm by GUVNL or any
of its subsidiary Companies. EMD/ SD/ PG in the form of bank Guarantee shall be en cashed and
48.6 The Stop dealing/ Banned for business dealing shall be Firm- specific and when a Firm is put on Stop
dealing/ Banned for business dealing, all the manufacturing works of the Firm shall be on Stop dealing/
Banned for business dealing for GUVNL and its Subsidiary Companies & for all Services of the Firm.
48.7 If the Firm placed on Stop Dealing/ Banned for business dealing is a Proprietary Concern, then all the
Concerns of the same Proprietor shall also be considered to be on Stop Dealing/ Banned for business
48.8 The Board of Directors of the concerned Company may however, if he considers it to be in the interest
of the Company, remove the ban in respect of any specific Service from any Contractor for that Company
48.9 Every bidder should, at the time of submission of bid, give a declaration as per Annexure VIII attached
with this Tender, that bidder and/or proprietor/ partner/ director of the firm has not been placed on Stop
dealing / Banned for business dealing / blacklisting by GUVNL and it’s any Subsidiary Companies.
The SOR rates shown under schedule- B are excluding of GST in case of erection of HT/ LT line & T/C work,
whereas in case of underground cable work, the SOR rates under schedule-B are inclusive of GST.
The terms and conditions stated above are carefully read by me/us and are acceptable to me/us.
1. The quantity given in Schedule ‘B’ is approximate. There will be increase or decrease in the quantities. Please
note that within the estimated cost quantities of item may very as per the requirement of the Board. In such
event, payment will be made on the basis of actual quantities executed.
2. Successful bidder shall submit monthly report for work executed by them giving details of Name of s/s, Name
of feeder, type of kit used ,date of providing kit, sub order no. etc. utilized by them to The E.E (RURAL),
DGVCL, RURAL Dn, Ankleshwar.
3. Proprietor/Partner /Director of bidder/firms not stop deal/Show cause/banned for business dealing and /or
black listed by GUVNL and / or their any subsidiary company Viz. MGVCL/PGVCL/UGVCL/GSECL/
GETCO/DGVCL. If found during Tender procedure DGVCL has rights to disqualify/reject at any stage of tender.
(50) If in any Bidder company/firm, the interest (i.e. Shareholding in company and share in partnership firm) of
any employee of the tendering company or his/her relative as defined in section 2(77) of the company’s
Act.2013 is 10% or more, the tendering company will not deal with such company/firm at all.
(51) You have to provide the test certificate for the supply items, sample has to be checked by engineer in charge.
(52) Relationship with employee: If contractor/firm, the interest of any employee of the DGVCL or his/her relatives as defined
in section 2(77) of the company’s act 2013 is 10% or more, the DGVCL will not deal with such contractor/firm
(53) All staff of contractor/firm working on line must be equipped with all required necessary safety tools and tackles like safety
shoes, helmet, safety belt, hand gloves etc.
(54) As per circular no: DGVCL/O&M/EE. TECH.2/DE-5/GEO URJA/22/22308 DTD: 31.12.2022 for Geo inventory mapping which
must be submitted by concern SDO at the time of submission of contractor’s bill.
(55) Before initiating any type of digging activity, prior intimation through “CALL BEFORE U DIG” MOBILE APPLICATION IS
(56) Contractor has to provide barricades with the logo of DGVCL “MAN IS WORKING” IN ENGLISH
AND GUJARATI language where contractor’s gangs are working for a safety point of view and to
identify the work execution going on, by the general public and other government agencies.
(57) Before initiating any type of digging activity, prior intimation through “CALL BEFORE U DIG”
MOBILE APPLICATION IS MANDATORY
(58) As per circular no: DGVCL/O&M/EE. TECH.2/DE-5/GEO URJA/22/22308 DTD: 31.12.2022 for
Geo inventory mapping which must be submitted by concern SDO at the time of submission
of contractor’s bill.
(59) Work contractor should complete geo-mapping of new infrastructure erected by him before
submission of respective bill.
(60) ARBITRATION:-
(1) Amicable Settlement:-All disputes, differences controversy or claim between the parties arising
out of or in relating to this contract with reference to the construction interpretation breach,
termination or validity thereof(hereinafter referred as “the Dispute”) shall upon the written
representatives of the disputing parties for resolution. The authorized representatives shall
promptly meet and attempt to negotiate in good faith a resolution of the Dispute within thirty
days of the service of the request.
(2) Arbitration:- If the parties fail to amicably resolve the disputes or differences controversy
or claims as indicated herewith in sub clause(1) of clause 9,arising under or in connection with
the present works contracts, whether pertaining to works contracts alone or works and
procurement both, the same shall be referred to arbitration under the Gujarat Public works
Contracts Disputes Arbitration Tribunal Act,1992.”
Executive Engineer (RURAL)
Ankleshwar Rural Division
Signature of contractor
SPECIAL TERMS AND CONDITIONS OF CONTRACT
1. For any damage to the equipment or persons working for the job, DGVCL will not
be responsible for the same.
2. The contractor should fulfill the conditions of contract of Labor Regulations and
Abolition Act 1970 and will have to furnish records failing which payment will not be made. The
contractor should specify License No. Contractor should possess the GST& should also intimate PF
Code No. & contractor are also bound to fulfill all the conditions as per the provision of EPF and MP
Act 1952 & Schemes framed the render otherwise Tender will be liable for termination.
3. Any liabilities arising in connection with Sales Tax will be of contractor.
4. The rates are asked for only on percentage basis against estimated amount i.e. item wise rates
stated in the Schedule ‘B’ The tender offer must be specify the percentage either above or below
to the estimated amount. And it should be clearly specified both in figures and words.
5. No conditional offer will be accepted in any circumstances.
6. The contractor should sign all the tender documents wherever necessary, failing which the offer is
liable to be ignored.
7. In case of any mistake, in writing the percentage offer between the figures and words, the DGVCL
will consider the most beneficial at its discretion and that will be binding to the Tenderer.
8. In case of any mistake, in writing the derived net amount of the offer, the actual calculation as per
percentage offer of the tenderer will be taken in to consideration of comparison and shall be binding
to the contractor.
9. The rates so accepted will be applicable, during the contract and no any price variation will be
considered during contract period.
10.The percentage rate offer must be offered in our tender documents only. These should not be
any overwriting. If any correction must be made initial with signature of the tenderer.
11. The tenderer should not change the estimated rate.
12. The Tender documents where signed must be affixed with Rubber-stamp of
Firm/Company/Individual with address.
13. In case of any ambiguity, discrepancy or dispute the decision of Executive Engineer(RURAL)
Ankleshwar Rural Division DGVCL will be final and shall be binding to the tenderer.
14. Against the approved rate contract engineer-in-charge will issue detailed work order T.S.wise
during the validity period of contract. The actual quantity may vary according to the quantum of
work to be executed during contract period.
15. Wherever, there is an excess work carried out by the contractor, beyond the Technically sanctioned
amount against the work order, approval for the excess quantity of work done should be obtained
from the competent authority as per DGVCL’s rules.
16. The work will be carried out as per program laid by the DGVCL and the DGVCL and the contractor
should thoroughly supervise the execution of work throughout by being present on the work site
17. No tools will be supplied by the DGVCL and the contractor should make his own
Arrangement to get adequate quantities of all tools in order to complete the job within the
prescribed period.
18. The contractor shall be responsible for breakage, loss or theft of material during transit or erection,
issued to him from stores, till the time the work is handed over and taken over by the DGVCL.
19. Starting of works and completion period: The erection work should be commenced within
seven days from the date specified in the offer to commence work, issued by the Deputy Engineer
(RURAL) and should be completed within the prescribed period for each work.
20. Bills be prepared once month looking to the progress of the work and payment will be made as
A] Running bill may be paid on the progress of work carried out and measurement recorded up
to 80% on submission of material account.
B] Final bills for contracts will be paid after completion of works &recording measurements
submitting material Account. If contractor proceed further and finalize the bill.
21. No material of the DGVCL should be left on the line without supervision.
22. For stringing of aluminum or ACSR conductor, aluminum or wooden pulley must be used for
supporting contact on poles.
23. All conductors, earth wire & stay sets must be tight.
24. All the poles must be in plumb.
25. Fabrication fittings on poles must be light and painted.
26. Stay Rod pit must be as per instruction.
27. Generally 30-40mtr. Span should be kept on HT/LT line.
28. All road crossings must be provided with guarding arrangement and minimum 22 feet clearance
must be kept between conductor and road level.
29.Contractor must get the requisition, three days well in advance before they require the material
on site, from Engineer-in-charge.
30.The payment to the contractor through RA bill be to the extent of 100% of the value of the work
done provided the contractor furnishes the material account in respect of the previous RA bill
before the next RA bill is paid. If this is not complied with by the contractor the payment through
RA bill shall be made only to extent of 80% of the total value of the work done, the amount so
withheld will be released on furnishing by the contractor the material account of the relative RA
31.The contractor shall on completion of work prepare RA bill and render the final detailed material
account of the material received by him from the DGVCL’s store within one month from the date
of completion of work. If however, the contractor does not render the material account, a Regd.
A.D. Notice will be issued to the contractor to render the material account, within 10 days from
the date of Notice, failing which the material account will be finalized and recoveries made as per
the DGVCL’s account which shall have to be accepted by the contractor and disputes if any raised
shall not be entertained.
32.The contractor is bound to complete the work within the specified period from each, work given by
the Engineer-in-charge.
33. Priority of works would be decided by the engineer in charge and the contractor shall carry out
the work within stipulated time for order issued by Engineer in charge.
34.The contractor must have adequate resources and gang of unskilled & skilled personnel to
undertake the work at the different places.
35.For rate contracts, the contractor will be given separate order for each work on the basis of the
rate contract order. The date of commencement and date of completion of work will be stipulated
in order which the contractor has to agree otherwise the penalty will be levy able for late
completion of work as per DGVCL’s standard conditions.
36. The contractor will be governed by the following clauses and to be signed by him:
a) Should this tender be accepted I/We hereby agree to fulfill all terms and provisions of the Tender
& Contract for works as applicable and in default thereof to forfeit and pay to the DGVCL the
sum/s of money as may become due.
b) The full value of the ‘Earnest Money Deposit’ paid herewith shall be absolutely forfeited to the
DGVCL should I/WE not deposit the full amount of specified Security Deposit in time.
c) The competent authority will delete any item in Schedule ‘B’ in the Tender.
d) The contractor will have, to produce a solvency certificate before commencement of work.
e) For any accident either fatal or non-fatal to the workers due to non-observance of safety measures
& line clearance DGVCL shall not be responsible.
f) Any loss sustained due to this will have to be borne by the contractor.
g)Contractor has to provide separate PF Code No. from the RPFO for their employee/s it is to be
ensured that any contractor who do not possess separate PF code should not considered for
acceptance of tender.
h) Contractor shall pay minimum wages to each laborer as per the minimum wages act 1948and rules
therein, as applicable from time to time in pursuance to the Govt. Notification and compensation
Act applicable Workmen Compensation Act.
i) Contractor will have to carry out works in any area of Ankleshwar Rural Division if need be as per
the instruction of Executive Engineer (RURAL) Ankleshwar Rural Division.
j) Executive Engineer (RURAL) Ankleshwar Rural Division can discontinue contract at any time without
assigning any reasons/can take, further actions as per DGVCL’s rules against the contractor.
k) Rate to be deducted for not carrying out the work (As per SOR Rate)
L) Lighting arrestor must be installed otherwise bill will not be recorded.
M) All empty conductor drums will have to be returned by the contractor at concern Divisional Stores, failing which
Rs.100/- per drum will be recovered.
N) GST at the applicable rate will be added to rates / amounts mentioned above.
O) Before initiating any type of digging activity, prior intimation through “CALL BEFORE U DIG” MOBILE APPLICATION IS
(P) Contractor has to provide barricades with the logo of DGVCL “MAN IS WORKING” IN ENGLISH AND
GUJARATI language where contractor’s gangs are working for a safety point of view and to identify the
work execution going on, by the general public and other government agencies.
(Q) As per circular no: DGVCL/O&M/EE. TECH.2/DE-5/GEO URJA/22/22308 DTD: 31.12.2022 for Geo inventory mapping which
must be submitted by concern SDO at the time of submission of contractor’s bill.
(R) Work contractor should complete geo-mapping of new infrastructure erected by him before
submission of respective bill.
(S) To ensure quality, PSC poles must be erected using a pole erection device/machine, except in hard rock areas
where alternative methods may be permitted.
The above conditions are applicable to this tender in addition to the specifications mentioned in the
Tender and Contract Booklet of DGVCL.
Executive Engineer (RURAL)
Ankleshwar Rural Division
Signature of contractor
Seal with Address of the Firm[Rubber Stamp]
Special GST provision
Tender fee (Non-refundable) plus GST as applicable notified in the tender notice should invariably be paid
by online only. Indian Postal Orders (IOP’s) & Cheques are not acceptable. The Tender Fees is Non-
Refundable under normal circumstances. However, if purchaser company decides to scrap/ cancel the
tender, by one or another reason, in which bidders are not responsible for cancellation/ scrap of tender,
in such case tender fee may be refunded to bidder(s), at sole discretion of the purchaser company.
2) PRICE EVALUATION:
No price preference shall be given on any account. All Tenders shall be evaluated on firm price End Cost
(with GST and Cess as applicable) basis unless otherwise mentioned in the Tender documents.
If the Tender is invited with Total Owning Cost (TOC) clause, the evaluation shall be done accordingly.
For the same, the Bidders have to give the detailed breakup of the End Cost.
Prices quoted should be FIRM and or F.O.R. Destination basis (i.e. any of the stores of COMPANY in
Gujarat. However, the Tenderer should indicate in the Schedule-B (i.e. Price Bid), the break-up of Total
Unit F.O.R. Destination Prices and Total Unit End Cost with GST and Cess as applicable stating the Unit
Ex-works price, freight, packing & forwarding charges, insurance charges, GST and Cess as applicable
separately in price bid, which is a must.
If the Supplier/Contractor has opted for the composition scheme of GST, the same must be clearly
specified with valid Declaration & self-certified Certificate from Department. In the event of
withdrawal/cessation of the Supplier from composition scheme during the tenure of the contract, the rate
(i.e. price) mentioned in the price bid shall be final and any additional GST will have to be borne by the
tenderer himself. In no case additional amount towards GST or otherwise will be paid / reimbursed to
supplier/contractor. Further statutory variation clause will not be applicable in case of Supplier/Contractor
has opted for Composition Scheme under GST.
Also, please mention separate applicable HSN / SAC Code and rate of GST and Cess as applicable for each
item of Goods/Service. If not specifically mentioned then COMPANY will have the option to take the prices
as exclusive of taxes and duties at maximum higher slab rates for the evaluation of the tenders.
The offered prices to be indicated in online mode of tender in the format given (i.e. Schedule-B). The
price bid submitted in physical mode shall not be considered.
The Tenderer should invariably indicate the total unit end cost price considering all their costs / calculations
in the Price bid itself for each item and all sub-items if any. This is a must. Cost components hidden /
furnished elsewhere will not be considered and will be ignored out rightly.
Every bidder shall inform their GSTIN No. of the registered place(s) wherefrom the bidder intends to
supply the goods / services, meaning there by the bidder has to supply the goods / services from the
relevant declared / registered place of supply only.
4) Goods and Service Tax (GST) :
The F.O.R. Destination prices are excluding GST and Cess as applicable which will be paid extra on a given
taxable goods and/or services within the original contractual delivery period. The amount of GST and
Cess as applicable should clearly be indicated separately. (FST/Cess means all applicable Tax/Cess under
GST Laws. GST Laws means IGST Act, GST (Compensation to the State for Loss of Revenue) Act, CGST
Act, UTGST Act and SGSCT Act, 2017 and all related ancillary legislations).
You shall have to submit a C.A Certificate & dully authorized signatory of successful bidder, certifying that
you have not claimed Refund of any allocable GST and Cess, charged to DGVCL or shall not claim any
such Refund, on a future date, from the concerned Authorities and if, any Refund , in respect of such FST/
and Cess, is claimed by you, it will be immediately passed on to the COMPANY, without / company making
any specific Claim, for the same, either from the Department or from you.
If the Supplier/Contractor has opted for the Composition Scheme of GST, the same must be clearly
specified with valid Declaration & Certificate from department. In the event of withdrawal/cessation of
the Supplier from Composition Scheme during the tenure of the contract, the rate mentioned in the price
bid shall be final and any additional GST will have to be borne by the tenderer. In no case additional
amount towards tax or otherwise will be paid / reimbursed to supplier/contractor. Further Statutory
Variation clause will not be applicable in case of Supplier / Contractor has opted for Composition Scheme
Supplier/Contractor should charge GST in Invoice at the rate as agreed to / mentioned in acceptance of
tender only and any deviation in the same shall not be accepted. Further, any additional liability of GST
(later on due to wrong mentioning of GST rate, mis-interpretation of HSN/SAC Code, etc.) over and above
as charged in the invoice shall be borne by the Supplier/ Contractor. However, any refund received by
the supplier / contractor on account of GST charged from the company; such refund shall have to be
passed on to the company, along with interest if any. Such refund along with interest needs to be passed
on suo-moto by the supplier / contractor.
Further, the company has a right to recover the amount of GST along with penal interest at the rate of
15% per annum if GST charged is not paid / short paid to the government of fail to upload the details or
uploads inaccurate particulars on GSTIN portal by the Supplier / Contractor within the stipulated time limit.
In case, Govt. revised the rate of GST rate / Code during the tenure of the contract, the provision of
GUVNL’s statutory variation clause shall apply.
INPUT TAX CREDIT BENEFIT
In the event of any statutory increase in the rate of Input Tax Credit and / or due to inclusion of any other
additional item of their inputs / input services under the ambit of the Input Tax Credit provisions under
the GST Act, subsequent to the date of submission of the offer, the same should be passed on to
COMNPANY and you should inform such changes to COMPANY from time to time.
5) STATUTORY VARIATION:
Any statutory increase or decrease in the taxes and duties including GST and Cess as applicable or in the
event of introduction of new tax/cess or cessation of existing tax/cess subsequent to suppliers offer if it
takes place within the original contractual delivery date will be to COMPANY’s account subject to the claim
being supported by documentary evidence. However, if any decrease takes place after the contractual
delivery date, the advantage will have to be passed on to company.
Statutory Variation clause shall not be applicable in case of Supplier / Contractor has opted for Composition
Scheme under GST.
6) WORK & SAFETY REGULATIONS
I. the Contractor shall ensure proper safety of all the workmen, materials, plant and equipment
belonging to him or to DGVCL or to others, working at the Site. The Contractor shall also be
responsible for provision of all safety notices and safety equipment required both by the relevant
legislations and the Engineer, as he may deem necessary.
II. All equipment used in construction and erection by Contractor shall meet Indian/International
Standards and where such standards do not exist, the Contractor shall ensure these to be absolutely
safe. All equipment shall be strictly operated and maintained by the Contractor in accordance with
manufacturer’s Operation Manual and safety instructions and as per Guidelines/rules of DGVCL in this
III. Periodical examinations and all tests for all lifting/hoisting equipment & tackles shall be
carried-out in accordance with the relevant provisions of Factories Act 1948, Indian Electricity Act
1910 and associated Laws/Rules in force from time to time. A r e g i s t e r o f s u c h examinations
and tests shall be properly maintained by the Contractor and will be promptly produced as and when
desired by the Engineer or by the person authorized by him.
IV. The Contractor shall provide suitable safety equipment of prescribed standard to all
employees and workmen according to the need.
V. The Contractor shall provide safe working conditions to all workmen and employees at the Site
including safe means of access, railings, stairs, ladders, scaffoldings etc. The scaffoldings
shall be erected under the control and supervision of an experienced and competent person.
For erection, good and standard quality of material only shall be used by the Contractor.
VI. The Contractor shall not interfere or disturb electric fuses, wiring and other electrical
equipment belonging to the Owner or other Contractors under any circumstances,
whatsoever, unless expressly permitted in writing by DGVCL to handle such fuses, wiring or electrical
VII. Before the Contractor connects any electrical appliances to any plug or socket belonging to the
other Contractor or Owner, he shall:
a. Satisfy the Engineer that the appliance is in good working condition;
b. Inform the Engineer of the maximum current rating, voltage and phases of the
c. Obtain permission of the Engineer detailing the sockets to which the appliances may be
VIII. The Engineer will not grant permission to connect until he is satisfied that;
a. The appliance is in good condition and is fitted with suitable plug;
b. The appliance is fitted with a suitable cable having two earth conductors, one of which shall
be an earthed metal sheath surrounding the cores.
IX. No electric cable in use by the Contractor/Owner will be disturbed without prior permission. No
weight of any description will be imposed on any cable and no ladder or similar equipment will rest
against or attached to it.
X. No repair work shall be carried out on any live equipment. The equipment must be declared safe
by the Engineer and a permit to work shall be issued by the Engineer before any repair work is
carried out by the Contractor. While working on electric lines/equipment, whether live or dead,
suitable type and sufficient quantity of tools will have to he provided by the Contractor to
electricians/workmen/officers.
XI. In case any accident occurs during the construction/ erection or other associated activities
undertaken by the Contractor thereby causing any minor or major or fatal injury to his
employees due to any reason, whatsoever, it shall be the responsibility of the Contractor to promptly
inform the same to the Engineer in prescribed form and also to all the authorities envisaged under
the applicable laws.
XII. the Engineer shall have the right at his sole discretion to stop the work, if in his opinion the work
is being carried out in such a way that it may cause accidents and endanger the safety of the
persons and/or property, and/or equipment. In such cases, the Contractor shall be informed in
writing about the nature of hazards and possible injury/accident and he shall comply to remove
shortcomings promptly. The Contractor after stopping the specific work can, if felt necessary,
appeal against the order of stoppage of work to the Engineer within 3 days of such stoppage of
work and decision of the Engineer in this respect shall be conclusive and binding on the
XIII. The Contractor shall not be entitled for any damages/compensation for stoppage of work due to
safety reasons and the period of such stoppage of work will not be taken as an extension of
time for completion of work and will not be the ground for waiver of levy of liquidated damages.
XIV. It is mandatory for the Contractor to observe during the execution of the works, requirements of
Safety Rules which would generally include but not limited to following:
a) Each employee shall be provided with initial indoctrination regarding safety by the
Contractor, so as to enable him to conduct his work in a safe manner.
b) No employee shall be given a new assignment of work unfamiliar to him without proper
introduction as to the hazards incident thereto, both to himself and his fellow employees.
c) Employees must not leave naked fires unattended. Smoking shall not be permitted around fire
prone areas and adequate firefighting equipment shall be provided at crucial location.
d) There shall be a suitable arrangement at every work site for rendering prompt and sufficient first
aid to the injured.
j) Requirements of ventilation in underwater working to licensed and experienced divers, use of gum
boots for working in slushy or in inundated conditions are essential requirements to be fulfilled.
XV The Contractor shall follow and comply with all DGVCL Safety Rules, relevant provisions of applicable
laws pertaining to the safety of workmen, employees, plant and equipment as may be prescribed
from time to time without any demur, protest or contest or reservations. In case of any discrepancy
between statutory requirement and DGVCL Safety Rules referred above, the latter shall be binding
on the Contractor unless the statutory provisions are more stringent.
a. Fatal injury or accident-Rs. 1, 00,000/- : These are causing death per person applicable for death/
b. Major injuries or accident causing Rs. 20,000/- injury to 25% or more permanent disablement per person:
any person, to Workmen or employees: whosoever.
Permanent disablement shall have same meaning as indicated in Workmen’s Compensation Act. The
compensation mentioned above shall be in addition to the compensation payable to the
workmen/employees under the relevant provisions of the Workmen’s Compensation Act and rules
framed there under or any other applicable laws as applicable from time to time. In case the Owner
is made to pay such compensation then the Contractor is liable to reimburse the Owner such amount
in addition to the compensation indicated above.
QUALIFYING CRITERIA
4.1 Part-A: Technical:
4.1.1 The bidder should possess Electrical Contractor license issued by the Office of Govt. of Gujarat. The
contractors outside of Gujarat State must have to take approval from Government of Gujarat for Electrical
Contractor license.
4.1.2 Work experiences of the bidder shall be considered only if the works have been executed under
Public electrical utility of Central or State Govt. in India / Government Sector / Power Utility (Government
or Private) / Power sector PSUs & Power Sector CPSUs.
4.1.3 For qualifying the experience criteria; bidder shall submit Copy of Work Order (showing the
statement of quantity & amount in Rs.), work completion certificate (showing amount of actual work
completed) for the work completed before one year and said system / project is performing satisfactorily
as on submission of bid, from respective authority / client.
4.1.4 Bidder has to submit the copy of complete type test reports / certificates of offered make of major
supply items like HDPE Pipe, Indoor & Outdoor Termination Kits, Straight Joints (Any make approved by
GUVNL & Its Subsidiaries Company) as required in under-ground cable laying work. The Certificates /
reports should not be older than 7 (Seven) years.
4.1.5 Bidder has to provide the authorization letters from the manufacturer / authorized dealer of offered
make material. Guarantee also required from bidder as well as OEM / authorized dealer.
4.1.6 Experience as a sub-contractor shall not be considered for technical evaluation.
4.1.7 The above stated criteria are minimum and the Ankleshwar Rural Division reserves the right to
request for any additional requirement and also reserves the right to reject the bid of any bidder, if in the
opinion of the Ankleshwar Rural Division, the qualification criteria are not fulfilled.
4.1.8 Bidder must have Skilled Supervisor having Supervisor License & Skilled Technical staff & labour for
execution of work.
4.1.9 Bidder must own cable fault locator van / kit to identify cable fault location & HDD Machine for push
through work. If not, as an alternative, bidder should have out-sourced contract service facility with such
agency. For the same bidder must have to submit MOU (Memorandum of Understanding) with such
agency on Rs. 300/- non judicial stamp paper duly signed by respective authorized representative and
notarized. The registration and purchase details of equipment along with MOU shall be submitted with
the bidding document.
4.2.2 Minimum Average Annual Turnover (MAAT) for last three years, ending 31 st March of the previous
financial year, of the bidder should be at least 30% of the estimated cost of the tender. In this regard,
separate notarized certificate from CA must be submitted.
4.2.3 Net-worth of the last Financial Year shall be positive.
Note: Turnover & Net-worth shall be certified by CA on his letter head and duly attested. Turnover for
preceding year shall be considered subject to submission of provisional / audited certificate from CA by
4.2.4 Separate EPF Code No. allotted by RPFC & last six months of current year EPF Challan paid copy is
4.2.5 Details of Partners/Directors of the Firm/Company.
Partnership deed in case of Partnership Firm
Memorandum of Association & Article of Association in case of Company
4.2.6 GSTN Certificate & Permanent Account Number (PAN Card).
4.2.7 Group Insurance: A copy of the valid insurance policy of the insured labourer’s under W.C.
Act. The contractor shall renew the same till completion of the contract
7) Below mentioned documents also must be uploaded scanned documents
(notarized/self-attested) in pdf form remain legible and should not be password
A. Tender notice, Tender copy and Schedule-B.(with sign on each page)
B. Tender fee & EMD payment receipts.
C. PF registration.
D. Xerox copy of PAN card.
E. Partnership deed (In case of Partnership firm)
F. Electrical Contractor license.
G. Register copy of GST No.
H. Average Annual financial turnover during the last 3 years ending 31st March of the
previous financial year i.e. FY 2021-22, FY 2022-23 & FY 2023-24 should be at least
30% of the tender value.
I. Experience of having successfully completed similar works during last 7 years ending
last day of month previous to the one in which applications are invited (Work completion
certificate issued by work order issuing authority must be provided) should be other of
a. Three similar completed works costing not less than the amount equal to
40% of the tender value.
b. Two similar completed works costing not less than the amount equal to
50% of the tender value.
c. One similar completed works costing not less than the amount equal to
80% of the tender value.
- Definition of similar; Erection & Maintenance of HT, LT & TC AND U/G Cable work.
J. Copy of Solvency Certificate of 20% amount of tender value
K. Undertaking in regard to Stop Deal / Black List Thereof As per ANNEXURE-A (On Letter
head by properly filling all the data)
L. Insurance Copy
M. Labor License
All above documents (A to L) are mandatory. Bidder have to attach properly visible
documents in pdf format. Attach tender required documents only as per above list.
Ex. Engr. (RURAL)
In connection with the above subject and reference I/ We confirm the following:
1. I / We, the under signed have read and examined the Tender Specifications in tender mentioned
under reference along with the Commercial terms and conditions.
2. I / We, declare that our Technical Bid is strictly in line with the Tender specifications (except the
deviations shown in Annexure of Technical Deviations as per clause no.22 of this tender
3. I / We also agree that additional conditions that I/We (proprietor/Partner /Director) of bidder/firms
not stop deal/Show cause/banned for business dealing and /or black listed by GUVNL and / or their
any subsidiary company Viz. MGVCL/PGVCL/UGVCL/GSECL/ GETCO/DGVCL. If found during
procedure DGVCL has rights to disqualify at any stage of tender.
4. Further, I / We also agree that additional conditions / deviations, if any, found in the Commercial
terms & conditions (except reference under clause no.22 of this tender document), our offer shall
be out rightly rejected without assigning any reason thereof.
Ex. Engr. (RURAL)
Signature of Contractor Ankleshwar
Following Drawing for Earthing to be added and the same is to be used wherever earthing
11/22 KV Cable Trench for Single Cable laying drawing
11/22 KV Cable Trench for Double Cable laying drawing
Following Drawing of route marker to be added and the same is to be used for Route maker
Sign Board (Caution board)
D.O.D.P Bus bar arrangement drawing.
DAKSHIN GUJARAT VIJ COMPANY LTD.
RURAL DIVISION ANKLESHWAR
TERMS & CONDITION
1) DE will give the programme to the contractor under intimation to the Division Office, with the details of work
under each item with quantity feeder wise and location wise and accordingly on receipt of such intimation the
contractor shall have to start the work within 10 days, failing which the particular work shall have to be got
completed by the DE concerned through sources at the cost and risk of the contractor. The expenditure
incurred in excess in such cases, then the tendered rates shall have to be recovered from the amount due to
the contractor.
2) According to the contractor, if he feels more erecting work than actually intimated to him by the DE concerned
through sub-work order he should not carry out such work at his own accord but he should point out the same
to the DE and only if he agrees to the same and issued supplementary sub-work order, than only such work
should be carried out. For the work carried out without such sub-work order will not be paid to the contractor.
3) The contractor should prepare a detailed list of work carried out by him location wise as per sub-work order
and he should obtain the signature there on of the DE OR JE of the S/dn and the same should be presented to
the DE for preparation of bill.
4) Whenever any material is required to be replaced the contractor shall be given such material from the sub-
division office and for the same he will have to rend full account to the S.D.O. similarly any broken or scrap
material gathered from such work should be credited to sub-division office. If no such old scrap material is
available on line, he should obtain clear certificate to that effect from the DE OR JE concerned.
5) What so ever material is required to be use by the contractor as per schedule of the tender, he will have to
bring the same to the notice of the DE OR JE and the same should be utilized as per there instruction, only
when such materials are approved by them.
6) For Tools, Tackles, Hand Carts etc. the contractors shall to make their own arrangement.
7) The contractor should obtain insurance policy in respect of his lab ours towards accident risk and the Xerox
copy thereof may should be produced to the Division Office along with the contract documents executed.
8) Before starting the work on any line the contractor shall have to obtain shut down on that line through the
DE/JE concerned and regarding the shutdown obtained he should get such shut down order. If the contractor
fails to obtain such order from the DE/JE concerned, them in cases of any event of accident or otherwise, the
contractor will be only responsible.
9) Carryout the work as per R.E. norms.
10) The painting works to the fabricated material is must.
11) The numbering work is must.
12) As these works are under TASP scheme and to be executed in specified time limit therefore time limit of work
shall be four months and works shall be executed in equated monthly portion with ref. to total cost of tender
failing which action shall be taken in conformation with the prevailing rules of the company.
13) You will have carry out the work any S/Dn. office under control of Ankleshwar (RURAL) Division if required
with same rates & same terms & conditions.
14) Security deposit amount will be refunded after six months from the completion of last job work.
15) Rates are inclusive of PF and work contract tax exclusive of GST whichever is applicable.
16) I/We declare that I/We am/are not black listed / stop dealing in any organization
17) DGVCL all rights reserve to black list/stop dealing if the contractor is found defaulter/non satisfactory work or
violation of conditions of contract.
18) It is mandatory for all bidders to submit their tender/s documents in forms of online (e-tendering) in
scheduled time.
19) Following documents are mandatory for online submission along with tender.
Signed copy of tender along with terms and conditions.
PF Registration
GST Registration copy
PAN card copy
Experience certificate/orders
Solvency certificate
Other related documents.
20) Submit indemnity bond and agreement as per company norms
21) If in any Bidder company/firm, the interest (i.e. Shareholding in company and share in partnership firm) of any
employee of the tendering company or his/her relative as defined in section 2(77) of the company’s Act.2013
is 10% or more, the tendering company will not deal with such company/firm at all.
22) IT IS COMPULSARY TO FILL ALL THE ANNEXURES ATTACHED IN THE TENDER DOCUMENTS. ANK RURAL
DIVISION RESERVED RIGHTS TO REJECT THE BID OF ANY BIDDER WHO HAVE PROVIDED IMPROPER OR
INCOMPLETE DETAILS.
You are fully agree to and abide by to the above terms and conditions.
Seal and Executive Engineer (RURAL)
Signature of the Contractor Ankleshwar
………………………………… (Name of work)
We commit ourselves to trust, transparency and setting ethical standards in implementation of
various works for ultimate long-term benefits for society. We also reiterate our commitment to
development to mutual respect and best practices for setting very high-quality standards in works
We abide to accomplish our work with
Integrity and trust
Ethics and courtesy
Transparency and quality.
DGVCL Commitment Contractor’s Commitment
To maintain high ethical standards Not to bring pressure/recommendation from outside
to influence decision.
To ensure transparency in transactions
To ensure to abide by the terms of agreement of contract and to
To abide by general discipline to be maintained in
consider the views of parties objectively.
To try to ensure timely payments for work done.
To be prompt and reasonable in fulfilling the terms
of agreement of contract and legal obligations.
To ensure that no improper demand is made by employees or by
anyone on their behalf. To ensure high standards are set for quality of work
or supplies at lowest possible cost.
To provide maximum possible help to all contractors/
vendors/suppliers and any other party working with us so that the
Not to use any pressure, threat, intimidation or
inducement of any kind of any of the employees.
contracted assignment is completed in time.
To be true and honest in furnishing specification and
information and make all efforts for completing the
The Executive Engineer, assignment well in time.
Ankleshwar Rural Division
Signature of Contractor
Building ethical Partnership and working Together
SECTION 3: APPENDIX
Sr. No. Appendix Details Particulars Remarks
Bank Guarantee Format for Earnest Money To be submitted with Bid
Deposit (EMD) Documents
Bank Guarantee (For Period of Execution of
2 Appendix – II To be submitted after LOA
3 Appendix – III Contract Agreement To be submitted after LOA
Bank Guarantee (For Guarantee / Warrantee To be submitted after
4 Appendix – IV
Period) completion of works
Combined Bank Guarantee (For Period of To be submitted after
Execution of works and Guarantee Period) completion of works
E. M. D. BANK GUARANTEE FORMAT
FOR TENDER NO.: COMPANY / ____________________________
(BANK GUARANTEE ON NON-JUDICIAL STAMP PAPER OF Rs.300/-)
WHEREAS M/s. ____________________________________ (name & address of the Firm) having their registered office at
_____________________________________ (address of the firms Registered Office) (hereinafter called the ‘Tenderer’) wish
work (Supply / Erection / Supply & Erection Work) (Name of the material / equipment / Work) of _________________________
(Name of the Material / Equipment / Work) for _______________ (Name of Gujarat Urja Vikas Nigam Limited / Subsidiary
Company) (hereinafter called the “Beneficiary”) and WHEREAS a Bank Guarantee for Rs._____________ (amount of Bank
Guarantee towards EMD) valid till _________ (mention here date of validity of this Guarantee, which will be Six months from
the date of submission of bid of the tender) which is required to be submitted by the Tenderer along with the Tender.
We, ____________________________ (name of the Bank and address of the Branch giving the Bank Guarantee) having our
Registered Office at ___________________________________ (address of Bank’s Registered Office) hereby give this Bank
Guarantee No. ________________ dated _________ and hereby agree unequivocally and unconditionally to pay immediately
on demand in writing from Beneficiary __________ (Name of GUVNL / Subsidiary Company) or any Officer authorized by it
in this behalf any amount not exceeding Rs. ______________ (amount of E.M.D.), (Rupees in Words ____________________
_________________ ) to the said ______ (Full Name of GUVNL / subsidiary Company) on behalf of the Tenderer.
We ___________________________ (name of the Bank) also agree that withdrawal of the Tender / Bid /EOi or part thereof
by the Tenderer within its validity or Non-submission of Performance Guarantee towards execution / supply period by the
Tenderer within 15 days from the date of issue of Letter of Acceptance by the __________ (Name of GUVNL / subsidiary
company) would constitute a default on the part of the Tenderer and that this Bank Guarantee is liable to be invoked and
encashed within its validity by the Beneficiary in case of any occurrence of a default on the part of the Tenderer and that
the encashed amount is liable to be forfeited by the Beneficiary.
This agreement shall be valid and binding on this Bank upto and inclusive of ____________________ (mention here the date
of validity of the Bank Guarantee) and shall not be terminable by notice or by Guarantor change in the constitution of the
Bank or the firm of Tenderer Or by any reason whatsoever and our liability hereunder shall not be impaired or discharged by
any extension of time or variations or alternations made, given, conceded with or without our knowledge or consent by or
between the Tenderer and the ________________ (Name of GUVNL / Subsidiary Company).
“Notwithstanding anything contrary contained in any law for the time being in force or banking practice, this Guarantee shall not be assignable, transferable by the beneficiary
(i.e. GUVNL or Subsidiaries). Notice or invocation by any person such as assignee, transferee or agent of beneficiary shall not be entertained by the Bank. Any invocation of the
Guarantee can be made only by the beneficiary directly.”
NOTWITHSTANDING anything contained hereinbefore, our liability under this guarantee is restricted to Rs. __________ (Amt.
of E.M.D.) (Rupees ____________________________________) (in words). Our Guarantee shall remain in force till _________
(Date of validity of the Bank Guarantee). Unless demands or claims under this Bank Guarantee are made to us in writing on
or before _______ (Date of validity of the Bank Guarantee), all rights of Beneficiary under this Bank Guarantee shall be
forfeited and we shall be released and discharged from all liabilities there under:
Signature of the Bank’s
Please Mention here Complete Postal Address of the
Authorised Signatory with
Bank with Branch Code, Telephone and Fax Nos.
Official Round Seal.
NAME OF DESIGNATED BANKS:
1. All Nationalized Banks including Public Sector Banks IDBI Bank Ltd.
2. Private Sector Banks authorized by RBI to undertake the state Government business, which are (i) Axis Bank (ii) ICICI
Bank (iii) HDFC Bank
Note: The Banks shall be the Banks recognized / notified by the Finance Department, Government of Gujarat (GoG) from time
ON STAMP PAPER OF RS.300/-
FORM OF BANKER’S UNDERTAKING
[For Performance Guarantee (PBG) towards execution/ supply Period as per Commercial Terms and
Conditions of Tender]
We, (Name of the Bank and Address of the Branch giving the Bank Guarantee) having our registered office at
(Address of Bank’s registered office) hereby give this Bank Guarantee No. dated
and hereby agree Unequivocally and Unconditionally to pay immediately on demand in writing from the beneficiary
Company (Name of Gujarat Urja Vikas Nigam Ltd./ subsidiary Company) or any officer authorized by it in this
behalf any amount up to and not exceeding Rs. (Amount of Performance Guarantee towards execution/ supply period),
(Rupees (in words)) to the said
(GUVNL/ subsidiary Company) on behalf of M/s. who have entered into a contract for the supply/works specified
LOA No. dated .
This agreement shall be valid and binding on this Bank up to and inclusive of
(Date of validity of the Bank Guarantee) and shall not be terminable by notice or by change in the constitution of the
Bank or the firm of Contractors / Suppliers or by any other reasons whatsoever and our liability hereunder shall not be impaired
or discharged by any extension of time or variations or alterations made, given conceded or agreed, with or without our knowledge
or consent, by or between parties to the said within written contract.
Notwithstanding anything contrary contained in any law for the time being in force or banking practice, this Guarantee shall not
be assignable, transferable by the Beneficiary (i.e. GUVNL or Subsidiaries). Notice or invocation by any person such as assignee,
transferee or agent of beneficiary shall not be entertained by the Bank. Any invocation of the Guarantee can be made only by the
beneficiary directly.
NOTWITHSTANDING anything contained herein before, our liability under this guarantee is restricted to Rs. (Rupees
only). Our guarantee shall remain in force until (Date of validity of the Bank Guarantee). Unless
demands or claims under this Bank Guarantee are made to us in writing on or before (Date of validity of the Bank
Guarantee), all rights of Beneficiary under this Bank Guarantee shall be forfeited and we shall be released and discharged from
all liabilities there under:
Please Mention here Complete Postal Address of the Signature of the Bank’s Authorised Signatory
Bank with Branch Code, Telephone and Fax Nos.
with Official Round Seal.
NAME OF DESIGNATED BANKS:
1. All Nationalized Banks including Public Sector Bank IDBI Bank Ltd.
2. Private Sector Banks authorized by RBI to undertake the state Government business, which are (i) Axis Bank (ii) ICICI
Bank (iii) HDFC Bank
Note: The banks shall be the Banks recognized / notified by the Finance Department, Government of Gujarat (GoG) from time to
THIS AGREEMENT made on this ____ day of ______ Two Thousand Eighteen.
M/s.___________________________________________________, having Registered Office at
_____________________ Authorized Person of the ONE PART.
DAKSHIN Gujarat Vij Company Ltd, having Registered Office at Ankleshwar Rural Division,OPP.ONGC Workshop,Ankleshwar
and represented by __________________________________________________ of the OTHER PART.
WHEREAS, the Supplier willingly submitted bids for the Tender No ____________________________ of the Purchaser company
_____________________________________________________ as specified and as per delivery instructions provided in the
Acceptance of Tender (AT) / Letter of Acceptance (LOA) issued vide No
Company at the accepted respective prices or rates mentioned against the said items / materials.
AND WHEREAS THE PURCHASER Company has accepted the tender of the Supplier for the supply for the total sum of Rs.
upon the terms and subject to the conditions herein mentioned in the agreement.
AND WHEREAS, a list is made out in the “SCHEDULE” hereunder written and all of which said documents of the Schedule are
deemed to form part of this agreement and included in the expression “the Supply” wherever herein used, upon the terms and
subject to the conditions hereinafter mentioned.
NOW THIS AGREEMENT WITNESSES AS UNDER AND IT IS HEREBY AGREED AND DECLARED THAT:-
I) The Supplier has accepted the Terms and Conditions set out in the Tender Notice No.
______________________________________________ as well as in the form of Acceptance of Tender (AT) / Letter of
Acceptance (LOA) No. ________________________________________ Dtd. ____________________ which will hold
good & valid during the period of this Agreement.
II) The supplier shall do and perform for all supplies and things in this agreement mentioned and described or which are implied
therein or there from respectively or are reasonably necessary for the in-time and in manner supplies as mentioned and
subject to the general / commercial terms & conditions and stipulations contained in this agreement.
III) In consideration of the due provision, executions, completion of the Supply, as agreed to by the Supplier as aforesaid, the
Purchaser company hereby agrees to pay all the sums of money as and when they become due and payable to the supplier
under the provisions of the agreement and such payment to be made at such times and in such manner as provided in the
IV) In respect of the said Tender as per the terms & conditions of this Agreement, the Supplier has deposited amount in Cash
or DD or has provided valid Bank Guarantee of Rs ____________(
Company towards performance guarantee of execution period i.e. for security deposit of the supply material / items.
V) Upon breach by the Supplier of any of the conditions of this Agreement, the Purchaser Company may give a notice in writing
to rescind, determine and put to an end to the A/T without prejudice to the right of the Purchaser company to claim damages
for antecedent breaches thereof on the part of the Supplier and also to claim reasonable compensation / risk & cost purchase
for the loss occasioned by the Purchaser Company due to failure of the Supplier to fulfill the Order as certified in writing by
the Purchaser for which Certificate shall be conclusive evidence of the amount of such compensation payable by the Supplier
to the Purchaser.
VI) The Purchaser Company shall not be bound to take the whole or any part of the ordered quantity herein or therein mentioned
in the LOA / AT and may cancel the contract at any time after giving TWO MONTH’S NOTICE IN WRITING without
compensating the Supplier.
VII) This Agreement shall remain in force till the expiry of satisfactory performance of the Supply during Guarantee / Warranty
period including for the quantity mentioned in the repeat order, if any as per the terms & conditions of the LOA / AT.
VIII) Any Notice in connection with the Supply including the Notice for termination may be given by the Purchaser or any
Authorized Officer for the said purpose as per the Commercial Terms & Conditions of the LOA / AT.
IX) If subject to the circumstances beyond control i.e. Force Majeure conditions, the Supplier fails to deliver the materials, the
same shall be governed as per the Tender Documents.
X) The agreed value, extent of supply, delivery dates, specifications, and other relevant matters may be altered by mutual
agreement as per the policy of the purchaser Company and if so altered shall not be deemed or construed to mean or apply
to affect or alter other general / commercial terms & conditions of the agreement and the agreement so altered or revised
shall be and shall always be deemed to have been adhered subject to and without prejudice to said stipulation.
XI) The following is the Schedule forming part of this agreement as provided herein above:
List of documents:
2. Tender technical specification and GTP.
3. Tender’s terms and conditions.
In witness whereof the parties here to have set their hands and seals this day, month and year first above written.
1. Signed, Sealed and delivered by:
Authorized Person
In the presence of Name, Full Address & Signature:
2. Signed, Sealed and Delivered by:
For and on behalf of M/s. Dakshin Gujarat Vij Company Ltd. (Purchaser),
DGVCL, Corporate office,
In the presence of Name, Full Address & Signature:
ON STAMP PAPER OF RS.300/-
FORM OF BANKER’S UNDERTAKING
[For Performance Guarantee (PBG) towards Guarantee/ Warranty Period as per commercial terms and conditions of
We, (Name of the Bank and Address of the Branch giving the Bank Guarantee) having our registered office
at (Address of Bank’s registered office) hereby give this Bank Guarantee No. dated
and hereby agree Unequivocally and Unconditionally to pay immediately on demand in writing from the
Beneficiary Company (Name of Gujarat Urja Vikas Nigam Ltd./ subsidiary Company) or any
officer authorized by it in this behalf any amount up to not exceeding Rs. (Amount of Performance
Guarantee towards Guarantee/ Warranty period), (Rupees (in words)) to the said
(GUVNL/ subsidiary Company) on behalf of M/s.
who have entered into a contract for the supply/works specified below:
P. O. (A/T). No. dated .
This agreement shall be valid and binding on this Bank up to and inclusive of
(Date of validity of the Bank Guarantee) and shall not be terminable by notice or by change in the constitution
of the Bank or the firm of Contractors / Suppliers or by any other reasons whatsoever and our liability hereunder
shall not be impaired or discharged by any extension of time or variations or alterations made, given conceded or
agreed, with or without our knowledge or consent, by or between parties to the said within written contract.
Notwithstanding anything contrary contained in any law for the time being in force or banking practice, this
Guarantee shall not be assignable, transferable by the Beneficiary (i.e. GUVNL or Subsidiaries). Notice or invocation
by any person such as assignee, transferee or agent of beneficiary shall not be entertained by the Bank. Any
invocation of the Guarantee can be made only by the beneficiary directly.
NOTWITHSTANDING anything contained herein before, our liability under this guarantee is restricted to Rs.
(Rupees only). Our guarantee shall remain in force until (Date of validity of the
Bank Guarantee). Unless demands or claims under this Bank Guarantee are made to us in writing on or before
(Date of validity of the Bank Guarantee), all rights of the Beneficiary under this Bank Guarantee shall be forfeited
and we shall be released and discharged from all liabilities there under:
Please mention here Complete Postal Address Signature of the Bank’s Authorized
of the Bank with Branch Code, Telephone and Signatory
Fax Nos. With Official Round Seal.
NAME OF DESIGNATED BANKS:
1. All Nationalized Banks including Public Sector Banks IDBI Bank Ltd.
2. Private Sector Banks authorized by RBI to undertake the state Government business, which are (i) Axis
Bank (ii) ICICI Bank (iii) HDFC Bank
Note: The Banks shall be the Banks recognized / notified by the Finance Department, Government of Gujarat (GoG)
from time to time.
ON STAMP PAPER OF RS.300/-
FORM OF BANKER’S UNDERTAKING
[Combined Performance Guarantee (PBG) towards Execution /supply Period and Guarantee/ Warranty Period as per
commercial terms and conditions of Tender]
We, (Name of the Bank and Address of the Branch giving the Bank Guarantee) having our registered office
at (Address of Bank’s registered office) hereby give this Bank Guarantee No. dated
and hereby agree Unequivocally and Unconditionally to pay immediately on demand in writing from the
Beneficiary Company (DGVCL) or any officer authorized by it in this behalf any amount up to not
exceeding Rs. (Amount of combined Performance Guarantees towards Execution /supply Period and
Guarantee/ Warranty Period),
(Rupees (in words)) to the said (DGVCL) on behalf of M/s. who have entered into a contract for the
supply/works specified below:
L.O.A. No. dated .
This agreement shall be valid and binding on this Bank up to and inclusive of
(Date of validity of the Bank Guarantee) and shall not be terminable by notice or by change in the constitution
of the Bank or the firm of Contractors / Suppliers or by any other reasons whatsoever and our liability hereunder
shall not be impaired or discharged by any extension of time or variations or alterations made, given conceded or
agreed, with or without our knowledge or consent, by or between parties to the said within written contract.
Notwithstanding anything contrary contained in any law for the time being in force or banking practice, this
Guarantee shall not be assignable, transferable by the Beneficiary (i.e. GUVNL or Subsidiaries). Notice or invocation
by any person such as assignee, transferee or agent of beneficiary shall not be entertained by the Bank. Any
invocation of the Guarantee can be made only by the beneficiary directly.
NOTWITHSTANDING anything contained herein before, our liability under this guarantee is restricted to Rs.
(Rupees only). Our guarantee shall remain in force until (Date of validity of the
Bank Guarantee). Unless demands or claims under this Bank Guarantee are made to us in writing on or before
(Date of validity of the Bank Guarantee), all rights of the Beneficiary under this Bank Guarantee shall be forfeited
and we shall be released and discharged from all liabilities there under:
Please Mention here Complete Postal Signature of the Bank’s Authorized
Address of the Bank with Branch Code, Signatory with Official Round Seal.
Telephone and Fax Nos.
NAME OF DESIGNATED BANKS:
1. All Nationalized Banks including Public Sector Banks IDBI Bank Ltd.
2. Private Sector Banks authorized by RBI to undertake the state Government business, which are (i) Axis Bank
(ii) ICICI Bank (iii) HDFC Bank
Note: The Banks shall be the Banks recognized / notified by the Finance Department, Government of Gujarat (GoG)
from time to time.
SECTION 4: ANNEXURE
Sr. No. Annexure Details Particulars
1 Annexure – I Self-Certificate
2 Annexure – II Details of the Experience
3 Annexure – III List of Performance Certificate
4 Annexure – IV Details of Pending Orders as on Bidding Date
5 Annexure – V Self-Declaration
6 Annexure – VI Declaration regarding Conflict among bidders
7 Annexure – VII Technical & Commercial Deviation, if any
8 Annexure – VIII Undertaking in regard to Stop Deal / Black List
9 Annexure – IX Certificate A
10 Annexure – X Important Instructions
11 Annexure – XI List of Type Test Reports / Certificate
12 Annexure – XII Details of Fatal / Non-Fatal Accidents Occurred To the Contractor Labours
UNDERTAKING IN REGARD TO ANY PENDING CRIMINAL CASE FOR
13 Annexure – XIII
FRAUD OR MISHANDALING OF MATERIAL
14 Annexure – XIV List of Safety Gadget owned by the bidder
15 Annexure – XV Indemnity Bond
(TO BE SUBMITTED / FILLED IN ONLINE / e-TENDER FORMAT ONLY)
Reference: Tender enquiry No.: COMPANY/ /
Due on date: / / 201 .
In connection with the above subject and reference I/ We confirm the following:
1. I / We, the under signed have read and examined the Tender Specifications in tender mentioned under reference along
with the Commercial terms and conditions.
2. I / We, declare that our Technical Bid is strictly in line with the Tender specifications (except the deviations shown in
Annexure - VII of Technical Deviations as per clause no. 11 of this tender document).
3. Further, I / We also agree that additional conditions / deviations, if any, found in the Commercial terms & conditions
(except reference under clause no. 11 of this tender document), our offer shall be out rightly rejected without assigning
any reason thereof.
Seal of the Firm Signature of the Authorized Representatives of the firm
Name of the Tendering Firm / Agency:
DETAILS OF THE EXPERIENCE FOR SUPPLY OF TENDER ITEM /SIMILAR TYPE OF TENDER ITEM IN LAST FIVE YEARS FROM THE
DUE DATE OF TENDER:
(TO BE SUBMITTED / FILLED IN ONLINE / e-TENDER FORMAT ONLY)
Order Amount Name of Order
Sr No Order No./Date Description of Work placing authority
Completion date as per order Date of commencement of work Date of actual completion of work
LIST OF SATISFACTORY PERFORMANCE CERTIFICATES
(PHOTO COPY/IES OF PERFORMANCE REPORT/S TO BE UPLOADED IN TECHNICAL STAGE OF ONLINE MODE / e-
TENDER FORMAT ONLY)
Sr. Name of the Authority by whom
Reference No. & Date Details of items supplied
No. certificate is issued
Details of Pending Orders, tendered for & on hand, as on the date of the submission of this Tender:
(To be completely filled by the Bidder)
NAME OF WORK ON HAND WORK TENDERED FOR
SR ITS STIPULATED
COST OF ANTICIPATED DATE WHEN REMARKS
NO LOCATION TENDER ESTIMAT DATE OR
REMAINING DATE OF DECISION IS
AND COST ED COST PERIOD OF
WORK COMPLETION EXPECTED
ADDRESS COMPLETION
• If necessary, separate sheet may be used to submit the information.
(Strike off whichever is not applicable)
This is to declare that Mr. /Ms. , employee of DGVCL at _____________ (place), is related to
our _______________designation & name).
This is to declare that none of the Proprietors/ Partners/ Directors are having any relatives employed or working
with DAKSHIN Gujarat VijCo.Ltd.at any of its offices or its parent Department i.e. Energy & Petrochemicals Dept.,
Govt. of Gujarat.
(TO BE SUBMITTED / FILLED IN ONLINE / e-TENDER FORMAT ONLY)
(Duly Notarized) on Rs.300/- Non-Judicial Stamp Paper
(as per tender condition)
I_____________________________________ authorized signatory of M/s.
that Mr./Mrs./Ms. ________________________________ is our Company’s
authorized representative and he/she is employee of our Company/Firm. It is
further declared that he/she is not representative/employee of any other
He/She is authorized for coordination/follow up relating to this tender.
Details of Authorized Representative
Designation : ______________________
Contact Number : __________________
Office Address : ___________________
Accepted and confirmed the above facts
Specimen Signature : __________________
It is certified that signed made by above authorized representative in my
Signature of Authorized signatory : ________________
Designation : ______________________
Contact Number : __________________
Office Address : ___________________
(TO BE SUBMITTED / FILLED IN ONLINE / e-TENDER FORMAT ONLY)
TECHNICAL& COMMERCIAL DEVIATIONS, IF ANY, TO BE FURNISHED IN THIS ANNEXURE ONLY
Deviation offered to
Chapter No, Clause No. of the Deviation offered
tender document
ANNEXURE – VIII
(UNDERTAKING IN REGARD TO STOP DEAL / BANNED FOR BUSINESS DEALING / BLACK LIST THEREOF).
Sub: Undertaking in regard to Stop Deal / Banned for Business dealing / Black List Thereof.
Ref: Tender No.:
their proprietor / any partner / any directors of the firm is not stop deal and/or banned for business dealing and/or black
listed by GUVNL and/or their any subsidiary company viz. GSECL / GETCO / DGVCL / MGVCL / UGVCL / PGVCL.
Signature of the Tenderer
Seal of the Firm
(TO BE SUBMITTED / FILLED IN ONLINE / e-TENDER FORMAT ONLY)
Tender No. COMPANY/
On Firm’s Letter Head
CERTIFICATE – “A”
I / We__________________________________ authorised signatory of
M/s.______________________________________ is not related with other firms who have submitted tenders for
the same items under this inquiry / Tender.
Seal of the Firm Signature of the Tenderer
With Designation
(TO BE SUBMITTED / FILLED IN ONLINE / e-TENDER FORMAT ONLY)
Tender No. COMPANY/
IMPORTANT INSTRUCTIONS
1. The Tenderer should clearly give certificate along with the Technical Bid:
“This is to confirm and certify that the offer submitted by me is strictly in accordance with COMPANY Tender
specifications, Guaranteed Technical Particulars and drawing as mentioned in the Tender Specifications. There is no
commercial or Technical deviation (except the deviations shown in Annexure of Technical Deviations as per this tender
document) in the offer from COMPANY Tender Specification. I undertake to abide by COMPANY Technical specification /
Guaranteed Technical Particulars / Drawing, I undertake to supply materials strictly as per COMPANY Technical
specification / Guaranteed Technical Particulars / Drawing, even if any technical deviations are mentioned by me. I also
undertake to abide by all commercial conditions of COMPANY, including delivery schedule.”
2. Any offer without above certificate will not be considered and the tender will be out rightly ignored in the absence of
above certificate.
3. After opening of the Tender, if it is found that the offer given by the Tenderer is not according to COMPANY specifications,
Guaranteed Technical Specifications, Drawing and commercial terms and conditions and false certificate is given by the
Tenderer, then COMPANY will not deal with the firm for the present Tender. It is, therefore requested that the Tenderer
should take care in giving their offer and submission of documents, including Type Test certificate.
4. The conditional tenders will not be accepted.
5. In connection with the above subject and reference I/We confirm the following:
I. I/We the under signed have read and examined the Bid specifications in Bid mentioned under reference along
with the Condition of Contract (Commercial and Legal)
II. I/We declare that our Technical Bid is strictly in line with the Bid specifications (expect the deviation shown in
Annexure of technical deviation as per Clause no. 7.7 of section 2 of the Bid document).
III. Further I/We also agree that additional conditions/deviations, if any found in the Condition of Contract
(Commercial and Legal) (except reference under clause no. 7.7 of section 2 of this Bid document) our offer
shall be out rightly rejected without assigning any reason thereof.
(Signature of the Tenderer)
LIST OF TYPE TESTS REPORTS SUBMITTED WITH THE TECHNICAL BID
(For the work of Laying of HT/LT Underground Cable) (Not Older than 7 Years)
Sr. No Type Test Report Tests Carried out at Rating & Type / Name of the test Results Of the
No. & Date (Name of Designation of Item / Conducted Tests.
Laboratory) Equipment
Details of Fatal/Non-Fatal Accidents Occurred To the Contractor Labours during Last Five Years
Nos. of Affected
Sr. Type Of Accident Fatal/Nonfatal Brief Reason for the
(Electrical/Mechanical) Accident
UNDERTAKING IN REGARD TO ANY PENDING CRIMINAL CASE FOR FRAUD OR MISHANDALING OF MATERIAL
All bidders will have to furnish the following undertaking duly filled in signed and stamped for each quoted item of the tender along
with the Technical Bid.
M/s_____________________________________________ hereby declare that none of the Proprietors/ Partners/ Directorsis not
under any criminal investigation for any kind of fraud for theft of material or/and with handlings the material and any civil and/or
criminal case pending for such matter listed by GUVNL and or any subsidiary companies viz. PGVCL / UGVCL / DGVCL / MGVCL
/ GSECL / GETCO for the tendered items and/or work.
Seal of the Firm
Signature of the Tenderer with Designation
List of Safety Gadgets Owned by Bidder
Sr. Nos. gadgets owned
No. List of Safety Gadget Unit
2 Earthing Rod No
4 Safety Belt No
5 Hand Gloves for LT Pair
6 Hand Gloves for HT Pair
7 Other safety items
In consideration of the DAKSHIN GUJARAT VIJ COMPANY LTD., herein after known as the COMPANY having given
contract for the work of
as per A/T No. , dated and all future contract that may be awarded to me in the next one year and
in terms of the condition in instruction to bidder clause 27 of the COMPANY’s tender and contract for work.
I residing at by this Bond bind myself responsible for and shall pay compensation to my workmen payable under
the workmen’s compensation ACT – 1923 (viii of 1923) hereinafter called the said Act for death or injuries caused to the workmen
engaged by this presents, if such compensation is paid by the COMPANY as principal under such sub-section (1) of section
of the said Act on behalf of me, to pay such amount of compensation on demand within 48 hours to the COMPANY that it might
have to spend as legal and other incidental charges in defending any suit or action arising out of the death of injuries in regard to
compensation paid to the workmen or heirs of the deceased workmen.
Now the condition of the above written Bond is such that any suit of action arising out of the death or injuries to the workmen
engaged by me. During the execution of work of said contract and all future contracts that may be awarded to me in the next one
year is filed by the worker against the COMPANY, I shall imbrues to the COMPANY such sum that the COMPANY is required
to spend as legal and other incidental charges in defending such suit or action and also the amount that may be ordered to be
paid to the worker / or his heirs as compensation and that the above written bind shall remain in full force and virtue till the
COMPANY is required to defend such suit or action filed by the workers and or heirs against the COMPANY. Further it is applicable
on death of contractor himself also. No any compensation will be claimed by legal heirs of contractor.
Witnesses: Signature of the Executants
Tender for ARC of Erection of HT/LT line,T/C work & Maintenance & U/G Work coastal and or other scheme for
HANSOT SDN UNDER Ankleshwar (O&M) Division.
Sr. No. Item Code Item Unit FY 2024-25
HT TAPPING FROM THE EXISTING POLE
INCLUDING FIXING OF CROSS ARMS,
CLAMPS ANTI-CLIMBING DEVICES, DANGER
BOARD, INSULATORS ETC. COMPLETE AND
1 9926000001 PAINTING OF FABRICATED MATERIALS AND No.
NUMBERING COMPLETE WITH COST OF
PAINTS AS PER STANDARD SPECIFICATION
BUT EXCLUDING ERECTION OF GUY SET AND
ERECTION OF PSC POLES OF 8 *200 KG
INCLUDING EXCAVATION OF PIT AND
REFILLING OF EARTH, FIXING OFCROSS
ARMS, TOP FITTING CLAMPS ANTI-CLIMBING
DEVICES, INSULATORS ETC. COMPLETE AND
PAINTING OF FABRICATED MATERIALS USED
ON THE POLES AND NUMBERING WITH
COST OF PAINT AS PER STANDARD
SPECIFICATION BUT EXCLUDING ERECTION
OF GUY SET AND EARTHING.
ERECTION OF STEEL POLES OF 9 TO
METERS INCLUDING EXCAVATION OF PIT
AND REFILLING OF EARTH, FIXING OFCROSS
ARMS, TOP FITTING CLAMPS ANTI-CLIMBING
DEVICES, DANGER BOARD, INSULATORS ETC.
3 9926000003 COMPLETE AND PAINTING OF STEEL POLE, No.
FABRICATED MATERIALS USED ON THE
POLEAND NUMBERING WITH COST OF
PAINT AS PER STANDARD SPECIFICATION
BUT EXCLUDING ERECTION OF GUY SET AND
ERECTION OF STEEL POLE OF 13 METERS
FOR RAILWAY CROSSING ON BG/MG/NG
LINE FOR 0.400/11/22KV OVERHEAD LINES
I.E INCLUDING EXCAVATION OF PIT &
REFILLING OF EARTH, FIXING CROSS ARMS,
TOP FITTING CLAMPS,ANTI-CLIMBING
4 9926000004 DEVICES DANGER BOARD, INSULATORS ETC. No.
COMPLETE AND PAINTING OF STEEL POLES,
FABRICATED MATERIALS USED ON THE
POLES AND NUMBERING WITH COSTOF
PAINT AS PER STANDARD SPECIFICATION
BUT EXCLUDING ERECTION OF GUY SETS
ERECTION OF DOUBLE POLE STRUCTURE OF
8 METERS 200 KG PSC POLES INCLUDING
EXCAVATION OF PITS & REFILLING OF
EARTHING, FIXING OF CHANNELS,
SUPPORTING ANGLES,CLAMPS, ANTI-
CLIMBING DEVICES DANGER
5 9926000005 BOARDS,INSULATORS ETC.COMPLETE AND No.
PAINTING OF FABRICATED MATERIALS USED
ON THE POLES AND NUMBERING WITH
COST OF PAINT AS PER STANDARD
SPECIFICATION BUT EXCLUDING ERECTION
OF GUY SETS AND EARTHING.(WITHOUT AB
ERECTION OF DOUBLE POLE STRUCTURE OF
9 TO 11 METERS.STEEL POLE INCLUDING
EXCAVATION OF PITS & REFILLING OFEARTH,
FIXING OF CHANNELS, SUPPORTING ANGLES,
CLAMPS,ANTI-CLIMBING DEVICES DANGER
BOARDS, INSULATORS ETC.COMPLETE &
PAINTING OF POLES,FABRICATED
MATERIALSUSED ON THE POLES AND
NUMBERING WITH COST OF PAINTSAS PER
STANDARD SPECIFICATION BUT EXCLUDING
ERECTION OF GUY SET AND
EARTHING.(WITHOUT AB SWITCH)
ERECTION OF DOUBLE POLE STRUCTURE
WITH MOUNTING OF AB SWITCH, HG FUSES
OF 8 MTRS 200 KG PSC POLES INCLUDING
EXCAVATION OF PITS AND REFILLING OF
EARTH,FIXING OF CHANNELS SUPPORTING
ANGLES, CLAMPS, ANTI-CLIMBING DEVICES,
7 9926000007 DANGER BOARDS, INSULATORS,DOFUSES No.
ETC. COMPLETE AND PAINTING OF
FABRICATED MATERIALS USED ON THE
POLES AND NUMBERING WITH COSTOF
PAINT AS PER STANDARD SPECIFICATION
BUT EXCLUDINGOF ERECTION OF GUY SET
AND EARTHING.(WITH AB SWITCH)
ERECTION OF DOUBLE POLE STRUCTURE
WITH MOUNTING OF AB SWITCH,HG FUSES,
9 TO 11 METERS STEEL POLES INCLUDING
EXCAVATION OF PITS AND REFILLING OF
EARTH, FIXING OFCHANNEL, SUPPORTING
ANGLES, CLAMPS, ANTI-CLIMBING DEVICES
8 9926000008 DANGER BOARDS, INSULATORS, ETC. No.
COMPLETE AND PAINTING OF POLES
FABRICATED MATERIALS USED ON THE
POLES AND NUMBERING WITH COST OF
PAINT AS PER STANDARD SPECIFICATION
BUT EXCLUDING ERECTION OF GUY SET AND
EARTHING.(WITH AB SWITCH)
ERECTION OF DOUBLE POLE STRUCTURES
WITH MOUNTING OFAB SWITCH, HG
FUSES, TRANSFORMERS, LIGHTENING
ARRESTORS, DISTRIBUTION BOX. OF
METER,200KG PSC POLE METERS POLES
INCLUDING EXCAVATION OF PITS AND
REFILLING OF EARTH, CARTING OF
TRANSFORMERS FROMSTORES TO SITE,
FIXING OF CHANNELS, SUPPORTING
ANGLES,BRACINGS CROSS ARMS CLAMPS,
ANTICLIMBING DEVICES DANGER BOARDS,
CONDUCTOR AND CABLE WIRING
ETC.COMPLETE AND PAINTING OF
FABRICATED MATERIALS USEDON THE
POLES AND NUMBERING WITH COST OF
PAINT AS PER STANDARD SPECIFICATION
BUT EXCLUDING ERECTION OF GUY SETS
ERECTION OF DOUBLE POLE STRUCTURE
WITH MOUNTING OF AB SWITCH,HG FUSES
TRANSFORMERS, LIGHTENING ARRESTORS,
DISTRIBUTION BOX 9 TO 11 METERS STEEL
POLES INCLUDING EXCAVATION OF PITS &
REFILLING OF EARTH CARTING OF
TRANSFORMERS FROM STORE TO SITE,
FIXINGOF CHANNELS SUPPORTING ANGLES,
BRACING, CROSS ARMS,CLAMPS,
ANTICLIMBING DEVICES, DANGER
BOARDS,CONDUCTOR AND CABLE WIRING
ETC. COMPLETE AND PAINTING OF POLES
FABRICATED MATERIALS USED ON THE
POLES AND NUMBERING AS PER STANDARD
SPECIFICATION BUT EXCLUDING ERECTIONS
OF GUY SETS AND EARTHING.
ERECTION OF GUY SET INCLUDING
EXCAVATION OF PITS & REFILLING OF EARTH
AS PER STANDARD SPECIFICATION WITH
11 9926000011 STAY CLAMPS, STAY WIRE, ANCHOR ROD, No.
TURN BUCKLE, EYEBOLT, GUY INSULATOR,
CEMENT CONCRETE BLOCK ETC. BUT
EXCLUDING CONCRETING.
CONCRETING OF POLES, GUYS, ETC.
INCLUDING COST OF CEMENT SAND METAL
12 9926000012 (1:2:4) AND WATER ETC. AS PER STANDARD CMT
SPECIFICATION.(cement Should be 53 grade)
used for Concreting.
ERECTION OF COIL TYPE EARTHING
INCLUDING COST OF COAL,SALT ETC. BUT
13 9926000013 WITHOUT COST OF GI WIRE AS PER No.
STANDARD SPECIFICATION(20kg solt+20kg
ERECTION OF GI PIPE/CI PLATE TYPE
EARTHING INCLUDINGCOST OF COAL SALT
14 9926000014 ETC. BUT WITHOUT COST OF PIPE/GIPLATE No.
GI WIRE AS PER STANDARD
SPECIFICATION.(20kg solt+20kg coal)
ERECTION OF STREET LIGHT FIXTURE
COMPLETE WITH CLAMPS, BRASS NIPPLE,
BRASS HOLDER TECK WOOD
BUSH,REFLECTORS FUSE, WIRING ETC. AS
PER STANDARD SPECIFICATION BUT
EXCLUDING COST OF MATERIALS.
OF(30mm2)ACSR/34MM@,55MM2 AAA
CONDUCTOR for ALL TYPE OF CONDUCTOR
16 9926000016 ONE COND PER KM
(EXCEPT DOG CONDUCTOR) FOR 11/22KV &
LT LINES INCLUDING FIXING OF INSULATORS,
BINDING JUMPERING ETC.
STRINGING OF GI WIRE 8 SWG INCLUDING
BINDING JUMPERING ETC.
PROVIDING SINGLE PHASE SERVICE
CONNECTION WITH PVC 2.5/4MM2 TWIN
CORE CABLE FROM TERMINAL POLE TO
18 9926000018 METERING POINT INCLUDING FIXING OF No.
METER WITH METER EARTHING COMPLETE
WORK AS PER STANDARD SPECIFICATION
BUT EXCLUDING COST OF MATERIALS.
PROVIDING THREE PHASE 4 WIRE SERVICE
CONNECTION WITH PVC 4MM2/10MM2
FOUR CORE CABLE FROM TERMINAL POLE
19 9926000019 TO METERING POINT INCLUDING FIXING OF No.
METER WITH METER EARTHING COMPLETE
WORK AS PER STANDARD SPECIFICATION
BUT EXCLUDING COST OF MATERIALS.
ADDITIONAL COST FOR EXCAVATION OF PIT
IN HARD ROCK AREA FOR ERECTION OF
POLE/ GUY ETC. AS PER STANDARD
SPECIFICATION OVER & ABOVE NORMAL
20 9926000020 COST COVERED AGAINST EXCAVATION OF No.
PIT UNDER NORMAL SOIL FOR ERECTION OF
POLE,GUY, DOUBLE POLE STRUCTURE
EARTHING WITH THE APPROVAL OF
SUPDT.ENGINEER.
PROVIDING GUARDING TO HT LINE ON
ROAD/ RAIL CROSSING.
PROVIDING GUARDING OF LT LINES ON
ROAD/RAIL CROSSING.
23 9926000023 LT LINE TAPPING- SINGLE PHASE No.
24 9926000024 LT LINE TAPPING- THREE PHASE No.
Stringing/LAYING OF OVER HEAD LT CABLE
FOR ROAD CROSSING,HT LINE CROSSING
AND TELEPHONE LINE CROSSING ETC.(PER
ERECTION OF SINGLE POLE STRUCTURES
WITH , HG FUSES,TRANSFORMERS,
LIGHTENING ARRESTOR, DISTRIBUTION BOX.
ON 8 METERS 200 KGAND PSC POLE
INCLUDING EXCAVATION OF PITS AND
REFILLING OF EARTH, CARTING OF
TRANSFORMERS FROM STORES TO SITE,
FIXING OF CHANNELS, SUPPORTING
26 9926000026 ANGLES,BRACINGS CROSS ARMS CLAMPS, No.
ANTICLIMBING DEVICES DANGER BOARDS,
CONDUCTOR AND CABLE WIRING
ETC.COMPLETE AND PAINTING OF
FABRICATED MATERIALS USED ON THE POLE
AND NUMBERING WITH COST OF PAINT AS
PER STANDARD SPECIFICATION BUT
EXCLUDING ERECTION OFGUY SETS AND
ERECTION OF SINGLE POLE STRUCTURES
WITH MOUNTING OFAB SWITCH , HG
FUSES,TRANSFORMERS,
LIGHTENINGARRESTOR, DISTRIBUTION BOX.
ON 9 to 11 METERS RSJ POLE INCLUDING
27 9926000027 EXCAVATION OF PITS AND REFILLING OF No.
EARTH, CARTING OF TRANSFORMERS FROM
STORES TO SITE, FIXING OF CHANNELS,
SUPPORTING ANGLES,BRACINGS CROSS
ARMS CLAMPS, ANTICLIMBING DEVICES
DANGER BOARDS, CONDUCTOR AND CABLE
WIRING ETC.COMPLETE AND PAINTING OF
FABRICATED MATERIALS USED ON THE POLE
AND NUMBERING WITH COST OF PAINT AS
PER STANDARD SPECIFICATION BUT
EXCLUDING ERECTION OFGUY SETS AND
ERECTION OF PSC POLES OF 10 *270 KG
INCLUDING EXCAVATION OF PIT AND
REFILLING OF EARTH, FIXING OF CROSS
ARMS, TOP FITTING CLAMPS ANTI-CLIMBING
DEVICES, INSULATORS ETC. COMPLETE AND
PAINTING OF FABRICATED MATERIALS USED
ON THE POLES AND NUMBERING WITH
COST OF PAINT AS PER STANDARD
SPECIFICATION BUT EXCLUDING ERECTION
OF GUY SET AND EARTHING.
ERECTION OF DOUBLE POLE STRUCTURE OF
10 METERS 270 KG PSC POLES INCLUDING
EXCAVATION OF PITS & REFILLING OF
EARTHING, FIXING OF CHANNELS,
SUPPORTING ANGLES,CLAMPS, ANTI-
CLIMBING DEVICES DANGER
29 9926000029 BOARDS,INSULATORS ETC.COMPLETE AND No.
PAINTING OF FABRICATED MATERIALS USED
ON THE POLES AND NUMBERING WITH
COST OF PAINT AS PER STANDARD
SPECIFICATION BUT EXCLUDING ERECTION
OF GUY SETS AND EARTHING.(WITHOUT AB
STRINGING OF 100MM2 ACSR/100MM2
AAAC CONDUCTOR FOR 11/22KV & LT LINES
30 9926000030 ONE COND PER KM
INCLUDING FIXING OFINSULATORS, BINDING
STRINGING OF DOG CONDUCTOR FOR
31 9926000031 11/22KV & HT LINES INCLUDING FIXING OF ONE COND PER KM
INSULATORS, BINDING JUMPERING ETC.
ERECTION OF DOUBLE POLE STRUCTURES
WITH MOUNTING OF AB SWITCH, HG
FUSES, TRANSFORMERS, LIGHTENING
ARRESTORS, DISTRIBUTION BOX. OF
METERS 270 KGAND PSC POLES INCLUDING
EXCAVATION OF PITS AND REFILLING OF
EARTH, CARTING OF TRANSFORMERS
FROMSTORES TO SITE, FIXING OF
32 9926000032 CHANNELS, SUPPORTING ANGLES,BRACINGS No.
CROSS ARMS CLAMPS, ANTI-CLIMBING
DEVICES,DANGER BOARDS, CONDUCTOR
AND CABLE WIRING ETC.COMPLETE AND
PAINTING OF FABRICATED MATERIALS USED
ON THE POLES AND NUMBERING WITH
COST OF PAINT AS PER STANDARD
SPECIFICATION BUT EXCLUDING ERECTION
OF GUY SETS AND EARTHING.
DISMENTALLING OF 8 MTR PSC POLE WITH
CREDITING OF FABRICATION AT STORE &
STACKING OF POLE SAFELY ON ROAD SIDE
OR CREDITING TO DEPARTMENTAL STORE
DISMENTALLING OF 10 MTR PSC POLE WITH
CREDITING OF FABRICATION AT STORE &
STACKING OF POLE SAFELY ON ROAD SIDE
OR CREDITING TO DEPARTMENTAL STORE
DISMENTALLING OF TRANSFORMER CENTRE
(8 MTR PSC POLE) (WITH TRANSFORMER)
WITH CREDITING OF FABRICATION &
TRANSFORMER AT STORE & STACKING OF
POLE SAFELY ON ROAD SIDE OR CREDITING
TO DEPARTMENTAL STORE
DISMENTALLING OF TRANSFORMER CENTRE
(8 MTR PSC POLE) (WITHOUT
TRANSFORMER) WITH CREDITING OF
FABRICATION AT STORE & STACKING OF
POLE SAFELY ON ROAD SIDE OR CREDITING
TO DEPARTMENTAL STORE
STRINGING OF LT ABC OF 1*35 SQ MM +
1*25 SQ MM INCLUDING FITTING OF ALL
ACESSARIES I.E. SPECIAL DESIGN
SUSPENSION / TENSION CLAMP, FIXING OF
CROSS ARM, LT SHACKLE INSULATOR ETC.
FOR FIXING OF MESSENGER WIRE AND TO
PROVIDE SERVICE CONNECTION ON AERIAL
BUNCH CABLE BY INSULATED PIERCEING
CONNECTORS THROUGH SERVICE
CONNECTION BOX COMPLETE AS REQUIRED
& DIRECTED BY ENGINEER IN CHARGE.
STRINGING OF LT ABC OF 3*50 SQ MM
+1*25 SQ MM+1*35 SQ MM INCLUDING
FITTING OF ALL ACESSARIES I.E. SPECIAL
DESIGN SUSPENSION / TENSION CLAMP,
FIXING OF CROSS ARM, LT SHACKLE
38 9926000038 INSULATOR ETC. FOR FIXING OF MESSENGER KM
WIRE AND TO PROVIDE SERVICE
CONNECTION ON AERIAL BUNCH CABLE BY
INSULATED PIERCEING CONNECTORS
THROUGH SERVICE CONNECTION BOX
COMPLETE AS REQUIRED & DIRECTED BY
ENGINEER IN CHARGE.
STRINGING OF 11KV ABC OF 3*95 SQ MM
+80 SQ MM INCLUDING FITTING OF ALL
ACESSARIES I.E. SPECIAL DESIGN
SUSPENSION / TENSION CLAMP, FIXING OF
CROSS ARM, BINDING TO PIN
INSULATOR,PREPARING SHACKLE
POINT,JUMPERS ETC. AS REQUIRED &
DIRECTED BY ENGINEER IN CHARGE
STRINGING OF 22 KV ABC OF 3*70 SQ MM
+95 SQ MM INCLUDING FITTING OF ALL
ACESSARIES I.E. SPECIAL DESIGN
SUSPENSION / TENSION CLAMP, FIXING OF
CROSS ARM, BINDING TO PIN
INSULATOR,PREPARING SHACKLE
POINT,JUMPERS ETC. AS REQUIRED AND
DIRECTED BY ENGINEER IN CHARGE
STRINGING OF LT ABC OF 2*50 SQ MM
+1*25 SQ MM+ 35 SQ MM INCLUDING
FITTING OF ALL ACESSARIES I.E. SPECIAL
DESIGN SUSPENSION / TENSION CLAMP,
FIXING OF CROSS ARM, LT SHACKLE
INSULATOR ETC. FOR FIXING OF MESSENGER
WIRE AND TO PROVIDE SERVICE
CONNECTION ON AERIAL BUNCH CABLE BY
INSULATED PIERCEING CONNECTORS
THROUGH SERVICE CONNECTION BOX
COMPLETE AS REQUIRED & DIRECTED BY
ENGINEER IN CHARGE.
DISMENTALING OF RSJ (9/11 METER) POLE
42 9926000042 AND CREDITING THE OLD MATERIAL TO No.
DISMENTALING OF TRANSFORMER CENTER
ON 10MTR,270KG PSC POLE(WITHOUT
TRANSFORMER) WITH CREDITING OF
FABRICATION AT STORE AND STACKING OF
POLE SAFELY ON ROAD SIDE OR CREDITING
TO DEPARTMENTAL STORE
DISMENTALING OF TRANSFORMER CENTER
ON 10MTR,270KG PSC POLE(WITH
TRANSFORMER) WITH CREDITING OF
FABRICATION AT STORE AND STACKING OF
POLE SAFELY ON ROAD SIDE OR CREDITING
TO DEPARTMENTAL STORE
DISMENTLING OF 11KV ABC OF 3*95 SQ MM
+80 SQ MM AND CREDITING FITTING OF
ALL ACESSARIES AND FABRICATION TO
DEPARTMENTAL STORE
DISMENTLING OF 22 KV ABC OF 3*70 SQ
MM +95 SQ MM AND CREDITING FITTING
OF ALL ACESSARIES AND FABRICATION TO
DEPARTMENTAL STORE
DISMENTALING OF LT ABC OF 1*35 SQ MM
+ 1*25 SQ MM AND CREDITING FITTING OF
ALL ACESSARIES TO DEPARTMENTAL STORE.
DISMENTALING OF LT ABC OF 3*50 SQ MM
48 9926000048 +1*25 SQ MM+1*35 SQ MM AND KM
CREDITING FITTING OF ALL ACESSARIES TO
DEPARTMENTAL STORE.
DISMENTALING OF LT ABC OF 2*50 SQ MM
49 9926000049 +1*25 SQ MM+ 35 SQ MM AND CREDITING KM
FITTING OF ALL ACESSARIES TO
DEPARTMENTAL STORE.
RESTRINGING OF ALL TYPE OF CONDUCTOR
(EXCEPT DOG CONDUCTOR) FOR 11/22KV &
50 9926000050 ONE COND PER KM
LT LINES INCLUDING FIXING OF INSULATORS,
BINDING JUMPERING ETC.
RESTRINGING OF DOG CONDUCTOR FOR
51 9926000051 11/22KV HT LINES INCLUDING , BINDING ONE COND PER KM
LABOUR CHARGE FOR THE INSTALLATION OF
52 9926000052 NEW DTR METER. (METER WILL BE No.
PROVIDED BY DGVCL)
LABOUR CHARGE FOR THE REPLACEMENT
OF DTR METER AND OLD METER SHOULD BE
CREDITED TO SDN STORE. (METER WILL BE
PROVIDED BY DGVCL)
LABOUR CHARGE FOR PROVIDING CT COIL
54 9926000054 FOR DTR METER CONNECTION. (CT COIL PER CT
WILL BE PROVIDED BY DGVCL)
LABOUR CHARGE FOR REPLACEMENT OF CT
COIL FOR DTR METER CONNECTION AND
55 9926000055 OLD CT SHOULD BE CREDITED TO SDN PER CT
STORE. (CT COIL WILL BE PROVIDED BY
LABOUR CHARGE FOR FIXING OF MMB FOR
56 9926000056 DTR METER (MMB WILL BE PROVIDED BY No.
LABOUR CHARGE FOR REPLACEMENT OF
57 9926000057 DTR METER BOX. (METER WILL BE No.
PROVIDED BY DGVCL)
PROVIDING / REPLACEMENT OF 1.5 SQ MM
58 9926000058 10 CORE COPPER CABLE 3.5 METER (CABLE No.
TO BE PROVIDED BY AGENCY)
LABOUR CHARGE FOR
PROVIDING/RECONNECTION OF TERMINAL
59 9926000059 PER TERMINATION
CONNECTION WITH PROPER SIZE OF LUGS.
(LUGS COST IS BORNE BY AGENCY)
LABOUR CHARGE FOR THE SPOT READING
OF DTR METER WITH DETAIL SURVEY OF
DEFECT IF ANY. A DULY SIGN COPY BY
SURVEYOR PERSON OF AGENCY IN PRO-
60 9926000060 FORMA REPORT SHOULD BE SUBMITTED TO PER DTR
SDN OFFICE.(* ONLY IF ALL PARAMETER OF
VOLTAGE, CURRENT & LOAD AS SHOWN IN
PER-FORMA IS FILLED) AS PER THE
INSTRUCTION OF ENGINEER IN-CHARGE.
LABOUR CHARGE FOR THE SPOT READING
OF DTR METER WITH DETAIL SURVEY OF
DEFECT IF ANY. A DULY SIGN COPY BY
SURVEYOR PERSON OF AGENCY IN PRO-
FORMA REPORT SHOULD BE SUBMITTED TO
SDN OFFICE. (DULY FILL PER-FORMA IN
FAULT CONDITION IN WHICH READING
PARAMETER IS NOT SHOWN IN METER)
INSTALLATION OF DTR METER INCLUDING
METER BOX, PROVIDING & FIXING OF 1.5SQ
MM SINGLE STRAND 10 CORE ARMOURED
COPPER CABLE (3.5METER), TERMINATION
IN METER & COIL ETC.(METER, METER BOX,
C.T./P.T. COIL WILL BE PROVIDED BY DGVCL)
INSTALLATION OF DTR METER INCLUDING
METER BOX, TERMINATION IN METER &
63 9926000063 COIL ETC. (WITHOUT 10CORE COPPER No.
CABLE) (METER, METER BOX, C.T./P.T. COIL
WILL BE PROVIDED BY DGVCL)
Binding of messanger Conductorat with a
distance not more than 0.75 mtr with
64 9926000064 turns minimum on XLPE Cable with single No
strand binding wire (including cost of
Supply and Installation of 11/22 kV
Distribution Transformers HT Terminal
65 9926000086 protector (UV Resistance) with using PER SET
95/120/150 sq.mm long barrel aluminum
lug. (1Set = 3 Nos i.e. on R, Y, B)
Supply & Installation of HT EPR Tap on 11/22
kV Distribution Transformer with
replacement of bare conductor by HT ABC
66 9926000087 conductor (DO bottom side to transformer) PER SET
after removal of semi conductor by HT ABC
(6 inch both side). HT ABC to be supplied by
DGVCL. (1Set = 3 Nos i.e. on R, Y, B)
Supply, Installation, Testing and
Commissioning of Maintenance Free, Ready
Capsule, Pipe-In-Cage (Pic) Type, Earth
67 9926000088 Electrodes for HT Feeder Pole Having 2000 NO
mm Electrode Length as per the Tender
Specifications and Drawing. (All Materials
Will Be Supplied By Agency)
Supply, Installation, Testing and
Commissioning of Maintenance Free, Ready
Capsule, Pipe-In-Cage (Pic) Type, Earth
68 9926000089 Electrodes for HT Feeder Pole Having 3000 NO
mm Electrode Length as per the Tender
Specifications And Drawing. (All Materials
Will Be Supplied By Agency)
Supply and Installation of 25 X 3 mm GI Strip
having hot dip- galvanized-zinc coating of
80-100 microns without any joints or
welding. Both the end of the GI strip should
be connected with GI nut bolts and required
fabrication work for giving separate earthing
(1) Neutral of the transformer
(2) MS structures of the transformer center
(Approximately 25 meter GI strip per
transformer centre
- as per requirement and instruction of
Engineer in- charge) (All Materials will be
supplied by Agency)
Supply and Installation of uPVC standard
make Pipe of 1.25" diameter for covering GI
strip with UV protected Cable Ties of 550 X
7.6 mm size to bind with pole
face(Approximately 25 meter uPVC pipe for
GI strip covering per transformer centre -as
per requirement and instruction of Engineer
Supply & fixing of upto 33 kV
Conductor sleeve for Busbar to Drop
out Fuse and Drop out fuse to
71 9926000093 Transformer H.T. including Busbar (12 Per TC
mm sleeve) as per technical
specification. (All Materials will be
supplied by Agency)
Supply & fixing of upto 33 kV
Conductor sleeve for Busbar to Drop
out Fuse and Drop out fuse to
9926000100 Transformer H.T. without Busbar (12 Per TC
mm sleeve) as per technical
specification. (All Materials will be
supplied by Agency)
Supply & fixing of upto 33 kV
Conductor sleeve for Busbar to Drop
out Fuse and Drop out fuse to
72 9926000094 Transformer H.T. including Busbar(15 Per TC
mm sleeve) as per technical
specification. (All Materials will be
supplied by Agency)
Supply & fixing of upto 33 kV
Conductor sleeve for Busbar to Drop
out Fuse and Drop out fuse to
9926000101 Transformer H.T. without Busbar(15 Per TC
mm sleeve) as per technical
specification. (All Materials will be
supplied by Agency)
Supply & fixing of Disc type Red Color
FRP(Non-flammable) material with Weather
resistant, Non-conductive bird guard
OD=300 MM, ID=33 MM, Width =1.25 MM,
one side cut from ID to OD. (All Materials
will be supplied by Agency)
Providing and fixing of LT Terminal
protectors i.e. Re-useable boot (LT Side
74 9926000096 kV) including LT (1.1 kV) insulating taps. All No
live part at LT side shall be covered with
fixing of LT insulating taps.
75 Nylon Net around Transformer Center
76 9926000097 Nylon Net (12 * 15 ft) Per Net
77 9926000098 Nylon Dori Per TC
Labour charge for fitting Nylon Net (All
78 9926000099 fabricated material for fitting nylon net shall Per TC
be provided by DGVCL)
Cutting of Tree branches surounding HT/LT
79 9924000001 Per Tree
Replacement of old jumpers & providing
80 9924000002 new double jumpers with 8" binding [D No.
Type] & capsuling with PVC pipe etc
81 9924000005 Support pole for Stay PSC/STP/RSJ No.
Pin binding of conductor 11/22kv Pin
Pin binding of conductor 11/22kv Pin
83 9924000007 insulator per pole in costle area with No.
84 9924000008 Pin binding of conductor LT shakel insulator No.
Replacement of one/both disc.insulator at
Replacement of LT shackle insulator at cut
87 9924000011 Refixing of V cross Arm No.
Replacement of V cross Arm (With
Transportation & Painting)
89 9924000013 Refixing of Top fitting in proper position No.
90 9924000014 Replacement of Top fitting No.
91 9924000015 Replacement of LT cross Arm No.
Providing DO fuse on DP with carting &
jumpuring(ONE DO FUSE)
Numburing of pole with paint by preparing
93 9924000017 back ground of one colour and have No.
lettering(height 3" * width 0.5") using stensil
94 9924000018 Fixing of MMB(1PH.) at consumer end No.
95 9924000019 Fixing of MMB(3PH.) at consumer end No.
96 9924000020 Replacement of (1ph.) meter for Urban area No.
97 9924000021 Replacement of (1ph.) meter for Rural area No.
painting consumer no. on MMB (Urban)
(with letter size height 40mm* width 8mm)
painting consumer no. on MMB (Rural)
(with letter size height 40mm* width 8mm)
Replacement of deteriorated Single phase
Fixing of new dist. Box with complete wiring
including clamps,nut bolts etc.
Reparing of guarding involving reshaping of
bearer wire cross lacing binding etc.
Painting of steel fabricated material of RSJ
DO DP structure with paint
Painting of steel fabricated material of RSJ
104 9924000028 pole mounted transformer double pole No.
structure with paint
Painting of steel fabricated material of RSJ
single pole with paint
painting of steel fabricated material of PSC
Single pole (HT line) with paint
painting of steel fabricated material of PSC
DO DP double pole with paint
painting of steel fabricated material of PSC
108 9924000032 double pole at pole mounted transformer No.
109 9924000033 Providing line seperater single phase No.
110 9924000034 Providing line seperater three phase No.
Replacement / Providing of stay insulator
111 9924000035 along with adjustment of tension in stay No.
Replacement of deteriorated /providing LT
112 9924000036 dist. Box with new up to 100KVA capacity & No.
crediting it to store.
Replacement of deteriorated /providing LT
113 9924000037 dist. Box with new above 100KVA capacity & No.
crediting it to store.
114 9924000038 Adjustment of tension in stay wire No.
115 9924000039 Refitting of LA No.
Converting pin point to Shackle point
116 9924000040 location
including dismentaling & restringing etc.
replacement of 11KV Pin insulator with
providing new double pin binding
replacement of 22KV Pin insulator by new
118 9924000042 11kv pin insulator with spares & providing No.
new double pin binding
Providing 11kv double disc insulators with
binding & restringing
Replacement of existing 11kv conductor (all
size) with new double pin binding
Plumbing of PSC Pole with straightening at
Plumbing of PSC Pole with straightening at
Plumbing of tilted DP structure
123 9924000048 (PSC/RSJ/STP) with refilling of stone Murrum No.
Providing new 11kv AB /GO switch with
124 9924000049 fabrication and insulated colour code Set
jumper, binding, lugs etc
Replacement of old 11kv AB /GO switch with
125 9924000051 providing new insulated jumper, binding, Set
Providing cage type loop guard in verticle LT
126 9924000052 per pole
line with using PVC reel insulators etc
Labour charges for replacement /providing
127 9924000053 of MMB & service with all accessories for No.
three phase connection
Labour charges for replacement /providing
128 9924000054 of MMB & service with all accessories for No.
single phase connection
Dismentalling of existing Dist.X'mer
center(RSJ /STP POLE) 25/63/100/200 KVA
with all fabrication & creditig the old
material to store
130 9924000056 Disconnection from LT pole 1 phase No.
Reconnection from LT pole 1 phase
( payment after receipt of R/C charges)
132 9924000058 Disconnection from LT pole 3 phase No.
Reconnection from LT pole 3 phase
( payment after receipt of R/C charges)
Dismentaling & removing of service line
from pole & crediting to S/dn (1 ph.)
Dismentaling & removing of service line
from pole & crediting to S/dn (3 ph.)
Reconnection of service line complete with
PVC cable (1 Ph)
Reconnection of service line complete with
PVC cable (3 Ph)
Providing spiral type earthing by G.I. NO
8(weight 2kg -5mtr in length) with salt and
coal 10kg each, including pvc rigid pipe
138 9924000064 20mm dia( 1.5mtr length) to pass exposed No.
part of G.I. wire at consumer end with all
materials, earth resistance should be less
Providing and fixing of signle core 1.5 sq mm
single strand copper insulated cable with
cable nail clip for spiral type earthing at
consumer end. The end of G.I. no 8 is to be
connected by connector with copper cable
139 9924000070 of which other end shall be connected to the per meter
earth terminal of meter box. This item shall
be used in location where there is more
distance between earth terminal and
earthing terminal of meter. (All materials
supplied by contractor)
Stringing of LT ABC of 1*35 SQ MM + 1*25
SQ MM including fitting of all acessaries i.e.
special design suspension / tension clamp,
fixing of cross arm, LT shackle insulator etc.
for fixing of messenger wire and inclusive of
dismantling charge of existing bare
conductor and crediting in to store &
dismentaling of service line from LT bare
conductor and to provide service connection
on Aerial Bunch Cable by insulated
pierceing connectors through service
connection box complete as required &
directed by Engineer in Charge.
Stringing of LT ABC of 3*50 SQ MM +1*25
SQ MM+1*35 SQ MM including fitting of all
acessaries i.e. special design suspension /
tension clamp, fixing of cross arm, LT shackle
insulator etc. for fixing of messenger wire
and inclusive of dismantling charge of
existing bare conductor and crediting in to
store & dismentaling of service line from LT
bare conductor and to provide service
connection on Aerial Bunch Cable by
insulated pierceing connectors through
service connection box complete as
required & directed by Engineer in Charge.
Stringing of 11KV ABC of 3*95 SQ MM +80
SQ MM including fitting of all acessaries i.e.
special design suspension / tension clamp,
fixing of cross arm, binding to pin
142 9924000067 insulator,preparing shackle point,jumpers KM
etc. and inclusive of dismantling charge of
existing bare conductor and crediting in to
store complete as required & directed by
Engineer in Charge
Stringing of 22 KV ABC OF 3*70 SQ MM +95
SQ MM including fitting of all acessaries i.e.
special design suspension / tension clamp,
fixing of cross arm, binding to pin
143 9924000068 insulator,preparing shackle point,jumpers KM
etc. and inclusive of dismantling charge of
existing bare conductor and crediting in to
store complete as required & directed by
Engineer in Charge
Stringing of LT ABC of 2*50 SQ MM +1*25
SQ MM+ 35 SQ MM including fitting of all
acessaries i.e. special design suspension /
tension clamp, fixing of cross arm, LT shackle
insulator etc. for fixing of messenger wire
and inclusive of dismantling charge of
144 9924000069 existing bare conductor and crediting in to KM
store & dismentaling of service line from LT
bare conductor and to provide service
connection on Aerial Bunch Cable by
insulated pierceing connectors through
service connection box complete as required
& directed by Engineer in Charge.
Labour charge for excavation of cable trench
of 400mm width x 1200mm depth, in any
type of soil for laying of cable of size up to
240 mm2 (For additional cable 200 mm
additional width shall be considered i.e. half
trench length is to be considered)
Labour charge for excavation of cable trench
of 600mm width x 1200mm depth, in any
type of soil for laying of cable of size up to
240 mm2 (For additional cable 200 mm
additional width shall be considered i.e. half
trench length is to be considered)
Labour charge for excavation of cable trench
of 400mm width x 1500mm depth, in any
type of soil for laying of cable of size up to
240 mm2 (For additional cable 200 mm
additional width shall be considered i.e. half
trench length is to be considered)
Labour charge for laying of 11kV / 22 kV
XLPE Cable of size up to 240 mm2 &
preparation of sand layer 100mm thick, in
the cable trench & covering the cable with
150 mm dia (Inner), thickness 25 mm,
meter long RCC half round muffs and
providing and fixing of 4inch width yellow
4 9925000004 colour polyethylene tape with printing Meter
"CAUTION ELECTRIC CABLE BELOW" at
m depth from ground surface after laying
cable in trench. This will provide indication
that electric cable is passing underground so
as to protect cable from mechnical injuries,
refilling the same, as per Instruction of
Engineer in Charge (EIC).
Labour charge for horizontal drilling using
Auger machine without damage to surface
road at max 2.0 mtrs depth & putting of
kg/cm2 , class-4,Green color, 110mm O.D.
8.5mm thickness H.D.P.E. pipe confirms to IS
4984-1987(3rd revision) and BIS certification
and laying of 11KV/22KV XLPE cable of size
up to 240 mm2 in HDPE pipe, as per Site
Condition (excluding cost of pipe). The detail
map obtained from HDD machine and excell
sheet(hard and soft copy) indicating the
respective depth and distance from adjacent
landmark for each segment for HDD is must
required to be submitted. HDD to be carried
out at depth 1.5 mtrs to 2.0 mtrs as per site
conditions and as per instruction of EIC.
Labour charge for horizontal drilling
manually without damage to surface road at
max 2.0 mtrs depth & putting of
kg/cm2 , class-4,Green color, 110mm O.D.
8.5mm thickness H.D.P.E. pipe confirms to IS
4984-1987(3rd revision) and BIS certification
and laying of 11KV/22KV XLPE cable of size
up to 240 mm2 size, as per Site Condition
(excluding cost of pipe). The detail map and
excell sheet(hard and soft copy) indicating
the respective depth and distance from
adjacent landmark for each segment of
cable to be submitted. Drilling to be carried
out at depth Minimum 1.2 mtrs to 2.0 mtrs
as per site conditions as per instruction of
Supply of 6.11kg/cm2 , class-4,Green color,
110mm O.D. , 8.5 mm thickness H.D.P.E.
7 9925000007 pipe confirms to IS 4984 and BIS certification Meter
for laying of underground 11KV / 22KV XLPE
cable up to 240 mm2 size.
Labour work for RCC concreting on disputed
location and repairing of damage portion of
road crossing for the work carried out for
roads crossing as well as concreting &
muffing of ploes including all materials
Providing & fixing concrete stone route
marker of 300 mm width x 150 mm thick x
650 mm height embedded in earth at least
300 mm below & 350 mm above ground
level respectively at distance approx
meters along the length of cable. The RCC
concreting (1:2:4)(all necessary maeterials
will be in bidder's scope) of route marker is
to be carried out 300 mm width x 150 mm
9 9925000009 thick x 300 mm below ground level as per No.
instruction of EIC. The route marker should
be with name of company with approved
yellow colour-DGVCL. The distance from
marker to cable and cable depth with feeder
name etc., marked with arrow sign is to be
painted on it.The route marker is to be fixed
at location near to any fixed permanent
location (not necessary to fix exact on top of
cable) as per instruction of EIC.
Erection of D.P. (double pole) structure
using 9 / 11 Mtr. RSJ pole with cable
connection arrangement along with fitting
10 9925000010 of necessary fabrication for 11KV cable No.
including excavation of pit & refilling of
earth as per instruction of EIC. (Exclusive of
concreting & muffing of poles)
Erection of Single pole structure using 9 /
Mtr RSJ pole with cable connection
arrangement along with fitting ofnecessary
11 9925000011 fabrication for 11KV/22 KV cable including No.
excavation of pit & refilling of earth as per
instruction of EIC. (Exclusive of concreting &
muffing of poles)
Erection of D.P. (double pole) structure
using 8.0 Mtr. PSC pole with cable
connection arrangement along with fitting
12 9925000012 of necessary fabrication for 11KV cable No.
including excavation of pit & refilling of
earth as per instruction of EIC. (Exclusive of
concreting & muffing of poles)
Erection of Single pole structure using
Mtr PSC pole with cable connection
arrangement along with fitting ofnecessary
13 9925000013 fabrication for 11KV/22 KV cable including No.
excavation of pit & refilling of earth as per
instruction of EIC. (Exclusive of concreting &
muffing of poles)
Labour charge for erecting of 11kV / 22 kV
XLPE cable of size up to 240 mm2 on DP
Structure with fixing of 02 Nos polymer
cleats on top and middle part.Polymer
cleats, nut bolts etc. fixing material to be
provided by contractor.
Providing & fixing of 6.11kg/cm2 , class-
4,Green color, 110mm O.D. , 8.5mm
thickness H.D.P.E. pipe confirms to IS
and BIS certification on the erected DP
structure for the mechanical protection of
cable by inserting the cable inside HDPE
15 9925000015 pipe. The HDPE pipe shall be erected in such Per Job
a way that 300mm shall be below the
ground level and the rest 2700 mm shall
be supported on the DP Structure with
No Polymer cleat.All materials including
polymer cleat and Nut bolt to be provided
Providing and fixing of pipe type earthing
from 80 mm dia class-B GI pipe with pit to
be filled with salt & coke and construction of
chamber as per DGVCL Drg. No. dg /100 for
DP and cable. The earthing pit should be
joined with cable by G.I. strip of size 1”
width & 2 mm thick. All material GI pipe,
Coke, Salt etc will be supplied by bidder.
Supply & fixing of heat shrink type end
terminations (outdoor) for upto 11kV 3C x
185 mm2 size XLPE cable as per DGVCL
technical specification
Supply & fixing of heat & shrinkable end
terminations (outdoor) for upto 22 kV 3C x
185 mm2 size XLPE cable as per DGVCL
technical specification)
Supply & fixing of heat shrink type end
terminations (indoor) for upto 11kV 3C x
185 mm2 size XLPE cable as per DGVCL
technical specification)
Supply & fixing of heat & shrinkable end
terminations (indoor) for upto 22 kV 3C x
185 mm2 size XLPE cable as per DGVCL
technical specification
Supply & fixing of heat shrinkable straight
through joint for upto 11kV 3C x 185 mm2
size XLPE cableas per DGVCL technical
Supply & fixing of heat shrinkable straight
through joint type for upto 22kV 3C x
mm2 size XLPE cable as per DGVCL technical
Labour charge for excavation of 2100mm
long x 1200mm wide x 1200 mm deep joint
pits for installation of 11kV / 22kV Straight
through joints as per instruction of
engineer-in-charge & covering the cable
with 150 mm dia (Outer), thickness 25 mm,
1.0 meter long RCC half round muffs &
refilling same as per instruction of EIC .
Providing and fixing of insulating bus bar,
made from 11KV/22KV XLPE cable after
removal of semi conducting layer and
applying of PVC heat shrinkable anti-
tracking core insulating tubing (1.1KV), on
both end terminal using Aluminium long
barrel heavy duty up to 240 sq mm lugs,
Aluminium bus connector. Taping with PG-
clamp for bus conductor as per drawing and
as per instruction of EIC. The Alluminium
lugs and PG clamp shall be covered with
11KV/22KV HT insulating tapes.(11KV/22KV
XLPE cable will be in scope of DGVCL while
all other materials will be in bidder's scope)
Testing of cable at various points and
commissioning the feeder as per instruction
of engineer-in-charge.Test result shall be
submitted by contractor with bill.
Preparation and submission of 6 (six) copies,
of complete layout drawings with GIS
26 9925000026 mapping as per actual cable routing showing Set
road crossing, HDPE pipe sleeving, jointing
locations, markers etc.
Providing and fixing of Sign Board at junction
point Made out of 2 mm aluminium sheet
size 750x300 mm (2.5 x 1ft) rectangle, as per
design, pre treated with phosphate process
and acid etching coated with one coat of
epoxy primer and two coats of best quality
paints, refloctrorised with Hi-Intensity retro
– reflective sheeting as per the latest and
27 9925000027 frame fabricated from suitable size iron No.
angle. The Sign Board is to be fixed on the
base prepared from channel and bracing
angles which is grouted by means of cement
concreting of 1:2:4 for size of 300 mm dia x
800 mm height (500 mm to be grouted in
ground). The details to be displayed on sign
board will be given by In-charge Engineer.
(a) Hi intensity Micro prismatic Grade
Providing and fixing of Sign Board (Danger
Board) on Distribution Transformer Centers
Made out of 2mm aluminium sheet size
300x300mm (1x1ft) as per design, pre
treated with phosphate process and acid
etching coated with one coat of epoxy
primer and two coats of best quality paints,
refloctrorised with Hi-Intensity retro-
reflective sheeting as per the latest and
frame fabricated from suitable size iron
angle. The Sign Board (Danger Board is to be
fixed at the location as per instruction of In-
charge Engineer.
(a) Hi intensity Micro prismatic Grade
Providing & fixing of aluminium tag of size
250 mm (L) x 75 mm (W) from 3 mm
aluminium sheet along with 1.0 mm dia
aluminium binding wire for fixing of
aluminium tag near end termination joint at
DP structure for identifyng the cable. The
details of feeder i.e. 11 / 22 KV with feeder
name shound be punched on the tag by
letter punch of size 16 mm as per instruction
of In-charge Engineer.
Supply & fixing of heat shrink type end
terminations (outdoor) for 11kV 3C x
mm2 size XLPE cable as per DGVCL technical
Supply & fixing of heat & shrinkable end
terminations (outdoor) for 22 kV 3C x
mm2 size XLPE cable as per DGVCL technical
Supply & fixing of heat shrink type end
terminations (indoor) for 11kV 3C x
mm2 size XLPE cable as per DGVCL technical
Supply & fixing of heat & shrinkable end
terminations (indoor) for 22 kV 3C x
mm2 size XLPE cable as per DGVCL technical
Supply & fixing of heat shrinkable straight
through joint for 11kV 3C x 240 mm2 size
XLPE cableas per DGVCL technical
Supply & fixing of heat shrinkable straight
through joint type for 22kV 3C x 240 mm2
size XLPE cable as per DGVCL technical
Installation, Testing and commissioning of
11 KV,630 A SCADA Compatible, RRL type-
Way RMU including Two numbers of
earthings as per Drawing (material is in
bidder's scope) and as per DGVCL Technical
Installation, Testing and commissioning of
11 KV,630 A SCADA Compatible, RRLL type-
4 Way RMU including Two numbers of
earthings as per Drawing (material is in
bidder's scope) and as per DGVCL Technical
Installation, Testing and commissioning of
22KV,630 A SCADA Compatible, RRL type-3
Way, RMU including Two numbers of
earthings as per Drawing (material is in
bidder's scope) and as per DGVCL Technical
Installation, Testing and commissioning of
22KV,630 A SCADA Compatible, RRLL type-4
Way, RMU including Two numbers of
earthings as per Drawing (material is in
bidder's scope) and as per DGVCL Technical
Construction of plinth for 11KV, RRL type-
Way (i.e Two numbers of Isolator & One
number of Breaker) Ring Main Unit as per
DGVCL's technical specification mentioned
in drawing no: Drg. 11kv-01. All required
material will be supplied by contractor.
Construction of plinth for 11KV, RRLL type-
4 Way (i.e Two numbers of Isolator & Two
number of Breaker)Ring Main Unit as per
DGVCL's technical specification mentioned
in drawing no:Drg. 11kv-02.All required
material will be supplied by contractor.
Construction of plinth for 22KV, RRL type-
Way (i.e Two numbers of Isolator & One
number of Breaker) Ring Main Unit as per
DGVCL's technical specification mentioned
in drawing no: Drg. 22kv-01. All required
material will be supplied by contractor.
Construction of plinth for 22KV, RRLL type-
4 Way (i.e Two numbers of Isolator & Two
number of Breaker)Ring Main Unit as per
DGVCL's technical specification mentioned
in drawing no:Drg. 22kv-02.All required
material will be supplied by contractor.
Modifications e.g.Providing and fixing of
Terminal protectors i.e. Re-use able boot (HT
Side 11/22KV, LT Side 1.1KV) including 11/22
KV insulating taps and L.T.(1.1 KV) insulating
taps ,Busbar, Tapping from Bus Bar (11/22
KV XLPE cable) through P.G. Clamp for H.T.
Jumper to D.O. Fuse to bushings of
Transformer Center, providing & Fixing of
jumper and providing & fixing of Heat
Shrinkable Anti Tracking Core Insulating
Tubing (Insulation Level 11/22 KV) in H.T.
jumper , Clamping arrangement of cable
support frame on both side of existing Over
Head type Distribution Transformer to
utilize in Under Ground cable network as per
drawing & as per instruction of Engineer
incharge. All live parts i.e. PG-Clamp,
connections of D.O.fuses, HT bushings etc .
shall be covered with fixinng of 11/22 KV HT
insulating tapes. ( 11/22 KV XLPE cable will
be in scope of DGVCL while all other
materials will be in bidder's scope ) .
Laying of any size of 11/ 22 KV XLPE /PILC
45 9925000047 Per Cable Per Mtr
Cable in redaymade trench or in open space
Labour charges for Lying of O/H XLPE cable
Supply of 150 mm dia (Inner), thickness
mm, 1.0 meter long RCC half round pipe
Laying,Testing & commissioning of Specially
designed 11 KV 55 mm2
AAAC Medium Voltage Covered conductor as per
specifications (with accessories)
Laying,Testing & commissioning of Specially
designed 11 KV AL-59
ACS Medium Voltage Covered conductor as per the
specifications (with accessories)
CARTING OF PSC POLE AT SITE PER POLE
CARTING OF RSJ POLE AT SITE PER POLE
1.DGVCL will provide key material like M.S.
materials,ABC/Bare conductors,PSC/RSJ
Poles,Insulators,Fabricated materials etc.
to the contractor.2.All fabricated items shall
be fabricated as per DGVCL approved
drawing and by welding rods confirming to
the relevent ISI specification and as
directed by Engineer in charge.3.Necessary
electricity connection for fabrication items
shall be provided by DGVCL on payment of
required charge for connection & electricity
bill of the same shall be paid by the
agency.4.All the rates are inclusive of PF &
Exclusive of GST applicable time to time.5.All
steel material are to be painted as below:(a)
Scrubbing of rusted surface properly before
applying the paints on to the RSJ poles &
steel fabricated materials of RSJ/PSC poles
is must required.(b) Two coats of approved
ISI mark red oxide (primer) is to be properly
painted for the RSJ poles & steel fabricated
materials of RSJ/PSC poles. (c) Two coats of
approved ISI mark silver paint (i.e. triple
mangoes or equivalent quality silver paint) is
to be properly painted on to the RSJ poles &
steel fabricated materials of RSJ/PSC poles.
EXECUTIVE ENGINEERING (O&M)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
TENDER COPY E-29(2026-27).pdf
SCHEDULE B E-29(2026-27).pdf
TENDER NOTICE MASTER E-29.pdf
E NOTICE E-29.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].