| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.0 LAccepted-AOC KIZHUKKARAKKATTU HOUSE KOORACHUNDU KOZHIKODE 673527 | KOZHIKODE | KERALA | 673527 | L1 | Accepted-AOC Agreement executed | |
| 2 | L2₹39.1 L+₹2.2 L (5.88%)Rejected-Finance | L2 | Rejected-Finance Higher rate quated | |
| 3 | L3₹43.2 L+₹6.2 L (16.8%)Rejected-Finance | L3 | Rejected-Finance Higher rate quated | |
| 4 | L4₹48.0 L+₹11.0 L (29.9%)Rejected-Finance | L4 | Rejected-Finance Higher rate quated |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
22 Feb 2021, 4:00 pmClosed
Executive Engineer
Office of the Executive Engineer, PWD Roads Division, Kozhikode
Reconstruction of Damaged side protection wall at Km28/800 of Ekarool-Kakkayam-Damsite road
2021_PWD_415815_1
DB2/TN/84/2020-21
Open Tender
Civil Works - Roads
Item Rate
180 days
Balussery
.
8 documents required · 8 mandatory
₹2,760
Yes
₹50,000
Yes
21 Oct 2021
16 Feb 2021
24 Feb 2021
16 Feb 2021
22 Feb 2021
16 Feb 2021
Amount
CONSTRUCTION OF RETAINING WALL
3.13.1.B : Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.<br> Ordinary soil - Mechanical Means - (Depth upto 3 m) <br>Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)
2.3.1.B : Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness<br> In area of thorny jungle -By Manual Means<br>Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of thorny jungle -By Manual Means
3.13.4.A : Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work <br> Hard Rock ( blasting prohibited ) - Mechanical Means<br>Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work Hard Rock ( blasting prohibited ) - Mechanical Means
od24680/2020_2021 : Providng and fixing dowel bar with 16mm HYSD bars 2.00m length, 1.00m below ground and 1.00m above ground level on rock surface by drilling with air compressor 250cfk with 2 jack hammers, fixing the dowel bar in the borehole with cement slurry etc complete
12.4 : Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
13.5.E.P.1 : Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications<br> RCC Grade M20 - Using concrete Mixer - Height upto 5m <br>Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M20 - Using concrete Mixer - Height upto 5m
12.8.1.C : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> RCC Grade M20 - Using Concrete Mixer - (Without formwork) <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer - (Without formwork)
12.8.A.1 : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. <br> PCC Grade M15 <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
13.8 : Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V : 20H towards drawing foce.Complete as per drawing and Technical SpecificationsProviding weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V : 20H towards drawing foce.Complete as per drawing and Technical Specifications
15.5 : Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specificationProviding and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification
3.17 : Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.
12.40 : Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical SpecificationsSupply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
8.8 : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfacesPainting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces
C.Anilkumar
ANJANA CONSTRUCTIONS
JITHESH.M
Bidder Name
JITHESH.M
ANJANA CONSTRUCTIONS
C.Anilkumar
REJIJOSEPH K
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_590546.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .