| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 LAdmitted-Finance SEMRA MALMALA DHARMAPUR BAHRAICH | BAHRAICH | UTTAR PRADESH | 271801 | ₹3.8 L | L1 | Admitted-Finance |
| 2 | L2₹3.9 L+₹8,790.82 (2.32%)Admitted-Finance | ₹3.9 L+₹8,790.82 (2.32%) | L2 | Admitted-Finance |
| 3 | L3₹4.0 L+₹19,885.54 (5.25%)Admitted-Finance | ₹4.0 L+₹19,885.54 (5.25%) | L3 | Admitted-Finance |
| 4 | L4₹4.0 L+₹25,023.35 (6.60%)Admitted-Finance | ₹4.0 L+₹25,023.35 (6.60%) | L4 | Admitted-Finance |
| 5 | L5₹4.9 L+₹1.1 L (29.1%)Admitted-Finance | ₹4.9 L+₹1.1 L (29.1%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S MISHRI LAL CONTRACTOR L4 | Rajesh Pathak L3 | RAJ KUMAR SINGH CONTRACTOR L5 | M/s Shail Devi L1 | Shahbaz Khan L2 | SHREE CONSTRUCTION AND SUPLLIERS L6 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | R.C.C. 1:1.5:3 with 4.75 to 20 mm. size Kabrai stone grit and coarse sand FM not less than 2 including cost of all material, labour and T&P etc. but excluding GST | 29.49 | M3 | 8,696.21 ₹2,56,451.17 | 8,585.46 ₹2,53,185.22 | 10,619 ₹3,13,154.31 | 8,176.8 ₹2,41,133.83 Lowest | 8,363 ₹2,46,624.87 | 10,619 ₹3,13,154.31 |
| 2.00 | Steel Required for the RCC work including cost of cutting, Bending, binding, Placing and all material Labour and T&P etc. but excluding GST | 0.16 | MT | 77,294.2 ₹12,367.07 | 76,309.85 ₹12,209.58 | 93,746 ₹14,999.36 | 72,185 ₹11,549.6 Lowest | 73,826 ₹11,812.16 | 93,746 ₹14,999.36 |
| 3.00 | Brick work in 1:4 c.m. with cement ,coarse sand and first class brick including cost of all material;labour and t&p etc. Per M³ but excluding GST | 0.77 | M3 | 6,310.86 ₹4,859.36 | 6,230.49 ₹4,797.48 | 7,718 ₹5,942.86 | 5,943.25 ₹4,576.3 Lowest | 6,078 ₹4,680.06 | 7,718 ₹5,942.86 |
| 4.00 | 12 mm. thick cement plaster on brick masonary in 1:4 C.M. including cost of all materials, labours, Taxes, T&P etc. but excluding GST. but excluding GST | 2.17 | M2 | 223.83 ₹485.71 | 220.98 ₹479.53 | 272 ₹590.24 | 209.69 ₹455.03 Lowest | 214 ₹464.38 | 272 ₹590.24 |
| 5.00 | Distempering two coats of oil bound distemper with superior quality over one priming coat on surface after thoroughly burshing the surface Including cost of all material, labour and T & P etc but excluding GST | 1,502 | M2 | 85.75 ₹1,28,793.5 | 84.66 ₹1,27,159.32 | 102 ₹1,53,204 | 80.08 ₹1,20,280.16 Lowest | 82 ₹1,23,164 | 104 ₹1,56,208 |
| 6.00 | Painting two coat of synthetic enamel paint on new surface with superior quality approved make. Including cost of all material labour and t&p etc. Required for proper completion of work. but excluding GST | 3.96 | M2 | 97.29 ₹385.27 | 96.05 ₹380.36 | 118 ₹467.28 | 90.86 ₹359.81 Lowest | 93 ₹368.28 | 118 ₹467.28 |
| 7.00 | Writing letter above 80 mm. size including cost of all material, labour and T&P etc. complete. but excluding GST | 60 | Nos | 9.07 ₹544.2 | 8.95 ₹537 | 11 ₹660 | 8.47 ₹508.2 Lowest | 9 ₹540 | 11 ₹660 |
Tender Value
₹4.9 L
EMD Value
₹9,800
Closing Date
20 Aug 2026, 1:00 pmClosed
Executive Engineer
Office of the Executive Engineer, Saryu Nahar Khand-I Nanpara, Bahraich
RECOUPING OF PARAPET OF V.R.B. AT KM 10.570 OF SARYU LINK CHANNEL
2026_UPIDC_1176198_11
02/EE/2026-27
Open Tender
Civil Works - Canal
Item Rate
45 days
Nanpara
Plz refer Tender Documents
3 documents required · 3 mandatory
₹677
₹9,800
Yes
15 Sept 2026
12 Aug 2026
20 Aug 2026
12 Aug 2026
20 Aug 2026
12 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | R.C.C. 1:1.5:3 with 4.75 to 20 mm. size Kabrai stone grit and coarse sand FM not less than 2 including cost of all material, labour and T&P etc. but excluding GST | 29.49 | M3 | 10 | ₹294.9 |
| 2 | Steel Required for the RCC work including cost of cutting, Bending, binding, Placing and all material Labour and T&P etc. but excluding GST | 0.16 | MT | 10 | ₹1.6 |
| 3 | Brick work in 1:4 c.m. with cement ,coarse sand and first class brick including cost of all material;labour and t&p etc. Per M³ but excluding GST | 0.77 | M3 | 10 | ₹7.7 |
| 4 | 12 mm. thick cement plaster on brick masonary in 1:4 C.M. including cost of all materials, labours, Taxes, T&P etc. but excluding GST. but excluding GST | 2.17 | M2 | 10 | ₹21.7 |
| 5 | Distempering two coats of oil bound distemper with superior quality over one priming coat on surface after thoroughly burshing the surface Including cost of all material, labour and T & P etc but excluding GST | 1,502 | M2 | 10 | ₹15,020 |
| 6 | Painting two coat of synthetic enamel paint on new surface with superior quality approved make. Including cost of all material labour and t&p etc. Required for proper completion of work. but excluding GST | 3.96 | M2 | 10 | ₹39.6 |
| 7 | Writing letter above 80 mm. size including cost of all material, labour and T&P etc. complete. but excluding GST | 60 | Nos | 10 | ₹600 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
BOQ_2210538.xls
BOQ • 0.28 MB
Bid_Doc.pdf
Tender Documents • 1.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .