Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-AOC | ₹1.7 L Quoted ₹1.5 L | L1 | Accepted-AOC Awarded |
| 2 | L2₹1.7 L+₹15,759.57 (10.4%)Rejected-AOC 139 GOBIND NAGAR AMBALA CANTT | ₹1.7 L+₹15,759.57 (10.4%) | L2 | Rejected-AOC 2nd |
| 3 | L3₹1.7 L+₹17,113.78 (11.2%)Rejected-AOC | ₹1.7 L+₹17,113.78 (11.2%) | L3 | Rejected-AOC 3rd |
Tender Value
₹1.7 L
EMD Value
₹3,380
Closing Date
14 Jul 2026, 3:00 pmClosed
Kailash Chander Kala ravi kumar and Vivek Sharma
DIV Ambala
AMtc of EPHS in Sec 10 UE Ambala City Providing and fixing of PCC micro fiber factory made drain channel complete in all respect
2026_HBC_534328_1
202679CE0CE9 E1C4 4B34 93E0 0216544013B9239HSV
Open Tender
Civil Works
Works
30 days
Ambala City
2 documents required · 2 mandatory
₹250
₹3,380
Yes
30 Jul 2026
8 Jul 2026
15 Jul 2026
8 Jul 2026
14 Jul 2026
8 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [14.51.3]Hire charges for Hydraulic excavator/Loader like JCB/Pock lain, Hitachi etc with all accessories having bucket capacity 3. Hire Charges for excavator with over 0.75 cum bucket capacity | - | Per day | 9,276 | - |
| 2 | [5.23.2]Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 2. Nominal concrete 1:2:4 or leaner mix (i/c equivalent design mix) | - | cum | 460 | - |
| 3 | [6.1.1]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1. 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) | - | cum | 3,975 | - |
| 4 | [6.1.6]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | - | cum | 2,442 | - |
| 5 | Providing OCC Micro Fiber Factory made drain including carriage, loading ,unloading complete in all respect with the satisfaction of Engineer in charge . | - | Per Mtr | 1,064 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_613408.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .