Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 LAccepted-AOC BARDUBHI DHANBAD 828129 | DHANBAD | JHARKHAND | 828129 | ₹4.7 L Quoted ₹3.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹3.7 LRejected-AOC COAL INDIA LIMITED | ₹3.7 L | L2 | Rejected-AOC L2 |
| 3 | L3₹3.8 LRejected-AOC | ₹3.8 L | L3 | Rejected-AOC L3 |
Tender Value
₹3.5 L
EMD Value
₹4,433
Closing Date
30 Jan 2026, 5:00 pmClosed
S.K.Panja
Office of the Project Officer,WJ Area
Dismantling, Transporting of Endless Haulage from E9 TG/ between 4-6 dip to D-19 TG between 9-10 dip and installation XVI top seam moonidih colliery, W J Area
2026_BCCL_351511_1
BCCL/WJA/MND/SUR/2025-26/102
Open Tender
Miscellaneous Works
15 days
Moonidih Colliery, WJ Area
Please refer to NIT
11 documents required · 11 mandatory
₹4,433
22 Apr 2026
20 Jan 2026
31 Jan 2026
20 Jan 2026
30 Jan 2026
20 Jan 2026
Dismantling, Transporting of Endless Haulage from E9 TG/ between 4-6 dip to D-19 TG between 9-10 dip and installation XVI top seam moonidih colliery, W J Area
Dismantling of 1 endless haulage between 4th and 6th dip of E9 TG .analysis semi skilled Manshift required= 8 manshift X 2shift = 16manshift
Manual loading flat /arm trolly, transportation by track and haulage and unloading of all parts from E9 TG/ 4th- 6th dip to D19 TG between 9th and 10 rise ,including resistance box , base, gearbox ,clifton pulley, motor, ,analysis For base: 6 unskilled manshift x 3 shift= 18manshift . For resistance box: 6 unskilled Manshift x 3 shift=18 Manshift For clifton pulley: 6 unskilled Manshiftx 2shift=12 Manshift, for motor : 6 unskilled manshift x2 shift = 12manshift, For gearbox : 4 unskilled manshift x 2 shift : 8 manshift Total:18 + 18+ 12+12+ 8= 68 unskilled manshift
Loading at surface and transportation , unloading and laying of 22 mm rope, length 1500m ,Analysis Manshift required, 8 unskilledmanshift x 4shift= 32.
loading ,Transportation and unloading of Controller and GEB from surface to 9th Dip D19 TG . Analysis unskilled Manshift required= 4 unskilled manshift x 3 shift = 12 manshift.
loading ,transportation, unloading and layout of Lighting cables,& power cable, audio and signaling cable from E9 BG/4th dip rise to D19 TG /9th rise. Analysis 6 unskilled manshift x 4shift = 24 manshift required.
Cleaning & floor and side cutting/dressing in D19 tg/ between 9th -10 dip jn ,(a) cleaning 4 x3x0.30 = 3.60m³
(b)floor 4 x 3 x 0.40= 4.8m³
(c) side dressing = 8x2.9 x 0.40= 9.28m³
P.C.C Work 1:2:4 ( 1 Cement: 2 Course Sand Zone III : 4 grade stone aggregate 40mm normal size . 4 X3 X 0.4 (avg.)= 4.8 m³
Instalation of endless , manshift required 6skilled x 3 shift= 18
Add CP 15% as per clause 4.17.1 of Civil Eng. Manual & BCCL SOR
CMPF, Pension and admin. Charge of Employee Un Skilled
CMPF, Pension and admin. Charge of Employee SemiSkilled
CMPF, Pension and admin. Charge of Employee Skilled
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.63 MB
BOQ_364269.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid