Loading…
Loading…
Tender Value
₹87.1 L
EMD Value
₹87,098
Closing Date
6 Mar 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Chief Officer, Bilimora Nagar Palika, Bilimora, Dist. Navsari.
Day To Day Sweeping & Cleaning Of Various Areas And Urban Beautification Of Bilimora Nagarpalika
279389
33 of 2025-26
Open
Civil - All
Navsari
11 documents required · 11 mandatory
₹2,400
Chief Officer, Bilimora Nagar Palika, Bilimora
₹87,098
21 Feb 2026
21 Feb 2026
21 Feb 2026
6 Mar 2026
21 Feb 2026
NAME OF WORK : DAY TO DAY SWEEPING & CLEANING OF VARIOUS AREAS AND URBAN BEAUTIFICATION OF BILIMORA NAGARPALIKA.
Memorandum showing Items of Woks to be carried out
Item No. Quantities Item of Works Tendered Rates. Unit Total Amount According
Item No. Quantities Item of Works Tendered Rates. Unit Total Amount According
Estimated But In Figures In Words to estimated Quantity.
1 may be2More or 3 4 5 6
DAY TO DAY SWEEPING & CLEANING OF VARIOUS AREAS
1 364.00 Maintinaing Cleaninliness in city in which dirty from dust debris, garbage, wastes of ₹ 3,891.66 Rupees Three Thousand Day ₹
Vegetables & Major junction point, Garden, Residential Area, Religious Entry point, Eight Hundred
Public Transport stand, Lake, Traffic Island, etc.in city in which entry point, NinetyOne Paise SixtySix
juncition area,etc becomes dirty from dust debris, garbage, wastes, uprooting Only
vegetation, grass bushes, shrubs, saplingand trees girth upto 300mm etc to remove
and maintain them by manually
(B) Slum Areas of Bilimora & Market Areas
2 364.00 Maintinaing Cleaninliness in city in which dirty from dust debris, garbage, wastes of ₹ 3,346.26 Rupees Three Thousand Day ₹
Vegetables & Major junction point, Garden, Residential Area, Religious Entry point, Three Hundred FourtySix
Public Transport stand, Lake, Traffic Island, etc.in city in which entry point, Paise TwentySix Only
juncition area,etc becomes dirty from dust debris, garbage, wastes, uprooting
vegetation, grass bushes, shrubs, saplingand trees girth upto 300mm etc to remove
and maintain them by manually
(C) Roads of Bilimora
3 691.34 Maintaining Cleanliness of Main Roads in Cities in which Roads becomes dirty from ₹ 4,617.72 Rupees Four Thousand Km ₹
Dust, Debris, Garbage, Wastes, uprooting Vegetation, grass bushes, shrubs, sapling Six Hundred Seventeen
and trees girth up to 300 mm onside of roads – to remove & maintain them by Paise SeventyTwo Only
manually incase of Roads with (a) Single Lane with raised kerbs 3.50m road width
(Factor = 0.5) (b) 2-Lane with raised kerbs 7.00m road width(Factor = 1.0) (c) 4-
Lane with raised kerbs 14.00m road width (Factor = 1.5) (d) 6-Lane with raised
kerbs 21.00m road width (Factor = 2.0) (e) 8-Lane with raised kerbs 28.00m road
width(Factor = 2.5) incuding Both Side PAver Block inculding Pathways in Road
URBAN BEAUTIFICATION
(A) Beautification of Talav
4 1378.60 Removing and scraping of old deteriorated plaster of any thickness fromm wall / ₹ 20.06 Rupees Twenty Paise Six Sqm ₹
R.C.C member including stacking of serviceable material and disposal of Only
unserviceable from site of work with all lead and lift
5 1506.00 Scraping oil paint from steel and other metal surface and making the surface even ₹ 50.55 Rupees Fifty Paise Sqm ₹
(with Hand Scraping.) FiftyFive Only
6 1378.60 White washing with lime on wall surface (two coats) to give an even shade including ₹ 12.73 Rupees Twelve Paise Sqm ₹
thoroughly booming the surface to remove all dirt, dust; mortar drops and other SeventyThree Only
foreign matter.
7 1378.60 Finishing wall with weather proof exterior emulsion paint on wall surface (two ₹ 117.40 Rupees One Hundred Sqm ₹
coats) to give an required shape even shade after thoroughly brushing the surface Seventeen Paise Fourty
to remove all dirt, and remains of loose powdered materials.etc complete. Only
8 1721.00 Painting two coats (excluding priming coat) on new steel and other metal surface ₹ 66.94 Rupees SixtySix Paise Sqm ₹
with synthetic enamel paint, brushing to give an even shade including cleaning the NinetyFour Only
surface of all dirt, dust and other foreign matter.
9 14.88 Steel work, welded in built up sections framed workincluding cutting, hoisting, ₹ 9,108.48 Rupees Nine Thousand Q ₹
fixing in position and applying a priming coat of red lead paint. (A)In beams and One Hundred Eight Paise
joists, channels angles Tees, flats, with connecting plates or angle cleats as in main FourtyEight Only
and cross beams. Hip and jack rafters, purlins conneted to common rafters and the
(B) Beautification of Flyover
10 3552.12 Removing and scraping of old deteriorated plaster of any thickness fromm wall / ₹ 20.06 Rupees Twenty Paise Six Sqm ₹
R.C.C member including stacking of serviceable material and disposal of Only
unserviceable from site of work with all lead and lift
11 3552.12 White washing with lime on wall surface (two coats) to give an even shade including ₹ 12.73 Rupees Twelve Paise Sqm ₹
thoroughly booming the surface to remove all dirt, dust; mortar drops and other SeventyThree Only
foreign matter.
12 3552.12 Finishing wall with weather proof exterior emulsion paint on wall surface (two ₹ 117.40 Rupees One Hundred Sqm ₹
coats) to give an required shape even shade after thoroughly brushing the surface Seventeen Paise Fourty
to remove all dirt, and remains of loose powdered materials.etc complete. Only
(C) Beautification of Electric Poles
13 60.00 Supply of approved make frp/grp pole having followiing specifications :FRP/GRP ₹ 10,645.40 Rupees Ten Thousand Six Each ₹
pole made by centrifugal moulding process using thermoset resin polyester/epoxy Hundred FourtyFive
resin system having minimum glass content 45.0%.The pole should be in one Paise Fourty Only
pieceand tapered round in shape,having smooth outside surface finish and should
be totally fre from corrosion as well as non conductive and shock proof. Pole should
be provided with FRP/GRP base bracket dully fabricated from metal(M.S) and dully
claded with FRP/GRP material to avoid any metal exposer and painted with PU
paint. Pole should mechanical properties i.e 1. Specfic gravity (ASTM D 792) 1.3‐1.8
Kg/m3, 2. Glass Content % by weight (ASTM D 2584) 45.0 ‐55.0%, 3. Water
absorption (ASTM D 570) <0.5%, 4. Tensile Strength(ASTM D 638) 200+/‐50Mpa,
Flexural strength (ASTM D 790) 250+/‐50Mpa, 6. Compressive Strength (ASTM D 695)
200+/‐50MPa, 7. Yeild Strength(ASTM D638) 250 +/‐50MPa. Pole should be flame
retardant as per IS 6746.Resin used shall be UV resistance and pigmented. Pole
should be painted with first coat of epoxy primer and then two coat of highly
weather resistance polyurethen paint to ensure proper addhesion of the
paint.Minimum thickness shall be 80 to 100 micron.Defelection of the pole shall not
exceed more than 10.0 % of the length of the pole for the given load.Pole should be
generally made as per the dimensional data,performance criteria and some
interchagebility features of poles as per the standard ANSI C123.20 latest version of
ASTM D 923/01 including cable termination box with necessory accessories.The size
of pole and type of installation with foundation , Anchor Base & Internal junction
box as per the manufacturer details and site requirement .(3) 'B' class (Heavy Duty)
frp/grp pole suitable for base plate mounting [A]Overall Length of 3.0 meter,
Average thickness : 6mm, Top/Bottom Outside Dia. 76/126mm +/‐2. Weight of Pole
12.0 Kg approx. (Without base) Metal Anchor Base dully frp claded (Size : 260 Ø *
12mmthk , Mounting hole PCD 210mm * 4 nos. of 16 Ø hole).
14 60.00 Providing FRP/GRP arm bracket of having 15˚ arm with 50 mm OD pipe *5 mm ₹ 2,242.20 Rupees Two Thousand Each ₹
thk,1000mm long from pole centre (A) Single arm bracket Two Hundred FourtyTwo
Paise Twenty Only
15 60.00 Supplying and erecting C.I. pole base Suitable for following size of pole with ₹ 2,676.50 Rupees Two Thousand Each ₹
M.S.door having two hinges welded on M.S.flat 25 x 3 mm which is fitted on C.I. Six Hundred SeventySix
base by bolts welded inside the pole base erected with one coat of’ Red oxide and Paise Fifty Only
two coat of Aluminium paint and covering the gap between pole and pole base with
suitable clamp as per SOR drawing or sample.(A) Suitable for 90 mm.dia base of
16 60.00 Providing 1:2:4 cement concrete foundation & 70 % PCC from bottom including ₹ 953.44 Rupees Nine Hundred Each ₹
excavation for the pole of size 45 x 45 x 100 cm. Deep in below ground level with FiftyThree Paise
plinth of 45 cm x 45 cm (or 45 cm dia x 45 cm) high upper ground level with FourtyFour Only
necessary curing and finishing in approved manner.( for 4 & 6 mtr pole)
17 60.00 Supplying and erecting Water tight M.S.Box of size 20 x 15 x 15 cm. to erect ₹ 274.72 Rupees Two Hundred Each ₹
suitable kitkat fuse / MCB to be . erected on polished wooden board inside the box SeventyFour Paise
with hinged/sliding door with rubber rings and erected on pole with suitable pole SeventyTwo Only
clamp, all duly painted with one coat of red oxide and two coats of paints. (Cost of
Fuse / MCB shall be taken extra)
18 60.00 Supplying and erecting LED street light / Flood light fittings with High power White ₹ 5,896.38 Rupees Five Thousand Each ₹
LEDs wattage of 3 Watt and above assembled on single MCPCB, efficiency more than Eight Hundred NinetySix
130 lm/w and corrosion free High pressure die cast aluminum housing with smooth Paise ThirtyEight Only
finish powder coated and heat sink extruded aluminium with diffuser and
Polycarbonate optics/ lenses, with toughened glass with company mark/name
engraved or embossed 160 to 270 V,Power Factor more than 0.95, THD < 10 %, CCT
3000 K to 5700K,Uniformity ratio >0.45, Luminaire efficacy> 100 lumens/watt . LED
driver efficiency > 85 %.( fittings required LM-79 & LM-80 certificates)(NOTE: Below
description have shown ranges of Wattage capacity of LED fittings.The Engineer
incharge may select any wattage capacity between the ranges shown.)(A) Street
Light (IP-65), Surge protection -4KV integral and ,Light must have 440VAC line
supply with over-voltage protection. (ii) above 48 to 60 Watts Cat-lll
19 60.00 Providing & erecting 240 V MCB double pole switch for motor & inductive load (C ₹ 388.85 Rupees Three Hundred Each ₹
Curve) having 10 KA breaking capacity & confirms to IS : 8828 in existing box having EightyEight Paise
following capacity (B) 40 Amp. Cat.III EightyFive Only
20 290.00 Providing and erecting XLPE(IS:7098)(I)-88 ISI armoured cable multistrand ₹ 150.49 Rupees One Hundred RmT ₹
Aluminium conductor for 1.1 KV. to be laid on wall with necessary clamps or in Fifty Paise FourtyNine
existing trench / pipe of following size of cables. ARMOURED ALUMINIUM CABLES Only
(D) 3 core 10 Sq. mm 4-3-2
21 290.00 Providing & laying approved make Double walled corrugated pipes (DWC) of ₹ 160.59 Rupees One Hundred RmT ₹
polyethylene(conforming to IS 14930 II )with necessary connecting accessories of Sixty Paise FiftyNine
same material at required depth in existing trench for laying of cable. below Only
ground / road surface for enclosing cable (D)120 mm outer dia.
22 290.00 Making trench in soft soil of suitable width of 90 cm deep for laying cable or ₹ 54.54 Rupees FiftyFour Paise RmT ₹
locating the fault all over the run and back filling the same and making the surface FiftyFour Only
as normal ground.
23 42.00 Supplying and erecting LED street light / Flood light fittings with High power White ₹ 5,678.22 Rupees Five Thousand Each ₹
LEDs wattage of 3 Watt and above assembled on single MCPCB, efficiency more than Six Hundred
130 lm/w and corrosion free High pressure die cast aluminum housing with smooth SeventyEight Paise
finish powder coated and heat sink extruded aluminium with diffuser and TwentyTwo Only
Polycarbonate optics/ lenses, with toughened glass with company mark/name
engraved or embossed 160 to 270 V,Power Factor more than 0.95, THD < 10 %, CCT
3000 K to 5700K,Uniformity ratio >0.45, Luminaire efficacy> 100 lumens/watt . LED
driver efficiency > 85 %.( fittings required LM-79 & LM-80 certificates)(NOTE: Below
description have shown ranges of Wattage capacity of LED fittings.The Engineer
incharge may select any wattage capacity between the ranges shown.)(B) Flood
Light (IP-65), Surge protection -4KV integral and ,Light must have 440VAC line
supply with over-voltage protection.Cat-lll (i) above 20 to 30 watts
TOTAL Rs. (Round Off) ₹
Rupees EightySeven Lakh Nine Thousand Eight Hundred Thirty Only
I/ We am /are willing to carry out the work at ………….....………% above/below percent
above /below percent ( should be written in figures and words) of the estimated rates mentioned above.
Amount of tender works out as under.
*Estimate amount *Estimate amount
Put to tender Rs. Put to tender Rs. …
Deduct : % below / % Above Rs Add / Deduct :..: ……………..% above Rs………
Net. Total Rs………………..
In Words Rs. In Words………………………………………………
*( Please strike out whichever is not applicable)
Note-1:- All works shall be carried out as per Public Works Department, Hand Book & other specifications of Division or as directed.
Note-2:- All the columns in Schedule should be filled in digitally & the total of the entries in the last column should be struck by the contractor under his digitally
Note-3:- Rates quoted include clearance of the site (Prior commencement of work & at its close) in all respects & hold good for work under all conditions, site.
Note-4 The payment shall be made after availability fund. The contractor has no any claim in this regard.
Note-5 The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for which no extra payment shall be made.
Note-6 The labour cess will be deducted as per prevailing rules i.e.1% of the work done.
Note-7 GST and Income tax TDS will be deducted at a source while making payments of bills
Note-8 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.G.R.:PRC-10/2017 Cement Consumption/16/ C Date : 11/05/2017 as stated in S.O.R. therefore
in R.C.C. items where there is a change as per actual mix design the cost of difference of cement consumption have been deducted from the rate of original item at the rate of input rate mentioned in all
Note-9 The rates to be quoted by the contractor must be inclusive of all duties, taxes, and other levies Except GST payable by the contractor under the contract or for any other cause shall be included
in the rates, prices and total Bid Price submitted by the Bidder GST Payable Only On Item No. (1 To 12).
Signature of Bidder. Bilimora Nagarpalika
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
NIT.pdf
3.Annexue-1 BOQ.pdf
2.SBD.pdf
Download all tender documents and submit your bid