Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1 L
Closing Date
14 Feb 2022, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ex engineer rew ganderbal
ex engineer rew ganderbal
Construction of P/Bund near H/O Ali Mohd Khari and others at Pathribal Halqa Chatergul A Block Kangan
2022_RDPR_159731_6
enit225
Open Tender
Civil Works
Item Rate
30 days
rdd and pr
as per nit
2 documents required · 2 mandatory
₹100
Yes
ex engineer rew ganderbal
Exempted
15 Feb 2022
7 Feb 2022
15 Feb 2022
7 Feb 2022
14 Feb 2022
7 Feb 2022
120 days
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soils
Supply and laying of stone soling (hand packed ) in trenches of foundation including consolidation watering and ramming and all consequential and incidental costs like all leads,lifts,carriages but excluding head load by manual labour or by ponnies.
centering and shuttering including strutting,propping etc and removal of forms including all consequential and incidental costs like all leads,lifts,carriages and scaffolding etc complete job.
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) with 20% plum including all carriages
12mm cement plaster in 1:6 (1 cement: 6 fine sand)
Carriage of material by H/L of 350m (Sand / Coarse aggregates)
Photographs/Signboard.
RIYAZ AHMAD BADANA
abdul aziz
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .