Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAdmitted-Finance | ₹1.7 L | L1 | Admitted-Finance |
| 2 | L2₹1.9 LAdmitted-Finance | ₹1.9 L | L2 | Admitted-Finance |
| 3 | L3₹2.0 LAdmitted-Finance | ₹2.0 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Zakir Hussain L1 | DINA NATH L3 | NOOR HUSSAIN L2 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation trenches etc. in all kinds of earth work such as spade work, pick work, jumper work saturated/unsaturated soil blasting work and chiseling/wedging out of rocks where blasting work prohibited up to all depth and lifts including pumping and bailing out water where ever required stacking the excavated earth not more than 3mtrs.clear from the edge of excavation and then returning the stacked soil in 15cm.layers when required into the plinth sides of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated material within all leads and lifts. | 13.05 | Cum | 351 ₹4,580.55 | 340 ₹4,437 | 345 ₹4,502.25 |
| 2.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering All work up to plinth level:1:5:10 (1) cement: 5 coarse sand): 10 graded stone aggregate 40 mm nominal size in all leads and lifts. | 19.24 | Cum | 6,500 ₹1.3 L | 7,500 ₹1.4 L | 7,000 ₹1.3 L |
| 3.00 | Centering and shuttering including strutting, propping etc. and removal of form for all heights:
Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc in all leads and lifs. | 47.5 | Sqm. | 381 ₹18,097.50 | 415 ₹19,712.50 | 420 ₹19,950 |
| 4.00 | Stone/ Boulder filling behind the retaining wall and under floor with hard stone of apporved quality. | 11.61 | Cum | 2,200 ₹25,542 | 2,750 ₹31,927.50 | 2,650 ₹30,766.50 |
Tender Value
₹2.0 L
EMD Value
₹4,000
Closing Date
12 Dec 2025, 5:00 pmClosed
Executive Engineer
EE JSV Mandi
C/O Retaining wall to protect the Storage Tank 25000 Ltr Capacity
2025_HPIPH_122409_1
13826-925
Open Tender
Civil Works
90 days
Mandi
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
₹4,000
19 Dec 2025
3 Dec 2025
15 Dec 2025
3 Dec 2025
12 Dec 2025
3 Dec 2025
Amount
Excavation in foundation trenches etc. in all kinds of earth work such as spade work, pick work, jumper work saturated/unsaturated soil blasting work and chiseling/wedging out of rocks where blasting work prohibited up to all depth and lifts including pumping and bailing out water where ever required stacking the excavated earth not more than 3mtrs.clear from the edge of excavation and then returning the stacked soil in 15cm.layers when required into the plinth sides of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated material within all leads and lifts.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering All work up to plinth level:1:5:10 (1) cement: 5 coarse sand): 10 graded stone aggregate 40 mm nominal size in all leads and lifts.
Centering and shuttering including strutting, propping etc. and removal of form for all heights: Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc in all leads and lifs.
Stone/ Boulder filling behind the retaining wall and under floor with hard stone of apporved quality.
NOOR HUSSAIN (BID ID -591150)
DINA NATH (BID ID -591213)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
Form6.pdf
Tender Documents • 0.58 MB
Form8.pdf
Tender Documents • 1.24 MB
BOQ_179615.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid