Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹74.8 LAdmitted-Finance M 36 HOUSING UNIT MATHAIYANKUTTAI PO METTUR DAM 636452 | METTUR DAM | SALEM | TAMIL NADU | 636452 | ₹74.8 L | L1 | Admitted-Finance |
| 2 | L2₹89.0 LAdmitted-Finance 99B4 WEST MAIN ROAD CAUVERY NAGAR METTUR DAM 636 401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | ₹89.0 L | L2 | Admitted-Finance |
| 3 | L3₹89.0 LAdmitted-Finance 97G 4 1A PALAYAMKOTTAI ROAD WEST TUTICORIN 628 008 | TUTICORIN | TUTICORIN | TAMIL NADU | 628008 | ₹89.0 L | L3 | Admitted-Finance |
| 4 | L4₹91.7 LAdmitted-Finance TAMIL NADU N | KANCHIPURAM | TAMIL NADU | 600069 | ₹91.7 L | L4 | Admitted-Finance |
| 5 | L5₹97.1 LAdmitted-Finance | ₹97.1 L | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | INDUSTRIAL TOOLS AND SERVICES L3 | M/s. KSR Enterprises L10 | SREE RAGAVENDRA INDUSTRIAL ENGINEERS L15 | KAMATCHI INDUSTRIAL SERVICE L4 | Ramaganapathy Enterprises L5 | JOHNSON ENGINEERING ENTERPRISES L17 | MARSSAL ENTERPRISES L1 | Renga Engineering Works India Pvt Ltd L11 | SSRAJA ENGINEERING PRIVATE LIMITED L6 | Chennai Radha Engineering Works (P) Ltd. L12 | Gold Engineering Works L8 | ANBU ENGINEERING INDIA PRIVATE LIMITED L16 | ANNA RAJAN ENTERPRISES L9 | S B CONSTRUCTION CO L7 | VRK INFRASTRUCTURE L13 | ARASU CONTRACTOR L14 | G S SRINIVASA ENTERPRISES PRIVATE LIMITED L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Chemical Division: Charges of collection Of Sample from Cascade Aerator, Clarifier , preparation and dosing of ferric chloride, poly electrolyte, analysis arrangements, supporting of operation at Sea Water Pretreatment area for trouble Desalination process in shift duty and other allied works. | 262 | days | 3,93,000 ₹4,63,740 | 4,91,250 ₹5,79,675 | 4,88,630 ₹5,76,583.4 | 3,66,276 ₹4,32,205.68 | 3,80,162 ₹4,48,591.16 | 6,41,376 ₹7,56,823.68 | 5,28,192 ₹6,23,266.56 | 4,44,090 ₹5,24,026.2 | 3,90,406.2 ₹4,60,679.32 | 4,59,024 ₹5,41,648.32 | 4,29,418 ₹5,06,713.24 | 5,68,802 ₹6,71,186.36 | 4,45,138 ₹5,25,262.84 | 4,14,746 ₹4,89,400.28 | 4,93,608 ₹5,82,457.44 | 10,21,800 ₹12,05,724 | 3,46,364 ₹4,08,709.52 Lowest |
| 2.00 | Confirmation of Valve Operation along with PLC of DMF (7 Nos.), Basket Strainer, Cartridge Filter, Ultra Filtration (4 Nos) and Sea Water Reverse Osmosis System (3 Nos) and collection of samples from various locations for analysis, Preparation and Dosing of SMBS, Anti scalent, HCL, for SWRO System, CaCl2, NaHCO3 for maintain LSI parameters at Desalination Plant. | 262 | days | 7,07,400 ₹8,34,732 | 10,23,437.5 ₹12,07,656.25 | 10,17,870 ₹12,01,086.6 | 7,62,944 ₹9,00,273.92 | 7,92,026 ₹9,34,590.68 | 12,82,752 ₹15,13,647.36 | 8,80,320 ₹10,38,777.6 | 9,26,170 ₹10,92,880.6 | 8,13,667.2 ₹9,60,127.3 | 9,56,300 ₹11,28,434 | 8,94,730 ₹10,55,781.4 | 11,85,026 ₹13,98,330.68 | 9,28,790 ₹10,95,972.2 | 8,63,814 ₹10,19,300.52 | 10,28,350 ₹12,13,453 | 6,81,200 ₹8,03,816 Lowest | 7,21,810 ₹8,51,735.8 |
| 3.00 | Service Water, Potable Water System – Lime Softening bed, CO2 injection, operation along with PLC and Collection Of Sample for analysis and other allied works. | 262 | days | 3,14,400 ₹3,70,992 | 4,91,250 ₹5,79,675 | 4,88,630 ₹5,76,583.4 | 3,66,276 ₹4,32,205.68 | 3,80,162 ₹4,48,591.16 | 6,41,376 ₹7,56,823.68 | 1,76,064 ₹2,07,755.52 Lowest | 4,44,090 ₹5,24,026.2 | 3,90,406.2 ₹4,60,679.32 | 4,59,024 ₹5,41,648.32 | 4,29,418 ₹5,06,713.24 | 5,68,802 ₹6,71,186.36 | 4,45,138 ₹5,25,262.84 | 4,14,746 ₹4,89,400.28 | 4,93,608 ₹5,82,457.44 | 6,81,200 ₹8,03,816 | 3,46,364 ₹4,08,709.52 |
| 4.00 | Assisting to Chemist in all field analysis at Ultra Filtration, Sea Water Reverse Osmosis System to finding the values Conductivity, TDS, Suspended solids, Turbidity, SDI, Free chlorine at various sampling points and strength of dosing chemicals such as SMBS, Antiscalent, HCL, CaCl2, NaHCo3 and LSI parameters and other allied works. | 262 | days | 11,79,000 ₹13,91,220 | 13,10,000 ₹15,45,800 | 20,17,400 ₹23,80,532 | 11,79,000 ₹13,91,220 | 12,58,648 ₹14,85,204.64 | 19,16,006 ₹22,60,887.08 | 8,80,320 ₹10,38,777.6 | 14,71,130 ₹17,35,933.4 | 12,93,756 ₹15,26,632.08 | 15,20,124 ₹17,93,746.32 | 14,22,136 ₹16,78,120.48 | 19,21,770 ₹22,67,688.6 | 13,87,290 ₹16,37,002.2 | 13,73,142 ₹16,20,307.56 | 15,55,625 ₹18,35,637.5 | 6,81,200 ₹8,03,816 Lowest | 11,47,560 ₹13,54,120.8 |
| 5.00 | Charges of collection & preparation of Coal Samples from Bunker & Shipment in shift duty and Cleaning of the waste coal samples at Coal sampling room and Laboratory | 262 | days | 3,93,000 ₹4,63,740 | 4,91,250 ₹5,79,675 | 4,88,630 ₹5,76,583.4 | 3,66,276 ₹4,32,205.68 Lowest | 3,80,162 ₹4,48,591.16 | 6,41,376 ₹7,56,823.68 | 5,28,192 ₹6,23,266.56 | 4,44,090 ₹5,24,026.2 | 3,90,406.2 ₹4,60,679.32 | 4,59,024 ₹5,41,648.32 | 4,29,418 ₹5,06,713.24 | 5,68,802 ₹6,71,186.36 | 4,45,138 ₹5,25,262.84 | 4,14,746 ₹4,89,400.28 | 4,93,608 ₹5,82,457.44 | 6,81,200 ₹8,03,816 | 3,73,088 ₹4,40,243.84 |
| 6.00 | Charges of Collection of pulverized coal samples from the Mill of Running Units, Collection of Bottom Ash & Fly Ash samples of Running Units and other allied works. | 262 | days | 3,93,000 ₹4,63,740 | 4,91,250 ₹5,79,675 | 4,88,630 ₹5,76,583.4 | 3,66,276 ₹4,32,205.68 | 3,80,162 ₹4,48,591.16 | 6,41,376 ₹7,56,823.68 | 1,76,064 ₹2,07,755.52 Lowest | 4,44,090 ₹5,24,026.2 | 3,90,406.2 ₹4,60,679.32 | 4,59,024 ₹5,41,648.32 | 4,29,418 ₹5,06,713.24 | 5,68,802 ₹6,71,186.36 | 4,45,138 ₹5,25,262.84 | 4,14,746 ₹4,89,400.28 | 4,93,608 ₹5,82,457.44 | 6,81,200 ₹8,03,816 | 3,73,088 ₹4,40,243.84 |
| 7.00 | Charges of collection of MOT Oil, Mill Gear Box Oil, BFP Oil, ID, FD Oil, Furnace Oil, HSD and Transformer oil samples and other allied works. | 262 | days | 2,35,800 ₹2,78,244 | 3,27,500 ₹3,86,450 | 3,24,880 ₹3,83,358.4 | 2,44,184 ₹2,88,137.12 | 2,53,616 ₹2,99,266.88 | 4,27,584 ₹5,04,549.12 | 1,76,064 ₹2,07,755.52 Lowest | 2,96,060 ₹3,49,350.8 | 2,60,244.6 ₹3,07,088.63 | 3,06,016 ₹3,61,098.88 | 2,86,366 ₹3,37,911.88 | 3,79,114 ₹4,47,354.52 | 2,97,370 ₹3,50,896.6 | 2,76,410 ₹3,26,163.8 | 3,29,072 ₹3,88,304.96 | 6,81,200 ₹8,03,816 | 2,31,084 ₹2,72,679.12 |
| 8.00 | Charges for testing of Bunker Coal Samples from running units & Coal Samples collected from Shipment and other allied works at Laboratory. | 262 | days | 4,19,200 ₹4,94,656 | 4,19,200 ₹4,94,656 | 6,68,100 ₹7,88,358 | 3,77,280 ₹4,45,190.4 | 4,02,694 ₹4,75,178.92 | 6,13,080 ₹7,23,434.4 | 1,76,064 ₹2,07,755.52 Lowest | 4,70,290 ₹5,54,942.2 | 4,13,750.4 ₹4,88,225.47 | 4,86,272 ₹5,73,800.96 | 4,55,094 ₹5,37,010.92 | 6,14,914 ₹7,25,598.52 | 4,44,090 ₹5,24,026.2 | 4,39,374 ₹5,18,461.32 | 4,97,800 ₹5,87,404 | 6,81,200 ₹8,03,816 | 3,67,062 ₹4,33,133.16 |
| 9.00 | Charges for testing work related to sieve analysis of Pulverized Coal Samples collected from running mill of any one of units & Testing of Bottom Ash & Fly Ash Samples collected from the running units and other allied works at Laboratory. | 262 | days | 1,83,400 ₹2,16,412 | 2,41,040 ₹2,84,427.2 | 3,83,830 ₹4,52,919.4 | 2,16,936 ₹2,55,984.48 | 2,31,608 ₹2,73,297.44 | 3,06,540 ₹3,61,717.2 | 1,76,064 ₹2,07,755.52 Lowest | 2,70,646 ₹3,19,362.28 | 2,38,079.4 ₹2,80,933.69 | 2,79,554 ₹3,29,873.72 | 2,61,738 ₹3,08,850.84 | 3,53,438 ₹4,17,056.84 | 2,55,450 ₹3,01,431 | 2,52,568 ₹2,98,030.24 | 2,86,235 ₹3,37,757.3 | 6,81,200 ₹8,03,816 | 2,11,172 ₹2,49,182.96 |
| 10.00 | Charges for testing work related to MOT oil from the running units, Mill Gear Box oil, BFP oil, ID, FD, Furnace oil, HSD and Transformer oil and other allied works at Laboratory. | 262 | days | 2,35,800 ₹2,78,244 | 2,09,600 ₹2,47,328 | 3,34,050 ₹3,94,179 | 1,88,640 ₹2,22,595.2 | 2,01,478 ₹2,37,744.04 | 3,06,540 ₹3,61,717.2 | 1,76,064 ₹2,07,755.52 Lowest | 2,35,276 ₹2,77,625.68 | 2,07,000.96 ₹2,44,261.13 | 2,43,136 ₹2,86,900.48 | 2,27,416 ₹2,68,350.88 | 3,07,326 ₹3,62,644.68 | 2,21,914 ₹2,61,858.52 | 2,19,556 ₹2,59,076.08 | 2,48,900 ₹2,93,702 | 6,81,200 ₹8,03,816 | 1,83,662 ₹2,16,721.16 |
Tender Value
Refer Docs
EMD Value
₹1.3 L
Closing Date
16 Jul 2026, 2:00 pmClosed
Office of the Chief Engineer/Udangudi STPP-I
CHIEF ENGINEER, USTPP-I, UDANGUDI.
Chemical Division Deputy Chief Chemist Time bound works in various operation locations instrument and equipment operation Condensate Polishing Unit,Regeneration system, Boiler Steam and Water Analysis system, Sea Water Condenser cooling water
2026_EB_683427_1
CE/SE/O/USTPP-I/OT.NO.02/26-27
Open Tender
Miscellaneous Services
Works
262 days
Office of the Chief Engineer/Udangudi STPP-I
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1.3 L
Yes
21 Aug 2026
1 Jul 2026
17 Jul 2026
1 Jul 2026
16 Jul 2026
1 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Chemical Division: Charges of collection Of Sample from Cascade Aerator, Clarifier , preparation and dosing of ferric chloride, poly electrolyte, analysis arrangements, supporting of operation at Sea Water Pretreatment area for trouble Desalination process in shift duty and other allied works. | 262 | days | - | - |
| 2 | Confirmation of Valve Operation along with PLC of DMF (7 Nos.), Basket Strainer, Cartridge Filter, Ultra Filtration (4 Nos) and Sea Water Reverse Osmosis System (3 Nos) and collection of samples from various locations for analysis, Preparation and Dosing of SMBS, Anti scalent, HCL, for SWRO System, CaCl2, NaHCO3 for maintain LSI parameters at Desalination Plant. | 262 | days | - | - |
| 3 | Service Water, Potable Water System – Lime Softening bed, CO2 injection, operation along with PLC and Collection Of Sample for analysis and other allied works. | 262 | days | - | - |
| 4 | Assisting to Chemist in all field analysis at Ultra Filtration, Sea Water Reverse Osmosis System to finding the values Conductivity, TDS, Suspended solids, Turbidity, SDI, Free chlorine at various sampling points and strength of dosing chemicals such as SMBS, Antiscalent, HCL, CaCl2, NaHCo3 and LSI parameters and other allied works. | 262 | days | - | - |
| 5 | Charges of collection & preparation of Coal Samples from Bunker & Shipment in shift duty and Cleaning of the waste coal samples at Coal sampling room and Laboratory | 262 | days | - | - |
| 6 | Charges of Collection of pulverized coal samples from the Mill of Running Units, Collection of Bottom Ash & Fly Ash samples of Running Units and other allied works. | 262 | days | - | - |
| 7 | Charges of collection of MOT Oil, Mill Gear Box Oil, BFP Oil, ID, FD Oil, Furnace Oil, HSD and Transformer oil samples and other allied works. | 262 | days | - | - |
| 8 | Charges for testing of Bunker Coal Samples from running units & Coal Samples collected from Shipment and other allied works at Laboratory. | 262 | days | - | - |
| 9 | Charges for testing work related to sieve analysis of Pulverized Coal Samples collected from running mill of any one of units & Testing of Bottom Ash & Fly Ash Samples collected from the running units and other allied works at Laboratory. | 262 | days | - | - |
| 10 | Charges for testing work related to MOT oil from the running units, Mill Gear Box oil, BFP oil, ID, FD, Furnace oil, HSD and Transformer oil and other allied works at Laboratory. | 262 | days | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.18 MB
Specdccc.pdf
Tender Documents • 0.89 MB
BOQ_821496.xls
BOQ • 0.29 MB
chem.pdf
PDF • 0.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].