Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.1 LAccepted-AOC UTTAR PRADESH | L1 | Accepted-AOC lowest rate | |
| 2 | L2₹21.1 L+₹2,329.03 (0.11%)Rejected-Finance | L2 | Rejected-Finance High rate | |
| 3 | L3₹21.1 L+₹4,869.79 (0.23%)Rejected-Finance | L3 | Rejected-Finance High rate |
Tender Value
₹21.2 L
EMD Value
₹2.1 L
Closing Date
8 May 2026, 2:00 pmClosed
Rajeev mohan saxena
Office Excutive officer Npp Pt. DDU Nagar chandau
Wd No.8 Pathara bhag-1 me mg aata chakkii PWD road se suraj gond se pawan karn om praksh ke makan tak mitti bharai v nali ka nirma karya
2026_DOLBU_1136939_1
Letter No.317/NPP/Pt. DDU Nagar/2026-27 Date 13.04.2026
Open Tender
Civil Works
Fixed-rate
30 days
Chandauli
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,200
Office Excutive officer Npp Pt. DDU Nagar chandau
₹2.1 L
14 Jun 2026
16 Apr 2026
8 May 2026
16 Apr 2026
8 May 2026
16 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/W excavtion in foundation at site with all compt work. | - | Cum | - | - |
| 2 | E/W in cutting with cartage up 8 Km distance all compt work. | - | Cum | - | - |
| 3 | PCC in 1:6:12 at side with B/B and sand with all compt work etc. | 1 | Cum | - | - |
| 4 | M-150 brick work in 1:4 cement and sand of 1.25 FM mortar in foundation and plinth including supply of all materials, labour and tools and plants etc. required for proper completion of work SI 305. | - | Cum | - | - |
| 5 | PCC 1:2:4 cement. Sand and 20mm stone grit bringing it to proper camber and including supply all materials, labor, T&P with all compt. work | 1 | Cum | - | - |
| 6 | 12mm thick plaster with cement & fine sand of 1.25 F.M. mortar in 1:4 including supply of all materials labour and T&P etc. required for proper completion of work SI no-584 | - | SQm | - | - |
| 7 | Cost of reinforced cement concrete in the propotion 1: 2:4 excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B. W.G.G.I. binding wire including the cost of binding wire, moulds and all other materials, labour and T & P etc. required for proper complection of the work. SOR 284 | - | Cum | - | - |
| 8 | Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications | 1 | Qtl | - | - |
| 9 | Supply and fixing of inauguration board at side with all compt. Work. | - | Nos | - | - |
| 10 | Add GST 18% of above cost etc. | - | Job | 0.58 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.60 MB
T1.pdf
Tender Documents • 1.58 MB
BOQ_2123058.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .