| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAccepted-AOC | ₹2.1 Cr | L1 | Accepted-AOC Lowest rate quoted |
| 2 | L2₹2.9 Cr+₹83.1 L (40.5%)Rejected-Finance | ₹2.9 Cr+₹83.1 L (40.5%) | L2 | Rejected-Finance High Rate quoted |
| 3 | Rejected-Technical | - | - | Rejected-Technical Technically Not Qualified |
Tender Value
₹2.0 Cr
EMD Value
₹2.7 L
Closing Date
17 Feb 2025, 5:00 pmClosed
Chief Engineer Project Pushpak
HQ CE (P) Pushpak, CO 99 APO, Zemabawk, Aizawl Mizoram
PDG AND LYG OF HMP READY MIX BC 30 MM TH INCL CLEANING RD SURFACE APPLYING TACK COAT, CORRECTION WKS WITH BM 75 MM FOR RE-SURF WKS ON VARIOUS LOC KM 0.00 TO KM 7.780 (NET LENGTH 7.780 KM) ON T-B-S-P-S RD UNDER 74 RCC PROJECT PSK IN MIZORAM STATE
2025_BRO_695042_1
NIT-03 of 2025-26
Open Tender
Civil Works - Roads
Item Rate
180 days
KM 0.00 TO KM 7.780 ON T-B-S-P-S RD
As per Tender Documents
8 documents required · 8 mandatory
₹0
₹2.7 L
Yes
HQ CE (P) Pushpak, CO 99 APO, Zemabawk, Aizawl
13 May 2025
27 Jan 2025
18 Feb 2025
28 Jan 2025
17 Feb 2025
8 Feb 2025
29 Jan 2025 - 7 Feb 2025
3 Feb 2025
Amount
Re-Surfacing work on various locations between Km 0.00 to Km 7.780 (Net length 7.780 Km) on Thingsai-Bualpui-Saisah-Pankhua-Sangau road
Providing and laying of HMP ready mix Bituminous Concrete (BC) 30 mm thick compacted with bitumen VG-30 as per clause 507 of MoRT&H Specifications (Fifth revision) for road and bridge work , tack coat as per clause 503 of MoRT&H Specifications (Fifth revision) on the existing BT surface, correction work with BM 75 mm thick compacted as per clause No 504 of MoRT&H Specifications (Fifth revision) including Prime Coat as per clause 502 of MoRT&H Specifications (Fifth revision ) duly maintaining the road profile with paver finisher and rolled as per clause 501.6 and 501.7 of MoRT&H Specifications (fifth revision) to achieve desired compaction including all labourers, materials and machinery as specified and directed by Engg-In-Charge. Note: 1. The specification given in clause 3004.2 of MoRT&H Specifications (Fifth revision) will be complied while carrying out correction work. 2. The maximum area of correction work with BM 75 mm thick compacted will be 10% of the cost of BC 30 mm.
S S INFRASTRUCTURE (BID ID -3241463)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .