| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.2 LAccepted-AOC R O PRIMTA NIWAS GAHAN SANJAULI SHIMLA 171006 | SHIMLA | HIMACHAL PRADESH | 171006 | L1 | Accepted-AOC Awarded | |
| 2 | L2₹9.6 L+₹1.3 L (15.9%)Rejected-Finance | L2 | Rejected-Finance Rejected | |
| 3 | L3₹10.5 L+₹2.1 L (25.8%)Rejected-Finance VILLAGE BANDLI PO KANDO BHATNOL TEHSIL SHILLAI DISTRICT SIRMOUR HP | BANDLI | SIRMOUR | HIMACHAL PRADESH | L3 | Rejected-Finance Rejected | |
| 4 | L4₹11.4 L+₹3.1 L (37.3%)Rejected-Finance BELOW SLAUGHTER HOUSE KRISHNA NAGER SHIMLA | SHIMLA | SHIMLA | HIMACHAL PRADESH | L4 | Rejected-Finance Rejected | |
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹7.3 L
EMD Value
₹14,542
Closing Date
6 Jun 2023, 5:00 pmClosed
Executive Engineer Jal Shakti Division Shillai
Executive Engineer Jal Shakti Division Shillai
L J of GI Pipe for G-Main 80 mm dia from Suinal tank to Kandhara Tank and CO Storage Tank 45000 Ltrs Cap at Kandhara
2023_HPIPH_73950_1
SHL-SMR03-780-JSV DIV-SHILLAI-1047-1107 Dt26.05.23
Open Tender
Civil Works
Item Rate
90 days
Shillai
Please refer Tender documents.
8 documents required · 8 mandatory
₹250
Executive Engineer Jal Shakti Division Shillai
₹14,542
Yes
5 Jul 2023
26 May 2023
7 Jun 2023
26 May 2023
6 Jun 2023
26 May 2023
Amount
Excavation in drain and channels etc. in earth work in all kinds of soil such as kankar Moorum,Shingles,Conglomerate saturated soil decomposed or soft rock & hard rock by blasting/ chiselling(where blasting is prohibited) including dressing of sides and beds, with all leads and lifts . The disposed earth to be levelled and neatly disposing of excavated earth dressed and returning the stacked soil in to foundation and trnches etc. including ramming and watering and than consolidating the same where ever required within all leads and lifts including jungle clearance and as per direction of the direction of the Engineer-in-Charge.
Laying, testing & commissioning at site in trenches bevelled ended GI pipes of various grades conforming to IS/ ISO 1239latest with upto date amendements having wall thickness and per Rmt weight as mentioned below & capable of withstanding required test pressure as prescribed in BIS code, in random lengths of 5.5 to 6.5 mtr. The pipes ends shall be bevelled suitable for butt welding including the cost of jointing with butt welding conforming to IS 816-1969 or latest as applicable ends with upto date amendments (leak proof) in three layers at site of work with welding rods of standard make and all allied accessories whatever required for welding at site, tail pieces, tees, bends and other specials manufactured from parent pipes as applicable to the particular reach & of approved specification as per site conditions and cutting of pipes wherever required as per site requirement including carriage in all leads and lifts and as directed by Engineer-in-charge. The pipe shall haves zinc coating inside & out side conforming to IS-4736-1986 or latest with upto date amendments. The laying shall conform to BIS 5822-1970 or latest with upto date amendments to the entire satisfaction of Engineer-in-charge (Earth work shall be measured and paid for separately).
DIA RD TO RD WALL THICKNESS F.T. GRADE
80MM 0 600 3.20 GI(L)
Providing welding and fixing M.S plate flanges of following dia (nominal bore) of following flanges Table conforming to IS 6392-1971 or latest with upto date amendments to MSERW/G.I. pipe after every 100 metres or as per site requirement including cutting of pipes wherever required welding in three layers (leak proof) conforming to specifications as prescribed in relevent IS code i.e IS 816-1969 or latest as applicable with upto date amendments with nuts, bolts & washers and specials etc. fonforming to IS 1963 or latest with upto date amendments including packing sheet i.e. asbestos fibre sheet minimum 3mm thick and painting with anticrossive paints complete in all respect in all leads lifts and carriage of material at site and as directed by the Engineer-in-charge.
DIA RD TO RD F.T.
Providing and fixing peet valve with wheel of superior quality of the following dia metres complete in all leads,lifts and carriage of material at site and as directed by the Engineer Incharge.
DIA RD TO RD F.T.
Excavation in foundations,trenches etc., in earth work, lift upto 1.50 mts. Stacking the excavated soil not more than 3 mts. Clear from the edge of the excavation & then returning the stacked soil in 15 cms. Layers,when required into plinths sides of foundation etc.,consolidating each deposited layers by ramming & watering & then disposing of all surplus excavated earth as dierected within all leads & lifts as per entire satisfaction of Engineer in charge.
Providing & laying cement concrete 1:3:6 (1cement : 3 sand : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centring & shuttering in Foundation & plinth.
Providing & laying cement concrete1:1.5:3 (1cement :1.5 sand : 3 graded stone aggregate 20 mm nominal size) & curing complete excluding the cost of form work & reinforcement for reinforced concrete work in :-
Foundation,footing,bases of columns and the like & mass concrete.
Wall (any thickness but not less than 0.10 mts.Thickness)attached pillasters,buttresses plinth,& string courses etc.from top of found.level upto floor two level
Prov.form work with steel plates 3.15 mm thick welded with angle iron in frame 30x30x5mm,so as to give a fair finish i/c centring shuttering,strutting & propping etc. with wooden battens & ballies,ht. of propping & centring below supporting floor to ceiling not exceeding 4.00 mts. & removal of the same for in situ-reinforced concrete & plain concrete work :-
Vertical surfaces such as wall (any thick.) partitions & the like i/c attached pillasters,buttresses,plinth & string courses & the like.
Prov.form work of ordinary timber plankings so as to give a rough finish i/c centring, shuttering,strutting & propping etc. ht.of propping & centring below supporting floor to ceiling not exceeding 4 mts. & removal of the same for insitu-reinforced concrete & plain concrete work in :-
Arches beyond 6.00 mts.span
Prov.in RCC work smooth finishing of 6mm cement plaster the exposed surface with cement mortor1:3(1cement :3 sand
Providing & laying cement concrete 1:1.5:3 (1cement :1.5 sand : 3 graded stone aggregate 20 mm nominal size) & curing complete excluding the cost of form work & reinforcement for RCC work in :-
Suspended floor,roofs,landing & shelves & their support balconies,beams,girders,bressumers & cantilever upto floor level.
Providing Tor steel reinforcement for RCC work i/c bending,binding & placing complete upto floor two level.
Steel work welded in built up sections,trusses & framed work i/c cutting,hoisting & fixing in position & applying a priming coatof red paint :- In grating, framed ,guards,bars, ladders,railing,brackets & similar works.
Laying in trenches GMS/MS Tubes (L/M class) tube fitting (Earth work in trenches to be measured & paid for separately)
Prov. & fixing SFRC Man hole cover with frame having frames size of 560 mm internal dia.should not be less than 100 kg
LAYAK RAM
CHATTER SINGH
SUNIL KUMAR
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .