| 1 | L1₹3.6 LAccepted-AOC | L1 | Accepted-AOC First lowest | |
| 2 | L2₹3.9 L+₹31,491.51 (8.70%)Rejected-AOC | L2 | Rejected-AOC Second Lowest |
Tender Value
₹4.5 L
EMD Value
₹11,217
Closing Date
24 Dec 2022, 6:00 pmClosed
Sreekumar.K
Office of the Assistant Executive Engineer ,MI Subdivision,Shoranur
GENERAL-Annual maintenance 2022-23 -of LIS Karalmanna, Cherpulassery municipality, Palakkad district-General Civil Work
2022_Irrig_540143_1
IRR/IA/TR/2657/2022_5_1_1/1
Open Tender
Civil Works - Lift Irrigation Schemes
Item Rate
180 days
Cherpulassery municipality
please refer tender documents
8 documents required · 8 mandatory
₹990
₹11,217
17 Jan 2023
17 Dec 2022
29 Dec 2022
17 Dec 2022
24 Dec 2022
17 Dec 2022
17 Dec 2022 - 22 Dec 2022
Amount
Maintenance of LIS Karalmanna
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
22.6:Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying : a) after surface preparation, first layer of slurry of cement @ 0.488 kg/ sqm mixed with water proofing cement compound @ 0.253 kg/ sqm. laying second layer of fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm. c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/ sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30 cm on parapet wall and tucked into groove in parapet all around. d) fourth and final layer of brick tilling with cement mortar (which will be paid for separately. For the purpose of measurement the entire treated surface will be measured)
22.14.1:Grading roof for water proofing treatment with:Cement concrete 1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
OD23027/2022-2023:supplying and fixing 150mm NRV (DPF5312/part10 (heavy type) near pump set cost and conveyance of all materials
OD23028/2022-2023:Making pipe joints with rubber beading packing and cotton thread socked in cement paste including all cost, conveyance of all materials, labour charges, watering, curing etc complete
OD23050/2022-2023:Engaging man mazdoor DLR labour for removing weeds and other obstruction (blocking materials, debris, fallen down trees etc.) clearing the blocked culverts, dosing leakage of water through shutter portion water distribution etc. complete
IBRAHIM.P.M.
Bidder Name
Abdul Sathar
IBRAHIM.P.M.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_786762.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .