| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 CrAccepted-AOC | ₹3.2 Cr | L1 | Accepted-AOC Quoted L1 rate |
| 2 | L2₹3.3 CrRejected-AOC | ₹3.3 Cr | L2 | Rejected-AOC Quoted L2 rate |
Tender Value
₹3.1 Cr
EMD Value
₹6.2 L
Closing Date
18 Jul 2024, 3:00 pmClosed
Project Director
DRDA Tiruchirappalli
Upgradation of 1 road in Thottiyam Block in Tiruchirappalli District under PMGSY III Batch I 2023-24 including maintenance of 5 years Package No.TN22200.
2024_RDTN_133951_1
TN22200
Open Tender
Civil Works - Roads
270 days
Tiruchirappalli
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹6.2 L
DRDA Tiruchirappalli
4 Sept 2024
16 May 2024
18 Jul 2024
16 May 2024
18 Jul 2024
16 May 2024
28 May 2024
Amount
Upgradation of T 06 - TN Road to Nachiyaputhur road to Karuppanampatti Kottukottam road Km. 0/0 - 4/250 Clearing and Grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. (i) (A) - By Manual Means (In Area of Non - Thorny Jungle) 'Km : 0/000 - 4/250
Scarifying the Existing Bituminous road surface to a depth of 100 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. 'Km : 0/000 - 4/250
Construction of Embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 'Km. 0/0 - 1/0
Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Gravel Shoulder) 'Km. 0/0 - 1/0
Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 (WMM).Km. 0/0 - 1/0
Providing and laying Bituminous Macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504. (i) Low Porosity 'Km. 0/0 - 0/1
Providing and applying Prime Coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502. (i) Low Porosity 'Km. 0/0 - 1/0
Providing and applying Tack Coat with Bitumen Emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared Granular surface treated with Primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 (ii). Low Porosity 'Km. 0/0 - 1/0
Providing, laying and rolling of Close-Graded Premix surfacing material of 25 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 [MIX SEAL SURFACING]. (i) Low Porosity 'Km. 0/0 - 0/1
NEW TECHNOLOGY [WASTE PLASTIC]Providing and laying Bituminous Macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504.[WASTE PLASTIC] Low Porosity 'Km. 0/1 - 1/0
Providing, laying and rolling of close-graded premix surfacing material of 25 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 [MIX SEAL SURFACING-WASTE PLASTIC]. 'Km. 0/1 - 1/0
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. Pipe culvert at : 2300
Pipe culvert at : 3800
Removal of Body wall
Removal of Body wall
Slab culvert at : Slab culvert at : 300
Slab culvert at : Slab culvert at :2200
Removal of Abutment & Wings 300
Removal of Abutment & Wings 2200
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable 1 Row Pipe Culvert @ Ch. 300,
1 Row Pipe Culvert @ Ch. 2200
1 Row Pipe Culvert @ Ch. 2300,
1 Row Pipe Culvert @ Ch. 3800,
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. 1 Row Pipe Culvert @ Ch. 300,
1 Row Pipe Culvert @ Ch. 2200
1 Row Pipe Culvert @ Ch. 2300,
1 Row Pipe Culvert @ Ch. 3800,
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering , centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. 1 Row Pipe Culvert @ Ch. 300,
1 Row Pipe Culvert @ Ch. 2200,
1 Row Pipe Culvert @ Ch. 2200,
1 Row Pipe Culvert @ Ch. 3800,
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed . For Footings as 4% Rate for Centering Works 1 Row Pipe Culvert @ Ch. 300,
1 Row Pipe Culvert @ Ch. 2200,
1 Row Pipe Culvert @ Ch. 2300,
1 Row Pipe Culvert @ Ch. 3800,
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For STEM as 10% Rate for Centering Works 1 Row Pipe Culvert @ Ch. 300,
1 Row Pipe Culvert @ Ch. 2200,
1 Row Pipe Culvert @ Ch. 2300,
1 Row Pipe Culvert @ Ch. 3800,
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer. 1 Row Pipe Culvert @ Ch. 300,
1 Row Pipe Culvert @ Ch. 2200,
1 Row Pipe Culvert @ Ch. 2300,
1 Row Pipe Culvert @ Ch. 3800,
Providing and Laying reinforced Cement Concrete pipe NP3 for Culverts on first bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation protection works backfilling concrete and masonry works in head walls and parapets 1 Row Pipe Culvert @ Ch. 300,
1 Row Pipe Culvert @ Ch. 2200,
1 Row Pipe Culvert @ Ch. 2300,
1 Row Pipe Culvert @ Ch. 3800,
Construction of Gravel/Soil-aggregate Base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller to achieve the desired density, complete as per Technical Specifications Clause 401 Grading III (GSB). 1 Row Pipe Culvert @ Ch. 300,
1 Row Pipe Culvert @ Ch. 2200,
1 Row Pipe Culvert @ Ch. 2300,
1 Row Pipe Culvert @ Ch. 3800,
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. Pipe culvert at : 1500
Pipe culvert at : 2600
Pipe culvert at : 3210
Pipe culvert at : 3300
Removal of Body wall
Removal of Body wall
Removal of Body wall
Removal of Body wall
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable 2 Row Pipe Culvert @ Ch. 1500,
2 Row Pipe Culvert @ Ch. 2600,
2 Row Pipe Culvert @ Ch. 3210
2 Row Pipe Culvert @ Ch. 3300
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. 2 Row Pipe Culvert @ Ch. 1500,
2 Row Pipe Culvert @ Ch. 2600,
2 Row Pipe Culvert @ Ch. 3210
2 Row Pipe Culvert @ Ch. 3300
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering , centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. 2 Row Pipe Culvert @ Ch. 1500,
2 Row Pipe Culvert @ Ch. 2600,
2 Row Pipe Culvert @ Ch. 3210
2 Row Pipe Culvert @ Ch. 3300
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed . For Footings as 4% Rate for Centering Works 2 Row Pipe Culvert @ Ch. 1500,
2 Row Pipe Culvert @ Ch. 2600,
2 Row Pipe Culvert @ Ch. 3210
2 Row Pipe Culvert @ Ch. 3300
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For STEM as 10% Rate for Centering Works 2 Row Pipe Culvert @ Ch. 1500,
2 Row Pipe Culvert @ Ch. 2600,
2 Row Pipe Culvert @ Ch. 3210
2 Row Pipe Culvert @ Ch. 3300
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer. 2 Row Pipe Culvert @ Ch. 1500,
2 Row Pipe Culvert @ Ch. 2600,
2 Row Pipe Culvert @ Ch. 3210
2 Row Pipe Culvert @ Ch. 3300
Providing and Laying reinforced Cement Concrete pipe NP3 for Culverts on first bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation protection works backfilling concrete and masonry works in head walls and parapets 2 Row Pipe Culvert @ Ch. 1500,
2 Row Pipe Culvert @ Ch. 2600,
2 Row Pipe Culvert @ Ch. 3210
2 Row Pipe Culvert @ Ch. 3300
Construction of Gravel/Soil-aggregate Base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller to achieve the desired density, complete as per Technical Specifications Clause 401 Grading III (GSB). 2 Row Pipe Culvert @ Ch. 1500,
2 Row Pipe Culvert @ Ch. 2600,
2 Row Pipe Culvert @ Ch. 3210, 3300,
2 Row Pipe Culvert @ Ch. 3210, 3300,
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. Causeway at : 2310 Removal of Wearing Coat & CC
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable 2 x 5.0mCulvert @ Ch. 2310
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. 2 x 5.0mCulvert @ Ch. 2310
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering , centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. 2 x 5.0mCulvert @ Ch. 2310
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed . For Footings as 4% Rate for Centering Works 2 x 5.0mCulvert @ Ch. 2310
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For STEM as 10% Rate for Centering Works 2 x 5.0mCulvert @ Ch. 2310
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. 2 x 5.0mCulvert @ Ch. 2310
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor. 2 x 5.0mCulvert @ Ch. 2310
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab 2 x 5.0mCulvert @ Ch. 2310
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab 2 x 5.0mCulvert @ Ch. 2310
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 2 x 5.0mCulvert @ Ch. 2310
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer. 2 x 5.0mCulvert @ Ch. 2310
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. Causeway at : 3700 Removal of Wearing Coat & CC
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable 3 x 5.0mCulvert @ Ch. 3700
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. 3 x 5.0mCulvert @ Ch. 3700
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering , centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. 3 x 5.0mCulvert @ Ch. 3700
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed . For Footings as 4% Rate for Centering Works 3 x 5.0mCulvert @ Ch. 3700
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For STEM as 10% Rate for Centering Works 3 x 5.0mCulvert @ Ch. 3700
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. 3 x 5.0mCulvert @ Ch. 3700
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor. 3 x 5.0mCulvert @ Ch. 3700
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab 3 x 5.0mCulvert @ Ch. 3700
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab 3 x 5.0mCulvert @ Ch. 3700
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 3 x 5.0mCulvert @ Ch. 3700
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer. 3 x 5.0mCulvert @ Ch. 3700
Provision of Rumble strips covered with premix bituminous carpet, 15-20 mm high at centre, 250 mm wide placed at 1 m centre-to-centre at approved locations to control speed, marked with white strips of road marking paint. 'Km. 0/0 - 1/0
Provision for Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
Provision for Road Marker/ Road stud with lens Reflector
Provision for Name Board
Provision for PMGSY Logo Board
Provision for Sign Board (1 curve =2Nos)
Provision for Chevron Sign Octogan Board (90cm)
Provision for Mandatory Sign Board
Provision for Reflector - Traffic signs (Near culverts & trees) - Star sign Sticker
Provision for Citizen Board
Provision for MaintanenceBoard
Provision for KM Stone
Provision for HM Stone
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
K SURESH
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid